Leonardo DRS: Prime Awards
All 7,659 federal prime contract awards since FY2008, $12.94B obligated, including subsidiaries. Largest obligation first.
← Back to Leonardo DRS
Awards 1–100 of 7,659 · page 1 of 77
- Low Rate Initial Production/full Rate Production for the Joint Assault Bridge.U.S. Army · USAspending ↗$443MMay 11, 2016
- The Purpose of This New Undefinitized Contract Is to Procure 146 Each Abrams Active Protection Systems, 826 Each Abrams Countermeasures, and 27 Kits of the Abrams Calibration/maintenance Kits for the Department of the Army and the United States Marine Corps.U.S. Army · USAspending ↗$432MJun 15, 2018
- Nre; IGF::OT::IGF R&D Contract for DaircmU.S. Navy · USAspending ↗$232MMar 24, 2016
- Delivery Order for 2.8 Kits and Cables for Drs.Defense Logistics Agency · USAspending ↗$199MFeb 12, 2025
- AN/AAQ-45 Daircm - Mass Models, Edms and Prms for Sensors, Processors, Lasers and Fiber Kits As Well As Test Benches, Test Equipment and ToolingU.S. Navy · USAspending ↗$179MJun 11, 2020
- Procurement of 15 Stryker'sU.S. Army · USAspending ↗$164MAug 22, 2025
- Missile Spares ProcurementDefense Logistics Agency · USAspending ↗$162MAug 21, 2023
- Mfocs OrderDefense Information Systems Agency · USAspending ↗$142MMar 28, 2019
- Dpas Dx RatedU.S. Army · USAspending ↗$138MOct 5, 2007
- Delivery Order to Drs Network & Imaging Systems, LLC (Drs) for A Quantity of 17,013 Fws-i Systems Against Clin 0005U.S. Army · USAspending ↗$134MSep 14, 2023
- Mounted Family of Computer Systems (Mfocs) Block II Hardware OrderDefense Information Systems Agency · USAspending ↗$132MMar 20, 2020
- Thermal Weapon SightU.S. Army · USAspending ↗$120MMar 6, 2009
- Deobligation for Slins Provided in P00027.U.S. Army · USAspending ↗$117MOct 3, 2007
- Delivery Order to Drs Network and Imaging for A Quantity of 9,754 Fws-i Systems Against Clin 0005U.S. Army · USAspending ↗$117MJun 27, 2024
- Pu W/ Gps Capability ReadyDefense Information Systems Agency · USAspending ↗$112MDec 20, 2023
- Mounted Family of Computer Systems (Mfocs) Block II FY-21 Hardware OrderDefense Information Systems Agency · USAspending ↗$106MMar 11, 2021
- Procurement of 274 Each M1000 TrailersU.S. Army · USAspending ↗$105MMay 20, 2009
- This Task Order Is for Capability Development Document INCREMENT-1, Procurement of 10 Configuration B Vehicles and Associated Spares.U.S. Army · USAspending ↗$103MOct 7, 2022
- M1200 Service Technical SupportU.S. Army · ABRAMS M1A2 SEPV4 · USAspending ↗$101MMay 8, 2009
- Award for Improved Bradley Acquisition Subsystem Engineering Services for A Base Year in FY18 and Options in FY19-21U.S. Army · USAspending ↗$99.5MDec 1, 2017
- 275 Each Het M1000 Semi Trailers.U.S. Army · USAspending ↗$94.5MFeb 3, 2010
- Amdr Pcm for DDG-51 Class Flight IIIU.S. Navy · USAspending ↗$92.6MSep 11, 2014
- Mfocs Processing Unit (Pu)Defense Information Systems Agency · USAspending ↗$89.4MMar 10, 2022
- Basic Award for Logistic Support ServicesU.S. Army · USAspending ↗$89.2MSep 14, 2011
- The Purpose of This Delivery Order 0037 Is to Procure 92,140 Mounted Family of Computer Systems (M-focs) Hardware Items in Support of Pm Mission Command.U.S. Army · USAspending ↗$88.2MMay 2, 2018
