Skip to content
DefDex

SpaceX: Prime Awards

All 284 federal prime contract awards since FY2008, $17.41B obligated, including subsidiaries. Largest obligation first.

← Back to SpaceX

Awards 1–100 of 284 · page 1 of 3

  • IGF::OT::IGF the Commercial Crew Program (Ccp) Commercial Crew Transportation Capability (Cctcap) Contract Will Provide Completion of the Design, Development, Test, Evaluation, and Certification of An Integrated Crew Transportation System (Cts) Capable of Transporting NASA Crew to and From the Iss, in Accordance with the Design Reference Missions and Nasa's Certification Standards and Requirements. Certification of the Cts Will Be Determined by NASA. NASA Plans to Issue Task Orders for Post Certification Missions (Pcm) to and From Iss That Include Ground, Launch, Lifeboat, On-orbit, Return and Recovery Operations. the Minimum Quantity of Missions to Be Ordered Is Two (2) and the Maximum Potential Quantity of Missions Which May Be Ordered Is Six (6). in Addition, NASA May Issue Task Orders for Special Studies Used for Risk Reduction and Other Purposes Related to the Cts. NASA Certification Under Clin 001 Is Complete When the Contractor's Crew Transportation System (Cts) Has Met Nasa's Requirements for Safely Transporting Crew to and From the International Space Station (Iss) in Accordance with Documents Identified in Section C.1, Specifications/statement of Work. Subclins 001A and 001B, Identified in Table B.3,DDTE/CERTIFICATION Subclins, Are Delivery Milestones That Represent Completion of Required Work Necessary to Achieve NASA Certification. Delivery Payment for the Iss Design Certification Review (Dcr) for the Crewed Flight to the Iss Includes All Work Under This Clin That Occurs From the Contract Effective Date Through the Iss Dcr Completion. the Delivery Payment for the Certification Review (Cr) Will Include All Work That Occurs From the Iss Dcr Delivery Date Through the End of the Ddte/certification Clin 001. in Accordance with Clause C.1, Specification/statement of Work, the Task Ordering Procedures and Other Terms and Conditions in the Contract, the Contracting Officer May Issue Post Certification Mission (Pcm) Task Orders. the Contractor Shall Use the Mission Pricing Rates Shown in Table B.4.1, Post Certification Mission Prices. the Per Mission Prices Are for A Single Order at the Price Stated Per the Calendar Year (Cy) Based on the Number of Missions Ordered. Cts Full Mission Capability Prices Shall Be Based on (1) Fulfillment of the Design Reference Mission to the Iss Found in CCT-DRM-1110, Crew Transportation System Design Reference Missions, Attachment J-03, Contract Performance Work Statement, and Other Terms and Conditions in the Contract and (2) All Inherent Cts Capabilities That Are Within the Proposed Mission Prices. in Accordance with Attachment J-03, Contract Performance Work Statement, the Task Ordering Procedures and Other Terms and Conditions in the Contract, the Contractor Shall Perform Special Studies, Test and Analyses, As Initiated by Written Direction From the Contracting Officer. Spacex Cctcap Post Certification Missions 3-6(PCM-3-6) Task Order Against NNK14MA74C Clin 002, As Described in Clause B.4 Post Certification Missions (Idiq)(clin 002) and All Other Applicable Terms and Conditions.NASA · USAspending ↗
    $3.55BDec 30, 2016
  • Work Required for the Design, Development, Manufacture, Test, Launch, Demonstration, and Engineering Support of the Human Landing System (Hls) Integrated Lander.NASA · USAspending ↗
    $3.23BMay 13, 2020
  • National Security Space Launch Phase 3 Lane 1U.S. Air Force · USAspending ↗
    $541MOct 18, 2024
  • Design, Develop, Manufacture, Test, Integrate, Achieve NASA Acceptance, Deliver, and Sustain Its United States Deorbit Vehicle (Usdv) Such That the Usdv Can Perform the Final Deorbit of the International Space Station (Iss)NASA · USAspending ↗
