GBU-53/B StormBreaker weapons mounted beneath an F-15E during weapons evaluation.

Photo: William Lewis · Public domain (PD-USGov) · Full source frame retained; resized without upscaling and encoded as WebP.

Timeline

No milestones recorded for StormBreaker yet. The timeline fills in as unveilings, tests, contracts and deliveries are sourced.

Cost to the Government

Munitions · RTX / Raytheon

GBU-53/B StormBreaker (SDB II)

Compare platform costs →

Air Force all-up-round estimates isolate the weapon from containers, production support and obsolescence spending.

Air Force all-up round / weapon

$274,000

FY2027 request · Nominal USD · source budget basis

SDB002 P-5 recurring AUR estimate, rounded to thousands. Separate weapon containers and support excluded. FY2025 quantity has an internal correction note, so no FY2025 per-unit value is derived from totals.

U.S. Air Force ↗

U.S. inventory

Not verified

A current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.

Air Force requested weapons

373

FY2027 · U.S. only; stated source scope

Air Force only; excludes separate Navy procurement. Not inventory.

U.S. Congress ↗

R&D program total

Not verified

A lifetime program R&D total was not established. Development contracts and shared program budgets are not substituted for that total.

Cost & funding breakdown

Air Force gross procurement request

$194.509M

FY2027 · Nominal USD; source budget basis

373 weapons plus containers, testing, support and obsolescence. Broader scope than recurring AUR hardware.

U.S. Air Force ↗

Air Force SDB annual RDT&E reference

$25.497M / yr

FY2027 total request · PB2027 · Nominal USD; source budget basis

R-1 PE0207327F Small Diameter Bomb. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

Department of Defense Comptroller ↗

Falling quantities can raise the program average

The FY2027 budget requests 373 Air Force weapons and retains support and obsolescence costs. Its gross program average is substantially broader than the $274,000 recurring weapon estimate.

Operations & sustainment

Annual operations & support

Not verified

A complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.

Cost over time · 6 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

GBU-53/B StormBreaker (SDB II) cost history
ObservationMeasureAmountDollar basisEvidence
FY2025 · PB2027Air Force all-up round / weapon

SDB002 P-5 recurring AUR estimate, rounded to thousands. Separate weapon containers and support excluded. FY2025 quantity has an internal correction note, so no FY2025 per-unit value is derived from totals.

$239,000Nominal USD · source budget basisU.S. Air Force ↗
FY2026 · PB2027Air Force all-up round / weapon

SDB002 P-5 recurring AUR estimate, rounded to thousands. Separate weapon containers and support excluded. FY2025 quantity has an internal correction note, so no FY2025 per-unit value is derived from totals.

$265,000Nominal USD · source budget basisU.S. Air Force ↗
FY2027 requestAir Force all-up round / weapon

SDB002 P-5 recurring AUR estimate, rounded to thousands. Separate weapon containers and support excluded. FY2025 quantity has an internal correction note, so no FY2025 per-unit value is derived from totals.

$274,000Nominal USD · source budget basisU.S. Air Force ↗
FY2025 actual · PB2027Air Force SDB annual RDT&E reference

R-1 PE0207327F Small Diameter Bomb. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

$29.047M / yrNominal USD; source budget basisDepartment of Defense Comptroller ↗
FY2026 total enacted / spend plan · PB2027Air Force SDB annual RDT&E reference

R-1 PE0207327F Small Diameter Bomb. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

$24.575M / yrNominal USD; source budget basisDepartment of Defense Comptroller ↗
FY2027 total request · PB2027Air Force SDB annual RDT&E reference

R-1 PE0207327F Small Diameter Bomb. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

$25.497M / yrNominal USD; source budget basisDepartment of Defense Comptroller ↗
Contracts & purchasing · 2 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2024-01-03 · Production award announced

    U.S. Air Force → Raytheon

    $345M · quantity not established

    Source states more than 1,500 weapons; an exact quantity is not supplied and the contract is not divided by 1,500 to claim a precise unit price.

    RTX / Raytheon ↗
  • 2023-06-28 · Proposed sale · congressional notification

    Norway → U.S. Foreign Military Sales

    $293M · 600 units in scope

    600 total SDB II rounds in the revised case, including 20 in the earlier below-threshold case plus 580 added. Includes support; not a confirmed delivered order.

    Congressional Record / DSCA ↗

Connected missiles & systems

International buyers

  • Norway · 600 · Revised proposed sale scope · 2023-06-28

    Total includes 20 previously covered rounds; do not add 600 and 20. Delivery not established.

    Congressional Record / DSCA ↗
Coverage & open research
  • Current U.S. inventory and complete annual operating-and-support costs require additional public evidence.
  • Buyer records are selected examples, not a complete global order book.

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.