Interceptor · Air

AIM-9X Sidewinder

Infrared-guided air-to-air missile with high off-boresight engagement capability.

by RTX · First fielded 2003

FieldedInterceptorAirContract awardJun 26, 2026
  • Milestones3
  • Operators—
  • Components—
  • Programs—
  • Capabilities—
  • Inputs—

Timeline3

  1. First deliveryConfirmed

    First production AIM-9X delivery ceremony

    The ceremony unveiled the first production missile; this is not asserted to be the earliest public disclosure of AIM-9X.

  2. MilestoneConfirmed

    Air Force AIM-9X IOC celebrated

    The Navy and Raytheon celebrated achieved Air Force IOC at Elmendorf AFB. This date identifies the ceremony; the underlying declaration date is unspecified.

  3. Contract awardConfirmed

    $1.1B Navy production contract (Block II)

The latest 10 milestones. Solid entries are confirmed, outlined reported, dashed estimated or still to come; dotted italic entries are speculative. Dates show only the precision the sources give.

In Service

First fielded
2003

Cost to the Government

Missiles · RTX / Raytheon

AIM-9X Sidewinder

Compare platform costs →

Published Air Force budget figures with the procurement scope retained; international orders and annual development funding are shown separately.

USAF flyaway / missile

$622,000

FY2027 discretionary request · Nominal USD; source budget basis

P-40 resource summary, USAF only. Nominal dollar years and annual purchase sizes differ. The FY2027 figure excludes the separately requested mandatory funding; it is not an all-service or lifetime average.

U.S. Air Force ↗

U.S. inventory

Not verified

A current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.

USAF discretionary purchase request

648

FY2027 · U.S. only; stated source scope

Requested missiles, not deliveries or inventory. Mandatory purchases are shown separately where specified.

U.S. Air Force ↗

Annual RDT&E funding

$66.3M / yr

FY2025 · FY2025 budget book · Nominal USD; source budget basis

Missiles & Munitions 5-6. Annual research, development, test and evaluation funding in the March 2024 budget presentation; FY2024 and FY2025 are request figures. Not a lifetime R&D total or actual expenditure.

DoD Comptroller ↗

Cost & funding breakdown

USAF gross weapon-system unit figure

$647,000

FY2027 discretionary request · Nominal USD; source budget basis

Includes procurement support allocated in the P-40 table. Not an export-package price.

U.S. Air Force ↗

Annual purchases are not the stockpile

The budget book separates discretionary procurement from mandatory funding. Neither requested quantity measures missiles remaining after training, transfers or use. Historical unit figures retain their source dollar year.

Operations & sustainment

Annual operations & support

Not verified

A complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.

Cost over time · 6 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

AIM-9X Sidewinder cost history
ObservationMeasureAmountDollar basisEvidence
FY2025 · PB2027 discretionary tableUSAF flyaway / missile

P-40 resource summary, USAF only. Nominal dollar years and annual purchase sizes differ. The FY2027 figure excludes the separately requested mandatory funding; it is not an all-service or lifetime average.

$505,000Nominal USD; source budget basisU.S. Air Force ↗
FY2026 · PB2027 discretionary tableUSAF flyaway / missile

P-40 resource summary, USAF only. Nominal dollar years and annual purchase sizes differ. The FY2027 figure excludes the separately requested mandatory funding; it is not an all-service or lifetime average.

$486,000Nominal USD; source budget basisU.S. Air Force ↗
FY2027 discretionary requestUSAF flyaway / missile

P-40 resource summary, USAF only. Nominal dollar years and annual purchase sizes differ. The FY2027 figure excludes the separately requested mandatory funding; it is not an all-service or lifetime average.

$622,000Nominal USD; source budget basisU.S. Air Force ↗
FY2023 · FY2025 budget bookAnnual RDT&E funding

Missiles & Munitions 5-6. Annual research, development, test and evaluation funding in the March 2024 budget presentation; FY2024 and FY2025 are request figures. Not a lifetime R&D total or actual expenditure.

$66.4M / yrNominal USD; source budget basisDoD Comptroller ↗
FY2024 · FY2025 budget bookAnnual RDT&E funding

Missiles & Munitions 5-6. Annual research, development, test and evaluation funding in the March 2024 budget presentation; FY2024 and FY2025 are request figures. Not a lifetime R&D total or actual expenditure.

$78.4M / yrNominal USD; source budget basisDoD Comptroller ↗
FY2025 · FY2025 budget bookAnnual RDT&E funding

Missiles & Munitions 5-6. Annual research, development, test and evaluation funding in the March 2024 budget presentation; FY2024 and FY2025 are request figures. Not a lifetime R&D total or actual expenditure.

$66.3M / yrNominal USD; source budget basisDoD Comptroller ↗
Contracts & purchasing · 1 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2025-06-04 · Production award

    U.S. Navy → RTX / Raytheon

    $1.1B · quantity not established

    Block II production. The announcement gives a 2,500-per-year production goal, not the number bought under this award.

    RTX ↗

Connected missiles & systems

  • Air-defense system and missile

    NASAMS →

    Manufacturer lists supported missile families; individual national configurations vary.

    Kongsberg ↗
  • Launcher and interceptor

    IFPC Increment 2 / Enduring Shield

    Army FY2027 IFPC procurement explicitly includes AIM-9X interceptors and magazines.

    U.S. Army ↗

International buyers

No international purchase documented in this review.

Coverage & open research
  • Current U.S. inventory and complete annual operating-and-support costs require additional public evidence.
  • Buyer records are selected examples, not a complete global order book.
  • The displayed R&D reference is annual funding or a specified multi-year request window, not a verified lifetime total.
  • Additional primary-source international purchase and delivery records remain to be reviewed.
  • Unit cost (per round)Confirmed
    $507K
    Then-year $ · 504 units

    Army IFPC Inc 2 AIM-9X interceptor buy (via Navy/Raytheon contract), FY 2027 request P-5: $507.050K per missile for 504 (FY2025 $586.222K; FY2026 $516.513K). Navy/Air Force WPN/Missile Procurement books not machine-fetchable.

    Source
  • Unit cost (per round)Reported
    $472K
    Estimate / observation: 2020-02-18 · Then-year $ · FY2021

    FY2021 Air Force budget request average unit price for AIM-9X (Block II and Block II+) as reported by The War Zone from official budget documents; Navy FY2021 average was $430,818 (not recorded separately: same natural key).

    Source
Budget by fiscal year
Fiscal yearAppropriationRequestEnactedQtyBudget lineSource
FY2027RDT&E$221M———SourceConfirmed
FY2027Procurement$594M—954—SourceConfirmed
FY2027Total$815M—954—SourceConfirmed
FY2026RDT&E$121M$120M——SourceConfirmed
FY2026Procurement$185M$235M319—SourceConfirmed
FY2026Total$306M$355M319—SourceConfirmed
FY2025RDT&E—$66.3M——SourceConfirmed
FY2025Procurement—$188M293—SourceConfirmed
FY2025Total—$254M293—SourceConfirmed

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.