    $426MJun 26, 2024
  • Evolved Expendable Launch Vehicle 1A-6 Launch ServicesU.S. Air Force · USAspending ↗
    $314MFeb 21, 2019
  • IGF::OT::IGF Evolved Expendable Launch Vehicle Global Positioning System III Launch ServicesU.S. Air Force · NSSL · USAspending ↗
    $244MMar 14, 2018
  • IGF::OT::IGF the Commercial Crew Program (Ccp) Commercial Crew Transportation Capability (Cctcap) Contract Will Provide Completion of the Design, Development, Test, Evaluation, and Certification of An Integrated Crew Transportation System (Cts) Capable of Transporting NASA Crew to and From the Iss, in Accordance with the Design Reference Missions and Nasa's Certification Standards and Requirements. Certification of the Cts Will Be Determined by NASA. NASA Plans to Issue Task Orders for Post Certification Missions (Pcm) to and From Iss That Include Ground, Launch, Lifeboat, On-orbit, Return and Recovery Operations. the Minimum Quantity of Missions to Be Ordered Is Two (2) and the Maximum Potential Quantity of Missions Which May Be Ordered Is Six (6). in Addition, NASA May Issue Task Orders for Special Studies Used for Risk Reduction and Other Purposes Related to the Cts. NASA Certification Under Clin 001 Is Complete When the Contractor's Crew Transportation System (Cts) Has Met Nasa's Requirements for Safely Transporting Crew to and From the International Space Station (Iss) in Accordance with Documents Identified in Section C.1, Specifications/statement of Work. Subclins 001A and 001B, Identified in Table B.3,DDTE/CERTIFICATION Subclins, Are Delivery Milestones That Represent Completion of Required Work Necessary to Achieve NASA Certification. Delivery Payment for the Iss Design Certification Review (Dcr) for the Crewed Flight to the Iss Includes All Work Under This Clin That Occurs From the Contract Effective Date Through the Iss Dcr Completion. the Delivery Payment for the Certification Review (Cr) Will Include All Work That Occurs From the Iss Dcr Delivery Date Through the End of the Ddte/certification Clin 001. in Accordance with Clause C.1, Specification/statement of Work, the Task Ordering Procedures and Other Terms and Conditions in the Contract, the Contracting Officer May Issue Post Certification Mission (Pcm) Task Orders. the Contractor Shall Use the Mission Pricing Rates Shown in Table B.4.1, Post Certification Mission Prices. the Per Mission Prices Are for A Single Order at the Price Stated Per the Calendar Year (Cy) Based on the Number of Missions Ordered. Cts Full Mission Capability Prices Shall Be Based on (1) Fulfillment of the Design Reference Mission to the Iss Found in CCT-DRM-1110, Crew Transportation System Design Reference Missions, Attachment J-03, Contract Performance Work Statement, and Other Terms and Conditions in the Contract and (2) All Inherent Cts Capabilities That Are Within the Proposed Mission Prices. in Accordance with Attachment J-03, Contract Performance Work Statement, the Task Ordering Procedures and Other Terms and Conditions in the Contract, the Contractor Shall Perform Special Studies, Test and Analyses, As Initiated by Written Direction From the Contracting Officer. Spacex Cctcap Post Certification Mission 2 (PCM-2) Task Order Against NNK14MA74C Clin 002, As Described in Clause B.4 Post Certification Missions (Idiq)(clin 002) and All Other Applicable Terms and Conditions.NASA · USAspending ↗
    $214MJul 29, 2016