- This Is An Undefinitized Letter Contract with Drs for the Expeditionary Water Packaging System (Ewps)U.S. Army · USAspending ↗$82.7MDec 10, 2009
- Procure A Quantity of 800 Each Tank Rack Modules (Trms). 380 Each for Initial Production and 420 Each for Out Year Production. Procurement Includes Priced Options for Ancillary Hardware Required for Fielding and Preservation and Packaging Required for Long Term Storage.U.S. Army · USAspending ↗$77.2MFeb 17, 2012
- FY-23 Mfocs-ii OrderDefense Information Systems Agency · USAspending ↗$76.8MDec 30, 2022
- Integrated Voice Communication System -U.S. Navy · USAspending ↗$76.2MFeb 3, 2015
- Purchase Family of Weapon Sights-individual (Fws-i) Systems. Fws-i Is A Weapon Mounted Long-wave Infrared Sensor That Provides Imagery, Including A Reticle, Bore Sighted to the Host Weapon (M4, M249) That Can Operate in Battlefield Conditions.U.S. Army · USAspending ↗$76.1MJul 8, 2025
- Hwts (Includes Warranty Cost)U.S. Army · USAspending ↗$72.2MMar 24, 2010
- IGF::OT::IGF Tunner 60K Aircraft Cargo Loader Overhauls/vehicle ModificationsU.S. Air Force · PERFORMANCE BASED LOGISTICS (PBL) · USAspending ↗$69.4MDec 22, 2014
- Thermal Weapon Sights(includes Warranty Cost)U.S. Army · USAspending ↗$68.1MFeb 11, 2011
- HwtsU.S. Army · USAspending ↗$67.5MMar 29, 2010
- Fws-i SystemsU.S. Army · USAspending ↗$63.8MSep 17, 2025
- The Third Generation Forward Looking Infrared (3GEN Flir) LRIP Low Rate Initial Production (LRIP) Dewar Cooler Bench (Dcb) ProgramU.S. Army · USAspending ↗$62.6MAug 23, 2022
- Engineering ServicesU.S. Navy · USAspending ↗$61.2MSep 26, 2013
- IGF::OT::IGF Dsests/ Ed Sts and RepairU.S. Army · USAspending ↗$59.7MApr 13, 2012
- To Procure 55,280 Mounted Family of Computer Systems (M-focs) Hardware Items in Support of Project Manager Mission Command (Pm Mc), and Several Other Army Commands.U.S. Army · USAspending ↗$58.9MJul 14, 2017
- Delivery Order for the Procurement of 210 Ibas 2.8 Block Upgrade Kits in Support of the Bradley Fighting Vehicle.Defense Logistics Agency · USAspending ↗$54.0MJun 3, 2026
- Contract Is for the Procurement for Improved Bradley Acquisition Subsystem Engineering Services Fiscal Year 22-26.U.S. Army · USAspending ↗$53.7MJul 26, 2022
- Inod Blk III - ArmyU.S. Army · USAspending ↗$52.5MJun 28, 2024
- The Purpose of This Delivery Order 0034 Is to Procure 36,086 Mounted Family of Computer Systems (M-focs) Hardware Items in Support of Project Manager Mission Command (Pm Mc), Joint Battle Command Platform (Jbc-p) and Navy.U.S. Army · USAspending ↗$51.3MNov 14, 2017
- Thermal Weapon SightsU.S. Army · USAspending ↗$51.0MFeb 5, 2008
- Jets FRP Systems - PY5U.S. Army · USAspending ↗$48.7MJun 28, 2021
- Jordan Military Electronic Warfare System Electronic Warfare Battalion Phase 2 Under FMS Jo-b-ybnU.S. Army · USAspending ↗$47.8MDec 21, 2016
- Purchase of Hemat TrailersU.S. Army · USAspending ↗$47.2MSep 11, 2008
- Work Directive (Wd) for Main Battle Tank Systems (Mbts) to Perform M1A1 Embedded Diagnostics (Ed) Post Production Software SupportU.S. Army · USAspending ↗$46.8MNov 16, 2018
- Ssds/acds/cds System Engineering and Fabrication SupportU.S. Navy · USAspending ↗$46.5MMar 26, 2010
- Jets Product Verification Test SystemsU.S. Army · USAspending ↗$45.5MSep 23, 2016
