Skip to content
Defdex

Timeline11

  1. First flightConfirmed

    F-35A completes first flight

    First flight of the conventional-takeoff F-35A; this does not date the earlier X-35 demonstrator or later F-35B/C first flights.

    SourcesLockheed Martin

  2. First flightConfirmed

    F-35B completes first flight

    First flight of the short-takeoff/vertical-landing F-35B variant; distinct from both the X-35B demonstrator and the earlier F-35A flight.

    SourcesLockheed Martin

  3. First flightConfirmed

    F-35C completes first flight

    First flight of the carrier variant, separately dated from the F-35A and F-35B.

    SourcesLockheed Martin

  4. First deliveryConfirmed

    USAF accepts first production F-35A

    Formal acceptance of AF-7 took place at Fort Worth on May 5; the aircraft flew to Edwards the next day for flight testing. This was not operational readiness.

    SourcesLockheed Martin

  5. ExportConfirmed

    First international F-35 delivered to United Kingdom

    The first international delivery was an F-35B for the United Kingdom; delivery does not indicate UK operational capability.

    SourcesLockheed Martin

  6. Initial operating capabilityConfirmed

    Marine Corps declares F-35B IOC

    Variant-specific IOC; not a declaration for the entire F-35 family.

    SourcesAir Force Test Center

  7. Initial operating capabilityConfirmed

    USAF declares F-35A initial operational capability

    The conventional-takeoff F-35A met the Air Force’s initial readiness criteria. This declaration is variant- and operator-specific.

    SourcesU.S. Air Force

  8. Combat useConfirmed

    US Marine Corps F-35B conducts first combat strikes

    Marine Corps F-35Bs struck targets in Afghanistan during Operation Freedom’s Sentinel. This dates US F-35B combat use, not the first combat use by every F-35 operator.

    SourcesU.S. Department of Defense

  9. Initial operating capabilityConfirmed

    US Navy declares F-35C initial operational capability

    The carrier variant achieved IOC after VFA-147 completed carrier qualifications and safe-for-flight certification.

    SourcesU.S. Navy

  10. Combat useConfirmed

    USAF F-35As conduct first combat strike

    Two USAF F-35As struck an ISIS tunnel network and weapons cache in Iraq. This is the US Air Force milestone, not the Israeli F-35I combat debut.

    SourcesU.S. Air Force

  11. MilestoneConfirmed

    F-35 program delivers 191 aircraft during 2025

    Lockheed Martin reported 191 deliveries across the family for calendar year 2025. This is an annual production-delivery milestone, not a claim that all aircraft shared the same software configuration.

    SourcesLockheed Martin

Solid entries are confirmed, outlined reported, dashed estimated or still to come; dotted italic entries are speculative. Dates show only the precision the sources give.

Built with1

Cost to the government

  • Lifecycle costConfirmed
    $1.58T
    Dollar basis not stated

    Sustainment (operating and support) cost estimate through 2088, GAO-24-106703 (April 2024) as cited by CRS; sustainment only, not acquisition.

  • Total acquisition costConfirmed
    $485.20B
    Then-year $ · 2,470 units

    Dec 2023 F-35 SAR via CRS: then-year development + procurement + MilCon for airframe ($401.1B) plus engine ($84.1B). In constant FY2012 dollars the airframe subprogram is ~$291.8B.

  • Unit cost (flyaway)Reported
    $92.0M
    Estimate / observation: 2026-09 · Then-year $

    F-35A average price for Lots 18-19 as confirmed by the F-35 JPO to Breaking Defense (reported Sept 2026); up 11.5% from $82.5M in Lots 15-17. Same reports: F-35B $121.4M (from $109M), F-35C $110.8M (from $102.1M). Recorded for the F-35A variant.

  • Unit cost (APUC)Confirmed
    $133M
    BY2012 $ · 2,456 units

    Average procurement unit cost as of the December 2023 SAR, constant CY2012 dollars (via CRS R48304).

  • Unit cost (PAUC)Confirmed
    $162M
    BY2012 $ · 2,470 units

    Program acquisition unit cost as of the December 2023 SAR, constant CY2012 dollars (via CRS R48304).

  • Contract unit priceReported
    $82.4M
    Estimate / observation: 2025-09-29 · Then-year $ · 296 units

    Lots 18-19 definitized Sept 29, 2025: $24.29B for 296 airframes, average $82.4M per airframe across all variants and customers (Air & Space Forces Magazine calculation). Excludes F135 engines (GFE).

Earlier cost observations (3)
  • F-35 Lightning II · Contract unit price · $81.1M
    Estimate / observation: 2024-12 · Then-year $ · 145 units

    Lot 18 undefinitized contract action (Dec 2024), not-to-exceed $11.76B for 145 aircraft: average $81.1M per airframe (excludes engines), per Air & Space Forces Magazine.

    Air & Space Forces Magazine
  • F-35 Lightning II · Unit cost (flyaway) · $82.5M
    Estimate / observation: 2023-10 · Then-year $

    F-35A average flyaway cost for Lots 15-17 (delivered CY2023-2025) per F-35 JPO spokesman Russ Goemaere to Breaking Defense; F-35B $109M and F-35C $102.1M for the same lots. JPO flyaway = airframe, vehicle systems, mission systems, engine and ECO costs.