  • IGF::OT::IGF the Commercial Crew Program (Ccp) Commercial Crew Transportation Capability (Cctcap) Contract Will Provide Completion of the Design, Development, Test, Evaluation, and Certification of An Integrated Crew Transportation System (Cts) Capable of Transporting NASA Crew to and From the Iss, in Accordance with the Design Reference Missions and Nasa's Certification Standards and Requirements. Certification of the Cts Will Be Determined by NASA. NASA Plans to Issue Task Orders for Post Certification Missions (Pcm) to and From Iss That Include Ground, Launch, Lifeboat, On-orbit, Return and Recovery Operations. the Minimum Quantity of Missions to Be Ordered Is Two (2) and the Maximum Potential Quantity of Missions Which May Be Ordered Is Six (6). in Addition, NASA May Issue Task Orders for Special Studies Used for Risk Reduction and Other Purposes Related to the Cts. NASA Certification Under Clin 001 Is Complete When the Contractor's Crew Transportation System (Cts) Has Met Nasa's Requirements for Safely Transporting Crew to and From the International Space Station (Iss) in Accordance with Documents Identified in Section C.1, Specifications/statement of Work. Subclins 001A and 001B, Identified in Table B.3,DDTE/CERTIFICATION Subclins, Are Delivery Milestones That Represent Completion of Required Work Necessary to Achieve NASA Certification. Delivery Payment for the Iss Design Certification Review (Dcr) for the Crewed Flight to the Iss Includes All Work Under This Clin That Occurs From the Contract Effective Date Through the Iss Dcr Completion. the Delivery Payment for the Certification Review (Cr) Will Include All Work That Occurs From the Iss Dcr Delivery Date Through the End of the Ddte/certification Clin 001. in Accordance with Clause C.1, Specification/statement of Work, the Task Ordering Procedures and Other Terms and Conditions in the Contract, the Contracting Officer May Issue Post Certification Mission (Pcm) Task Orders. the Contractor Shall Use the Mission Pricing Rates Shown in Table B.4.1, Post Certification Mission Prices. the Per Mission Prices Are for A Single Order at the Price Stated Per the Calendar Year (Cy) Based on the Number of Missions Ordered. Cts Full Mission Capability Prices Shall Be Based on (1) Fulfillment of the Design Reference Mission to the Iss Found in CCT-DRM-1110, Crew Transportation System Design Reference Missions, Attachment J-03, Contract Performance Work Statement, and Other Terms and Conditions in the Contract and (2) All Inherent Cts Capabilities That Are Within the Proposed Mission Prices. in Accordance with Attachment J-03, Contract Performance Work Statement, the Task Ordering Procedures and Other Terms and Conditions in the Contract, the Contractor Shall Perform Special Studies, Test and Analyses, As Initiated by Written Direction From the Contracting Officer. Spacex Cctcap Post Certification Mission 1 (PCM-1) Task Order Against NNK14MA74C Clin 002, As Described in Clause B.4 Post Certification Missions (Idiq)(clin 002) and All Other Applicable Terms and Conditions.NASA · USAspending ↗
    $208MNov 20, 2015
  • Phase 3 Lane 1 Launch Service Task Order (Lsto) for NTO-5U.S. Air Force · USAspending ↗
    $205MJan 9, 2026
  • $199MSep 11, 2024
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $183MJul 25, 2024
  • United States Space Force 67 Launch ServiceU.S. Air Force · USAspending ↗
    $183MAug 18, 2020
  • See Attachment 1, Performance Work Statement (Pws)U.S. Air Force · USAspending ↗
    $182MApr 14, 2025
  • Europa Clipper Launch ServiceNASA · USAspending ↗
    $179MJul 23, 2021
  • National Security Space Launch Services Phase 3, Lane 2U.S. Air Force · USAspending ↗
    $174MJan 13, 2026
  • National Security Space Launch (Nssl) Phase 3 Lane 2 Launch Services ProcurementU.S. Air Force · USAspending ↗
    $170MMay 4, 2026
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $161MJul 22, 2022
  • Phase 3 Lane 1 Launch Service Task Order (Lsto) for SDA-2U.S. Air Force · USAspending ↗