- Long Procurement Lead Time Materials for DDG-1000 Integrated Fight Through Power System Land Based Test SiteU.S. Navy · USAspending ↗$44.5MJan 22, 2009
- The Following Requirement Under FMS Case Pl-b-udt Is for Css Sw Development, System Integration Lab (Sil) B Conus, Vehicle Site Survey, Engineering ServiceU.S. Army · USAspending ↗$43.9MDec 9, 2022
- Eight (8) Spare Nsns for the Ibas Weapon SystemDefense Logistics Agency · USAspending ↗$43.3MSep 24, 2020
- The Purpose of This Delivery Order Is to Provide Funds for Tru.U.S. Army · USAspending ↗$42.9MJun 17, 2022
- M1200 Armored KnightU.S. Army · USAspending ↗$39.8MJul 30, 2010
- DLA Spares Ibas Block 2.8 Kits and InstallationDefense Logistics Agency · USAspending ↗$39.3MSep 24, 2022
- Program ManagerU.S. Navy · USAspending ↗$39.1MSep 25, 2009
- 1 YearU.S. Navy · USAspending ↗$39.0MSep 29, 2008
- Fws- Cs EMDU.S. Army · USAspending ↗$38.7MSep 26, 2016
- To Procure 9,466 MSD-V4R Kits, 9,466 Windows Operating Systems, 438 Mil-std Adapters.U.S. Army · USAspending ↗$38.0MMar 27, 2020
- Joint Effect Targeting Systems (Jets) Target Location Designator Systems (Tlds)additional Low Rate Initial Production Systems - PY1. New Order of 176 Additional Low Rate Initial Production Systems.U.S. Army · USAspending ↗$37.6MJun 28, 2017
- Bradley System Technical Support and Sustainment System Technical Support for All on Vehicle Components (E.g. Power, Diagnostics, and Optics Hardware and Software Systems) That Are Source-controlled to Drs.U.S. Army · USAspending ↗$37.2MApr 18, 2019
- IGF::OT::IGF the Purpose of This Contract, W909MY-16-C-0009, for Third Generation Forward Looking Infrared (3GEN Flir) Is to Design, Develop, Fabricate and Qualify A Producible Dewar Cooler Bench (Dcb) to Improve the U.S. Army's Existing Flir Sensor Technology and Provide Enhanced Capabilities for Reconnaissance, Surveillance and Target Acquisition. the U.S. Army Requires Sensor Technology with the Capability to Correctly Identify Detected Ground Targets Beyond the Maximum Effective Range of Enemy Weapons Systems. the End-state Objectives Are to Have Interchangeable Components for the Dcb, Afocal, Imager and Circuit Card Assemblies (Cca) Similar to the Architecture of Second Generation Flir.U.S. Army · USAspending ↗$36.9MMar 15, 2016
- This Delivery Order Procures Equipment and Spares in Support of the Second Generation Forward Looking Infrared System.U.S. Army · USAspending ↗$36.6MDec 17, 2024
- Noun: Periscope Head Asse NSN: 1240014424825 Pn: 13588710Defense Logistics Agency · USAspending ↗$36.0MFeb 7, 2025
- Rapid Development, Production, Deployment, and Support of the Mobile-low, Slow, Small Unmanned Aircraft System (Uas) Integrated Defeat System (M-lids) Variants to Requiring Theaters.U.S. Army · USAspending ↗$35.4MJan 31, 2019
- This Delivery Order Procures Improved Night/day Observation Device Systems.U.S. Army · USAspending ↗$35.3MApr 21, 2023
- Missile Spare ProcurementDefense Logistics Agency · USAspending ↗$35.2MNov 30, 2023
- Dedicated 1 Mbps Ku Satellite Spectrum -U.S. Navy · USAspending ↗$35.0MJun 26, 2012
- Funding Provided for 10,652 Twv Systems for Dve-fos.U.S. Army · USAspending ↗$34.6MSep 10, 2009
- Full Rate Overhaul TAS: 97 4930U.S. Air Force · USAspending ↗$34.2MFeb 28, 2011
