Skip to content
DefDex

Missile · Undersea

Trident II D5

Submarine-launched ballistic missile supported by Lockheed Martin and deployed aboard U.S. Ohio-class and UK Vanguard-class submarines. Separate from the next-generation D5LE2 development program.

by Lockheed Martin · First fielded 1990

FieldedMissileUndersea
lockheedmartin.com/en-us/products/trident-ii-d5-fleet-ballistic-missile.html
An unarmed Trident II D5 test missile launches from USS Rhode Island on May 9, 2019.

Photo: John Kowalski · Public domain (PD-USGov) · Full source frame retained; resized without upscaling and encoded as WebP.

Submarine-launched ballistic missile supported by Lockheed Martin and deployed aboard U.S. Ohio-class and UK Vanguard-class submarines. Separate from the next-generation D5LE2 development program.

Timeline

No milestones recorded for Trident II D5 yet. First fielded in 1990. The timeline fills in as unveilings, tests, contracts and deliveries are sourced.

Operators2

  • GBUnited Kingdom
  • USUnited States
First fielded
1990

Cost to the Government

Missiles · Lockheed Martin

Trident II D5 / D5 Life Extension

Compare platform costs →

The Navy’s published unit-cost reference is separated from current D5 life-extension funding, submarine costs and nuclear warheads.

Navy fact-file unit figure

$30.9M

Fact file reviewed 2026-10-09 · USD · dollar year and detailed scope unspecified by source

The Navy publishes $30.9M without defining a dollar year or detailed acquisition boundary. Historical/general reference, not a verified current D5LE or D5LE2 replacement price.

U.S. Navy ↗

U.S. inventory

Not verified

A current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.

U.S. procurement quantity

Not verified

No comparable U.S. procurement quantity was established in this review.

R&D program total

Not verified

A lifetime program R&D total was not established. Development contracts and shared program budgets are not substituted for that total.

Cost & funding breakdown

Trident II modifications · procurement + RDT&E

$5.24B

FY2027 request · Nominal USD · source budget basis

Rounded annual procurement and RDT&E combined, as shown in the overview. Not lifetime program cost or a missile unit price.

DoD Comptroller ↗

Strategic submarine / weapons RDT&E reference

$1.052B / yr

FY2027 total request · PB2027 · Nominal USD; source budget basis

R-1 PE0101221N Strategic Sub & Weapons System Support. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

Department of Defense Comptroller ↗

Missile tubes do not measure missile inventory

The Navy describes submarine compatibility and life extension, but tube capacity cannot establish U.S. missile stockpiles. D5LE2 funding and submarine acquisition are separate, as are nuclear reentry bodies.

Operations & sustainment

Annual operations & support

Not verified

A complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.

Cost over time · 7 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

Trident II D5 / D5 Life Extension cost history
ObservationMeasureAmountDollar basisEvidence
Fact file reviewed 2026-10-09Navy fact-file unit figure

The Navy publishes $30.9M without defining a dollar year or detailed acquisition boundary. Historical/general reference, not a verified current D5LE or D5LE2 replacement price.

$30.9MUSD · dollar year and detailed scope unspecified by sourceU.S. Navy ↗
FY2025 actual · PB2027Trident II modifications · procurement + RDT&E

Rounded annual procurement and RDT&E combined, as shown in the overview. Not lifetime program cost or a missile unit price.

$2.384BNominal USD · source budget basisDoD Comptroller ↗
FY2026 enacted · PB2027Trident II modifications · procurement + RDT&E

Rounded annual procurement and RDT&E combined, as shown in the overview. Not lifetime program cost or a missile unit price.

$4.271BNominal USD · source budget basisDoD Comptroller ↗
FY2027 requestTrident II modifications · procurement + RDT&E

Rounded annual procurement and RDT&E combined, as shown in the overview. Not lifetime program cost or a missile unit price.

$5.24BNominal USD · source budget basisDoD Comptroller ↗
FY2025 actual · PB2027Strategic submarine / weapons RDT&E reference

R-1 PE0101221N Strategic Sub & Weapons System Support. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

$326.596M / yrNominal USD; source budget basisDepartment of Defense Comptroller ↗
FY2026 total enacted / spend plan · PB2027Strategic submarine / weapons RDT&E reference

R-1 PE0101221N Strategic Sub & Weapons System Support. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

$828.337M / yrNominal USD; source budget basisDepartment of Defense Comptroller ↗
FY2027 total request · PB2027Strategic submarine / weapons RDT&E reference

R-1 PE0101221N Strategic Sub & Weapons System Support. Annual appropriation, not lifetime development. FY2026 includes listed reconciliation spend-plan funds; FY2027 is requested funding. Shared scope; cannot be attributed solely to this product.

$1.052B / yrNominal USD; source budget basisDepartment of Defense Comptroller ↗
Contracts & purchasing · 0 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

    No primary-source contract record verified in this review. This does not mean there are no contracts.

    Connected missiles & systems

    • Missile and submarine

      Ohio-class ballistic missile submarine

      D5/D5LE submarine compatibility; missile, submarine and warhead spending are separate.

      U.S. Navy ↗
    • Missile and submarine

      Columbia-class submarine →

      D5/D5LE submarine compatibility; missile, submarine and warhead spending are separate.

      U.S. Navy ↗

    International buyers

    • United Kingdom · Quantity not verified · Operator under Polaris Sales Agreement · Navy fact file · reviewed 2026-10-09

      D5/D5LE supports Vanguard-class submarines. The source does not disclose a current UK purchase quantity or price.

      U.S. Navy ↗
    Coverage & open research
    • A current D5LE/D5LE2 recurring missile price and public U.S. inventory snapshot remain unverified.
    • Current complete operations costs and a Trident-only lifetime R&D total remain unresolved.

    Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.

    Supply Chain Inputs1

    • AMPAC's Cedar City plant is the only DoD-approved domestic source of AP for weapons motors. Northrop Grumman was approved as an alternative source for space launch in 2021. AMPAC is adding a line to raise capacity by more than 50%.

      CriticalConfirmed

    Materials, components and capacity this product depends on. Open an input to see who produces it and the controls on it.