    $160MDec 8, 2025
  • National Security Space Launch ServicesU.S. Air Force · USAspending ↗
    $160MJul 24, 2023
  • $159MDec 4, 2012
  • $158MDec 31, 2020
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $157MAug 16, 2021
  • Sda Tracking Layer Tranche 0, Wide Field of View (Wfov) ProgramImmediate Office of the Secretary of Defense · USAspending ↗
    $155MOct 2, 2020
  • National Security Space Launch Phase 3 Lane 1U.S. Air Force · USAspending ↗
    $155MOct 18, 2024
  • Launch Service for NROL-86U.S. Air Force · USAspending ↗
    $154MJan 12, 2026
  • National Security Space Launch (Nssl) Phase 3 Lane 2 Launch ServicesU.S. Air Force · USAspending ↗
    $154MMay 15, 2025
  • National Security Space Launch (Nssl) Phase 3 Lane 2 Launch Services ProcurementU.S. Air Force · USAspending ↗
    $154MJul 8, 2025
  • Air Force Space COMMAND-52 Launch Services.U.S. Air Force · NSSL · USAspending ↗
    $153MJun 20, 2018
  • Launch Service SupportU.S. Air Force · USAspending ↗
    $153MAug 19, 2020
  • National Security Space Launch (Nssl) Phase 3 Lane 2 Launch Services ProcurementU.S. Air Force · USAspending ↗
    $150MApr 24, 2025
  • FA8811-25-D-B002 Nssl Phase 3 Lane 2 Launch Services for USSF-206U.S. Air Force · USAspending ↗
    $142MApr 1, 2026
  • Best Effort Subscription & Terminals - UkraineDefense Information Systems Agency · USAspending ↗
    $138MAug 8, 2024
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $137MJul 25, 2024
  • SBS005513- Starshield Service SupportU.S. Air Force · USAspending ↗
    $135MNov 14, 2025
  • Commercial Satellite Communications Service and Hardware.U.S. Air Force · USAspending ↗
    $134MDec 12, 2025
  • Pleo Warrior Plan Support: Secure Global Satcom Via Pooled Starshield Service. Enhanced Features, Security, and Central Management for All Missions.U.S. Air Force · USAspending ↗
    $132MMay 22, 2026
  • Gateway Logistics Services (Gls) Contract Award - Space Exploration Technologies (Spacex)NASA · USAspending ↗
    $125MMar 25, 2020
  • National Security Space Launch ServicesU.S. Air Force · USAspending ↗
    $115MJul 24, 2023
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $107MJul 17, 2024
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $105MJul 2, 2024
  • National Security Space Launch Services Phase 2U.S. Air Force · USAspending ↗
    $103MNov 2, 2023
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $101MJun 15, 2023
  • National Security Space Launch Phase 2 Launch Services.U.S. Air Force · USAspending ↗
    $101MMay 25, 2022
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $100MJun 15, 2023
  • National Security Space Launch Services Phase 2U.S. Air Force · USAspending ↗
    $98.7MNov 1, 2023
  • Spacex - Sda T2TL-A Launch ServicesU.S. Air Force · USAspending ↗
    $97.0MJun 17, 2024
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $95.7MJun 15, 2023
  • National Security Space Launch ServicesU.S. Air Force · USAspending ↗
    $94.0MJun 14, 2023
  • National Security Space Launch ServicesU.S. Air Force · USAspending ↗
    $91.8MNov 2, 2023
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $91.7MMay 25, 2022
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $91.4MMay 25, 2022
  • National Security Space Launch ServicesU.S. Air Force · USAspending ↗
    $91.0MJun 14, 2023
  • Spacex Mission Sda T2TL-CU.S. Air Force · USAspending ↗
    $90.3MJun 17, 2024
  • National Security Space Launch ServicesU.S. Air Force · USAspending ↗
    $90.2MNov 2, 2023
  • IGF::OT::IGF Global Positioning System III Launch ServicesU.S. Air Force · NSSL · USAspending ↗
    $89.4MApr 27, 2016
  • $89.1MDec 4, 2012
  • IGF::OT::IGF Launch Services to Put A Satellite Into OrbitU.S. Air Force · NSSL · USAspending ↗
    $88.3MMar 14, 2017