- Non-recurring EngineeringU.S. Air Force · USAspending ↗$34.0MJan 29, 2009
- Energy Magazine First Unit (Completion)U.S. Navy · USAspending ↗$33.8MApr 22, 2022
- Jets Additional LRIP Systems - PY2U.S. Army · USAspending ↗$33.7MAug 1, 2018
- This Task Order Is for the Block 2 Requirements Under Jtt-ng.U.S. Army · USAspending ↗$33.7MAug 31, 2022
- Daircm Juons Hardware and Associated Support.U.S. Navy · USAspending ↗$33.5MSep 27, 2022
- Family of Weapon Sights, Sniper (Fws-s) Improved Night and Day Observation Device Block Iii(inod Blk III) Delivery OrderU.S. Army · USAspending ↗$33.1MAug 29, 2024
- Purchase of Second Generation Flir Thermal Receiver Units.U.S. Army · USAspending ↗$32.9MJan 18, 2019
- Delivery Order to Procure MRAP-2 Equipment and Spares. This Order Is Part of the Driver Vision Enhancer - Family of Systems (Dve-fos) Program.U.S. Army · USAspending ↗$32.6MJun 29, 2010
- Tunner Oh Loader SupportU.S. Air Force · USAspending ↗$32.5MJun 30, 2026
- LwtsU.S. Army · USAspending ↗$32.4MMar 27, 2012
- AN/AAQ-45 Daircm Por FY26 Production OrderU.S. Navy · USAspending ↗$32.3MApr 16, 2026
- 200612!007689!2100!W56HZV!TACOM - Warren !W56HZV06C0523 !A!n! !N! ! !20060926!20101231!006265466!006265466!122604846!N!DRS Sustainment Systems, Inc !201 Evans Ln !Saint Louis !MO!63121!65000!510!29!ST. Louis !St. Louis (City) !Missouri !+000012200748!N!N!000000000000!2350!COMBAT Assault & Tactical Veh, Tracked !A4A!COMBAT Vehicles !000 !Not Discernable !336992!E! !1! ! ! ! ! !99990909!B! ! !A! !D!N!J!1!001!N!1G!A!Y!C! ! !N!c!n! ! ! !A!A!A!A!000!A!C!Y! ! ! ! ! ! !0001! !U.S. Army · ABRAMS M1A2 SEPV4 · USAspending ↗$32.2MNov 14, 2007
- UCA for Dvdb Add to ContractDefense Logistics Agency · USAspending ↗$32.0MMar 27, 2024
- Tunner Loader SupportU.S. Air Force · USAspending ↗$31.7MJun 30, 2025
- Services for Mms for OH-58DU.S. Army · KIOWA WARRIOR · USAspending ↗$31.7MDec 20, 2012
- Target AcquisitionDefense Logistics Agency · USAspending ↗$31.2MMar 26, 2019
- UCA for Mobile Gun Solution Increment 1 ProductionU.S. Army · USAspending ↗$31.1MSep 28, 2017
- Letter Contract for the Services to Support the Mobile Gun Solution.U.S. Army · USAspending ↗$30.5MJun 29, 2017
- M-lids to 14U.S. Army · USAspending ↗$30.2MJul 5, 2024
- Services for Mms for KiowaU.S. Army · KIOWA WARRIOR · USAspending ↗$30.1MDec 30, 2009
- Tunner Loader OverhaulU.S. Air Force · USAspending ↗$30.1MDec 30, 2020
- Services for MmsU.S. Army · KIOWA WARRIOR · USAspending ↗$30.0MDec 29, 2008
- Tunner Loader OverhaulU.S. Air Force · USAspending ↗$29.9MDec 27, 2018
- Hourly RateU.S. Navy · USAspending ↗$29.9MMay 17, 2011
- Delivery Order BD10 for Abrams Conversion Total: $20,269,141.59U.S. Army · USAspending ↗$29.9MSep 28, 2010
- This Delivery Order Procures the Low Rate Initial Production QuantityU.S. Army · USAspending ↗$29.8MApr 30, 2021
- Purchase of 146 Second Generation Flir Thermal Receiver Units.U.S. Army · USAspending ↗$29.7MSep 6, 2018
- TAS::97 4930::TAS Ibas SparesU.S. Army · USAspending ↗$29.5MApr 17, 2008
- IGF::OT::IGF Task Order for Tunner Requirements Contract FA8519-14-D-0001, A Performance Based Logistics (Pbl) Services Effort for Material Management, Engineering, Unscheduled Depot Level Maintenance and Loader Deport Overhaul.U.S. Air Force · USAspending ↗$29.3MDec 30, 2015
