Skip to content
DefDex

Aircraft · Air

C-130 Hercules

Tactical airlift aircraft family with transport and specialized mission variants.

by Lockheed Martin

FieldedAircraftAir
af.mil/about-us/fact-sheets/display/article/1555054/c-130-hercules
  • Milestones0
  • Operators—
  • Components—
  • Programs—
  • Capabilities—
  • Inputs—
A C-130 Hercules taxiing at Fairchild Air Force Base during Mobility Guardian 2019

Photo: U.S. Air Force photo by Tech. Sgt. Larry E. Reid Jr. · Public domain (PD-USGov-Military-Air Force) · Resized and reencoded as WebP; no additional crop. The appearance of U.S. Department of Defense (DoD) visual information does not imply or constitute DoD endorsement. C-130-family photograph; the cost profile specifically covers C-130J.

Timeline

No milestones recorded for C-130 Hercules yet. The timeline fills in as unveilings, tests, contracts and deliveries are sourced.

Cost to the Government

Aircraft · Lockheed Martin

C-130J Super Hercules

Compare platform costs →

The J-model transport cost profile within the broader Hercules family; special-mission AC, HC, MC and tanker KC variants require separate cost records.

Published acquisition / aircraft

$75.5M

FY2018 GAO study · FY2017 USD

Historical fact-sheet figure; not a current replacement quote.

U.S. Air Force ↗

Published U.S. fleet snapshot

120

FY2018 GAO study · U.S. only

Dated source population, not operational availability. C-130J excludes other Hercules variants.

GAO ↗

Procurement program quantity

178

2019-12 SAR · U.S. only

Includes congressional additions and replacement aircraft; not delivered inventory.

Department of Defense ↗

C-130J program R&D total

$390.6M

2019-12 SAR · Then-year USD

U.S. transport program scope; excludes separate special-mission acquisition programs.

Department of Defense ↗

Cost & funding breakdown

Average procurement / aircraft

$79.979M

2019-12 SAR · Then-year USD

Procurement average includes support; differs from the fact-sheet aircraft cost.

Department of Defense ↗

Reading the cost figures

The fact-sheet acquisition figure uses the dollar basis shown above. GAO’s annual operating and support cost includes a broader ownership scope than the Comptroller reimbursement rate. These figures should not be combined into a single inflation-free trend.

Operations & sustainment

Annual O&S / aircraft

$9.53M / yr

FY2018 · Constant FY2018 USD

Historical average for the source study population; not a marginal mission cost.

GAO ↗

Reimbursement / flight hour

$9,980 / hr

FY2026 · Nominal USD; Other DoD Component

Published billing rate for use by another DoD component. It is not the fully burdened cost of ownership.

DoD Comptroller ↗
Cost over time · 6 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

C-130J Super Hercules cost history
ObservationMeasureAmountDollar basisEvidence
FY2011Annual O&S / aircraft

Historical average for the source study population; not a marginal mission cost.

$11.23M / yrConstant FY2018 USDGAO ↗
FY2018Annual O&S / aircraft

Historical average for the source study population; not a marginal mission cost.

$9.53M / yrConstant FY2018 USDGAO ↗
FY2018 GAO studyPublished acquisition / aircraft

Historical fact-sheet figure; not a current replacement quote.

$75.5MFY2017 USDU.S. Air Force ↗
FY2026Reimbursement / flight hour

Published billing rate for use by another DoD component. It is not the fully burdened cost of ownership.

$9,980 / hrNominal USD; Other DoD ComponentDoD Comptroller ↗
2018-12 SARAverage procurement / aircraft

Prior annual estimate.

$79.742MThen-year USDDepartment of Defense ↗
2019-12 SARAverage procurement / aircraft

Procurement average includes support; differs from the fact-sheet aircraft cost.

$79.979MThen-year USDDepartment of Defense ↗
Contracts & purchasing · 1 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2011-11-18 · Block 8.1 current contract target, Dec. 2019

    U.S. Air Force → Lockheed Martin

    $211.3M · quantity not established

    FA8625-04-D-6452/7; current target grew from $154.2M as upgrade scope expanded. Not aircraft production procurement.

    Department of Defense ↗

International buyers

  • Germany · 6 · FMS acquisition case reported in SAR · 2018-09-28

    Three C-130J-30 and three KC-130J with three years of contractor support; mixed-variant acquisition case.

    Department of Defense ↗
  • France · 4 · FMS acquisition case reported in SAR · 2016-02-17

    Two C-130J-30 and two KC-130J plus sustainment; mixed-variant acquisition case.

    Department of Defense ↗
  • India · 7 · FMS acquisition case reported in SAR · 2014-01-08

    Seven C-130J-30 and three years of support in this case; not a total fleet census.

    Department of Defense ↗
Coverage & open research
  • Figures retain the date and scope of the original source. A historical count, cumulative delivery or procurement plan is not today’s mission-capable inventory.

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.