  • National Security Space Launch ServicesU.S. Air Force · USAspending ↗
    $87.1MJun 14, 2023
  • National Security Space Launch Phase 2U.S. Air Force · USAspending ↗
    $87.0MAug 13, 2024
  • National Security Space Launch Phase 3 Lane 2U.S. Air Force · USAspending ↗
    $85.6MJul 1, 2025
  • Phase 3 Lane 1 Launch Service Task Order (Lsto) for SDA-4U.S. Air Force · USAspending ↗
    $84.8MMar 31, 2026
  • National Security Space Launch Phase 3 Lane 2 ProcurementU.S. Air Force · USAspending ↗
    $84.3MJun 2, 2026
  • Launch Service for United States Space Force Mission 36U.S. Air Force · USAspending ↗
    $83.4MMar 9, 2021
  • See Attachment 1 - Performance Work StatementU.S. Air Force · NSSL · USAspending ↗
    $82.9MJun 30, 2025
  • National Security Space Launch Services Phase 2U.S. Air Force · USAspending ↗
    $82.4MNov 7, 2023
  • National Security Space Launch Phase 3 Lane 2U.S. Air Force · USAspending ↗
    $81.6MJul 10, 2025
  • Spacex - Cmsi #1U.S. Air Force · USAspending ↗
    $80.0MJun 17, 2024
  • National Security Space Launch (Nssl) Phase 3 Lane 2 Launch ServicesU.S. Air Force · USAspending ↗
    $78.1MApr 30, 2025
  • Launch Services for National Reconnaissance Office Mission 69U.S. Air Force · USAspending ↗
    $77.8MMar 9, 2021
  • Phase 3 Lane 1 Launch Service Task Order (Lsto) for SDA-3U.S. Air Force · USAspending ↗
    $77.1MDec 8, 2025
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $74.4MAug 17, 2022
  • $68.4MAug 31, 2023
  • Merlin Engine Testing Clin 003.NASA · USAspending ↗
    $60.0MAug 14, 2019
  • LINK-182 Design and DemonstrationU.S. Air Force · USAspending ↗
    $57.3MApr 14, 2026
  • See Attachment 1, Performance Work Statement (Pws)U.S. Air Force · USAspending ↗
    $51.5MApr 14, 2025
  • On-orbit Large-scale Cryogenic Propellant Management and Transfer DemonstrationNASA · USAspending ↗
    $48.9MMay 3, 2021
  • The Government Is Unilaterally Ordering Special Studies Services in Accordance with the Following Contract Clauses for the Augmented Parachute Study: (1) B. 5 Special Studies (IDIQ) (Clin 003) (2) H.7 Special Studies Task Ordering Procedures (Applicable to Clin 003 Only), and (3) I.7 Far 52-216-19 Order Limitations (Oct 1995) (Applicable to Clins 002 and 003 of the Contract). Period of Performance of This Task Order Is: 1 Year After Completion of the Spacex Parachute System Qualification Program. Performance of This Task Order Is in Accordance with the Terms&conditions of the Base Contract NNK14MA74C. the Contractor Shall Conduct A Augmented Parachute Testing Study for NASA to Collect Reliability Data on the Contractor's Parachute Deployment System in Addition to the Contract Requirements and Additional System-level Testing in Accordance with the Attached Statement of Work. Task Order Value and Funding: Total Fixed Priced IDIQ Task Order Value Is $34,066,143. Clin 001 Total Is $25,364,064 Clin 002 (1 Capsule Build) Total Is $5,309,195 Clin 003 (1 Ptv Build) $3,392,884 Task Order Invoices: Invoices Submitted Against Task Orders Shall Describe the Name of the Study and the Associated Clin (Clin 003) and Shall Reference the Task Order Number. Authority to Proceed: Award of This Task Order Represents the Authority to Proceed (Atp) for Clin 001 Only. Clin 002 and Clin 003 NASA May Grant Atp at A Future Date and Within the Statement of Work. at Nasas Discretion IT May Cancel Tests 4TH, 5TH, And/or 6TH. Reference the Discounted Final Milestone Payments in the Statement of Work. in Consideration of the Modification Agreed to Herein As Complete Equitable Adjustment for Changes Described Above, the Contractor Hereby Releases the Government From Any and All Liability Under This Contract for Further Equitable Adjustments Attributable to Such Facts or Circumstances Giving Rise to the Proposed Adjustment.NASA · USAspending ↗
