Skip to content
DefDex

Aircraft · Air

AH-64 Apache

Attack helicopter family whose current production variant is the AH-64E.

by Boeing

FieldedAircraftAirFirst delivery1984
boeing.com/defense/military-rotorcraft/ah-64-apache
Two U.S. Army AH-64 Apache helicopters taking off in Iraq

Photo: U.S. Army photo by Sgt. Tierney P. Nowland · Public domain (PD-USGov-Military-Army) · Resized and reencoded as WebP; no additional crop. AH-64-family photograph; the cost profile specifically covers AH-64E.

Timeline3

  1. MilestoneConfirmed

    Earliest documented public appearance: published YAH-64 designation

    Earliest supported public appearance found in the sources reviewed for this research; not a claim of the first-ever announcement or original unveiling. Earlier evidence may revise this date. Army Aviation’s August 1973 issue lists the Hughes YAH-64 among recently announced DOD designations. The date refers to the publication, not the undated earlier DOD announcement.

  2. First flightConfirmed

    YAH-64 prototype first flight

  3. First deliveryConfirmed

    First Apache delivery

The latest 10 milestones. Solid entries are confirmed, outlined reported, dashed estimated or still to come; dotted italic entries are speculative. Dates show only the precision the sources give.

Operators1

  • USUnited States

Cost to the Government

Helicopters · Boeing

AH-64E Apache Guardian

Compare platform costs →

Attack helicopter acquired through both new production and remanufacture of existing Apaches, with materially different unit costs.

Remanufacture average procurement / aircraft

$20.445M

2019-12 SAR · Then-year USD

Converts existing aircraft; excludes the cost of originally acquiring the donor airframe.

Department of Defense ↗

Remanufactured production aircraft delivered

317

2019-12 SAR · U.S. only

Historical remanufacture deliveries only; excludes new-build and development aircraft.

Department of Defense ↗

Remanufacture procurement quantity

626

2019-12 SAR · U.S. only

Excludes five development aircraft and the separate new-build program.

Department of Defense ↗

Remanufacture program R&D total

$1.538B

2019-12 SAR · Then-year USD

PB2021 funding total; shared development is not zero simply because the new-build SAR carries no R&D.

Department of Defense ↗

Cost & funding breakdown

New-build average procurement / aircraft

$31.3M

2019-12 SAR · Then-year USD

Separate 79-aircraft production program; do not compare directly with donor-airframe remanufacture.

Department of Defense ↗

New-build procurement program

79

2019-12 SAR · U.S. only

Separate from remanufacture quantities.

Department of Defense ↗

New build versus remanufacture

Remanufacturing reuses an existing airframe, while new production buys a new aircraft. Both deliver an E-model capability, but their unit figures describe different government inputs and cannot be ranked as identical purchases.

Operations & sustainment

Reimbursement / flight hour

$6,481 / hr

FY2026 · Nominal USD; Other DoD Component

Published billing rate for use by another DoD component. It is not the fully burdened cost of ownership.

DoD Comptroller ↗
Cost over time · 5 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

AH-64E Apache Guardian cost history
ObservationMeasureAmountDollar basisEvidence
2010-12 baselineRemanufacture average procurement / aircraft

Historical program baseline.

$16.139MThen-year USDDepartment of Defense ↗
2018-12 SARRemanufacture average procurement / aircraft

Prior annual estimate.

$20.403MThen-year USDDepartment of Defense ↗
2019-12 SARRemanufacture average procurement / aircraft

Converts existing aircraft; excludes the cost of originally acquiring the donor airframe.

$20.445MThen-year USDDepartment of Defense ↗
FY2025Reimbursement / flight hour

Published billing rate for use by another DoD component. It is not the fully burdened cost of ownership.

$5,494 / hrNominal USD; Other DoD ComponentDoD Comptroller ↗
FY2026Reimbursement / flight hour

Published billing rate for use by another DoD component. It is not the fully burdened cost of ownership.

$6,481 / hrNominal USD; Other DoD ComponentDoD Comptroller ↗
Contracts & purchasing · 1 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2023-03-17 · Award; quantity includes options

    U.S. Army and international customers → Boeing

    $1.9B · 184 units in scope

    115 U.S. remanufactures, 15 U.S. options and 54 foreign aircraft. Award increased funded contract value to $2.1B; potential future value exceeds $3.8B. These values are not additive.

    Boeing ↗

International buyers

  • Australia · Quantity not verified · Included in multinational award · 2023-03-17

    Boeing identifies Australia among recipients but does not allocate the 54 foreign aircraft by country in this release.

    Boeing ↗
Coverage & open research
  • Figures retain the date and scope of the original source. A historical count, cumulative delivery or procurement plan is not today’s mission-capable inventory.

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.