    Breaking Defense
  • F-35 Lightning II · Unit cost (flyaway) · $62.2M
    BY2012 $

    F-35A average unit recurring flyaway cost (Dec 2023 SAR, CY2012 $), assuming 918 international sales; F-35B $74.6M, F-35C $77.2M.

    Congressional Research Service
Budget by fiscal year
Fiscal yearAppropriationRequestEnactedQtyBudget lineSource
FY2027RDT&E$4.49B———Office of the Under Secretary of War (Comptroller)Confirmed
FY2027Procurement$16.89B—85—Office of the Under Secretary of War (Comptroller)Confirmed
FY2027Total$21.38B—85—Office of the Under Secretary of War (Comptroller)Confirmed
FY2026RDT&E$2.20B$1.81B——Office of the Under Secretary of War (Comptroller)Confirmed
FY2026Procurement$10.92B$11.42B47—Office of the Under Secretary of War (Comptroller)Confirmed
FY2026Total$13.12B$13.23B47—Office of the Under Secretary of War (Comptroller)Confirmed
FY2025RDT&E—$2.13B——Office of the Under Secretary of War (Comptroller)Confirmed
FY2025Procurement—$11.21B74—Office of the Under Secretary of War (Comptroller)Confirmed
FY2025Total—$13.33B74—Office of the Under Secretary of War (Comptroller)Confirmed

Unit costs and contract unit prices for this product, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.

News3

Sources21

  1. 1.

    Times of India · Sep 5, 2026 · Supports: Cost · amount

    “now costs USD 92 million, up from USD 82.5 million”
  2. 2.

    Lockheed Martin · Jan 7, 2026 · Supports: System milestone

    “delivered 191 F-35s in 2025, surpassing the previous delivery record of 142 jets.”
  3. 3.

    Air & Space Forces Magazine · Sep 30, 2025 · Supports: Cost · amount

    “That puts the average cost of the airframe across all variants and customers at $82.4 million.”
  4. 4.

    Air & Space Forces Magazine · Aug 25, 2025 · Supports: Cost · amount

    “a deal not to exceed $11.76 billion for 145 aircraft, an average cost of $81.1 million”
  5. 5.

    Congressional Research Service · Dec 11, 2024 · Supports: Cost · amount

    “The corresponding engine cost is $84.1 billion, for a total program cost of $485.2 billion.”
  6. 6.

    Sam Eckholm · Sep 21, 2024 · Supports: System · name

    “F-35”
  7. 7.

    Sam Eckholm · Mar 2, 2024 · Supports: System · name

    “F-35”
  8. 8.

    Breaking Defense · Oct 26, 2023 · Supports: Cost · amount

    “flyaway cost of $82.5 million”
  9. 9.

    Sam Eckholm · Jul 31, 2021 · Supports: System · name

    “F-35”
  10. 10.

    Air Force Test Center · Jul 31, 2020 · Supports: System milestone

    “The U.S. Marine Corps declared Initial Operational Capability with the F-35B.”
  11. 11.

    U.S. Air Force · Apr 30, 2019 · Supports: System milestone

    “This strike marked the F-35A’s first combat employment.”
  12. 12.

    U.S. Navy · Feb 28, 2019 · Supports: System milestone

    “the F-35C Lightning II, met all requirements and achieved Initial Operational Capability”
  13. 13.

    U.S. Department of Defense · Sep 28, 2018 · Supports: System milestone

    “The Marine Corps F-35B Lightning II conducted its first combat strikes”
  14. 14.

    U.S. Air Force · Aug 3, 2016 · Supports: System milestone

    “Officials announced Aug. 2, 2016, that the F-35A Lightning II aircraft has achieved initial combat capability.”
  15. 15.

    Lockheed Martin · May 9, 2011 · Supports: System milestone

    “The signing of formal acceptance documents for the jet, known as AF-7”
  16. 16.

    Lockheed Martin · Dec 15, 2006 · Supports: System, System milestone

    “F-35 Lightning II lifted into the skies today for the first time”
  17. 17.

    Office of the Under Secretary of War (Comptroller) · Supports: Cost · amount

    “F-35 Joint Strike Fighter ... 9,920.5 - 1,000.0 47 10,920.5 Total 86 14,271.4”
  18. 18.

    Office of the Under Secretary of War (Comptroller) · Supports: Cost · amount

    “F-35 Joint Strike Fighter ... 2,060.9 - 819.3 992.8 1,812.2 - 30 40”
  19. 19.

    Defense Mirror · Supports: Cost · amount

    “The average F-35A price in Lots 18 and 19 will be about $92 million, up from $82.5 million.”
  20. 20.

    Lockheed Martin · Supports: System milestone

    “F-35C completes its first flight.”
  21. 21.

    Pratt & Whitney · Supports: System · system component:f135

    “The F-35 Joint Strike Fighter (JSF), powered by Pratt & Whitney’s F135 engine”

Each fact on this page is attached to the sources that support it. Archived copies are linked when we keep one.