    $46.4MNov 30, 2017
  • To Acquire Starshield Service Plans, Service Management Portal/software, Field Service Representative Support, and 24/7/365 Customer Care. This Also Includes Terrestrial/other Third-party Connectivity to Facilitate End-to-end Service Offering.U.S. Air Force · USAspending ↗
    $44.7MApr 14, 2025
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $41.9MAug 17, 2021
  • Proliferated Low Earth Orbit Best Effort 05 ProgramU.S. Air Force · USAspending ↗
    $39.1MJun 17, 2026
  • Award Fee Incentive for Period 4U.S. Air Force · USAspending ↗
    $36.6MNov 13, 2024
  • IGF::OT::IGF Vertical Integration Capability (Vic) Design StudyU.S. Air Force · USAspending ↗
    $35.0MNov 9, 2017
  • Venture-class Acquisition of Dedicated and Rideshare (Vadr) Umbrella Task Order.NASA · USAspending ↗
    $33.1MMar 29, 2023
  • This Requirement Is to Fulfill the Ssc/cmsc Navair Pleo Needs.U.S. Air Force · USAspending ↗
    $29.2MDec 18, 2025
  • Aero User Terminal - Tile Antenna & ServiceDefense Information Systems Agency · USAspending ↗
    $29.2MMay 1, 2025
  • Multipurpose Thermal Protection Systems for HypersonicsU.S. Air Force · USAspending ↗
    $25.5MDec 18, 2020
  • $24.5MMay 14, 2024
  • Non-national Security Space Fleet SurveillanceU.S. Air Force · USAspending ↗
    $22.7MNov 6, 2020
  • Phase 3 Lane 2 Award FeeU.S. Air Force · USAspending ↗
    $19.4MJun 29, 2026
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $18.2MOct 31, 2022
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $18.2MOct 18, 2023
  • Freesol Baa Starshield Block 2U.S. Air Force · USAspending ↗
    $17.4MAug 5, 2024
  • National Security Space Launch Phase 2 Launch ServicesU.S. Air Force · USAspending ↗
    $17.4MOct 27, 2021
  • Operational Packaged Pleo ServiceDefense Information Systems Agency · USAspending ↗
    $16.8MNov 27, 2024
  • Satellite Processing Facility That Can Accommodate Up to 21 Satellites and Dispenser Stack, Post Transport Functional Testing As Required, and Mechanical and Electrical Mates to the Dispenser Hardware.U.S. Air Force · USAspending ↗
    $16.7MDec 11, 2024
  • Inconel Tank Feasibility Study and Sox Ignition Testing. This Effort Supports Possible Mitigation Activity to An Open Risk (CCP-SPCX-2015-17) Regarding the Copv Design (Cpov V2.0 for Use in the 1ST and 2ND Stage Lox Tanks) and Manufacturing Processes. the Risk Also Considers A Possibility That There May Be An Ignition Source Due to Material, Mechanical Forces, Friction or Buckling. Tasks Include Manufacturing R&D and Maturation of Cost and Scope for Inconel Development, Fabrication, Qualification, and Integration Into Flight Vehicles. This Includes Developing A New Manufacturing Process (Spin Forming) for Inconel Tanks. the Additional Work Shall Be Implemented to Fit Into Currently Planned Development Efforts, Thus Without Incurring Schedule Delays for This Effort. the Request Is for Best Effort to Implement on DEMO-1. If This Is Impractical, Provide Rationale and Cost/schedule for Later Implementation. the Proposal Should Describe the Assumptions, Amount and Description of Work and Resources Spacex Will Require to Comply with the Revised Requirements with Enough Supporting Pricing Information and Detail to Demonstrate Complete Understanding of These Changes and Reasonableness of the Proposed Prices. These Changes Shall Include Engineering and Manufacturing Efforts with Associated Analysis If Required. the Supporting Pricing Information Is to Include A Price Estimate to Implement the Changes and Sufficient Supporting Information Such As Basis of Estimates, Projections, Rough Order of Magnitude Information, Etc. Include An Estimate for Any Proposed Subcontractor Costs and Confirm, Based on These Estimates, If A Certification Is Applicable in Accordance with Contract Clause 1.4, 52.215-21. the Proposal Is to Include A Milestone Payment Schedule with Payment Amounts That Are Commensurate to the Work Completed. Provide Supporting Information to Show That the Milestones Are Phased Consistent to the Work Completed. the Price Proposal Shall Be Valid for A Minimum of 120 Days From the Date Submitted. 1.3. Spacex Shall Submit A Proposal at the Rom Level for Full Transition to Inconel Tanks for Crewed Vehicles to Include Breakout for Qualification, Manufacturing, and Integration Phases for Implementation of Inconel Tanks on Crew Vehicles. Closeout Information in Sap Attachments List.NASA · USAspending ↗
    $10.1MDec 15, 2017
  • This Hls Effort Further Develops Sustaining Lunar Lander Concept Development Through Design, Trade Studies and Joint Working Groups and Perform Risk Mitigation Activities to Reduce Sustainable Lunar Lander Development Risks.NASA · USAspending ↗
    $9.7MSep 27, 2021
  • IGF::OT::IGF Cpc Will Begin Certification Efforts Under Phase 1 by Contracting with Multiple Industry Providers for the Purchase of Early Lifecycle Certification Data Products Related to An End-to-end Crew Transportation System (Cts) for An International Space Station (Iss) Design Reference Mission (Drm). Contract Deliverables Include Alternate Standards, Hazard Reports, Verification and Validation Plan, and Certification Plan. Phase 1 Contract Scope Will Include Technical Interchange Between NASA and the Contractor on How Deliverables Meet NASA Certification Requirements. Phase 2 Will Build on the Results of Phase 1 and Continues the Certification Activity with Focus on the Major Certification Acceptance Activities Resulting in NASA Certification. Phase 2 Will Also Include at Least One Crewed Iss Demonstration Mission and May Include Additional Crewed Missions to Iss. the Award Criteria for Phase 2 Will Include Demonstrated Completion of Previous Specified Phase 1 Requirements. the Government Expects That Only Phase 1 Contractors Will Be Capable of Successfully Competing for Phase 2. Proposals for Phase 2 Will Be Requested From These Contractors. Phase 2 Will Be Solicited Under A Separate Rfp to Be Released During the Performance of the Awarded Phase 1 Contracts and Will Build on the Results From Phase 1. Phase 2 Will Be Synopsized in Accordance with Far 5.201 and 5.203. the Contractor Shall Deliver Two Versions of Each Clin Deliverable: Initial and Final. Each Deliverable Shall Be Consistent with the Design Maturity of the Contractor's Cts at the Time of Delivery and Include Nomenclature to Identify the Design Maturity Associated with the Contents in the Deliverable. Each Deliverable Shall Address the Relevant Requirements in the Applicable Documents Listed in Section C.6. Each Deliverable Shall Identify Relevant Non-compliance with CCT-REQ-1130 and Ssp 50808 Requirements. Final Deliverables Must Address Consistency Requirements As Described in Section H, Consistency of Final Data Deliverables. with the Exception of Clin 2, Hazard Reports, Contractor Preferred Formats and Documentation May Be Used to Meet the Data Requirements If Traceability From the Contractor Document(s) to the Deliverable Requirements Is Provided. Contractor Preferred Configuration Management of Deliverables Can Be Used As Long As the Deliverables Are Marked with the Contract Number, Version, and Clin Number. Deliverables Shall Be Readable, Printable, and Downloadable by NASA Utilizing Publicly Available Off-the-shelf Software.NASA · USAspending ↗
    $9.6MDec 6, 2012
  • Thermal Protection Systems for HypersonicsU.S. Air Force · USAspending ↗
    $8.8MSep 27, 2024
  • Starlink Kits and ServiceU.S. Department of State · USAspending ↗
    $8.2MSep 2, 2025