  1. UnveiledReported

    F-15EX named in Air Force FY2020 budget request

    The F-15EX designation first appeared publicly in the Air Force's FY2020 budget request, briefed to reporters on March 12, 2019, which sought eight F-15EX aircraft. Earlier coverage used the informal, unconfirmed label F-15X for Boeing's pitch.

  2. Contract awardConfirmed

    Air Force awards first F-15EX production lot

    The nearly $1.2 billion Boeing contract covered the first eight F-15EX aircraft and associated development and support work.

  3. First flightConfirmed

    First F-15EX flight

  4. First deliveryConfirmed

    U.S. Air Force accepts first F-15EX

  5. MilestoneConfirmed

    F-15EX fires its first live missile

    A 40th Flight Test Squadron F-15EX fired an AIM-120D during Combat Archer. This was a weapons trial, not combat use or the first ground test of the aircraft.

  6. MilestoneConfirmed

    First F-15EX reaches an operational unit in Oregon

    The 142nd Wing received its first F-15EX at Portland Air National Guard Base. Earlier aircraft had been delivered for testing; this milestone does not assert a separate IOC declaration.

  7. MilestoneConfirmed

    GAO assessment: F-15EX production and delivery risks

    GAO’s June 2025 assessment reports full-rate production in June 2024 and initial operational capability in July 2024. The September 2024 cost estimate covered 98 aircraft (96 procurement and two development). GAO identified production-rate, parts-supply and cybersecurity risks. These are historical findings, not a current fleet count.

  8. MilestoneConfirmed

    F-15EX test aircraft deploy to Kadena for training

    Two 85th Test and Evaluation Squadron aircraft arrived for integration and familiarization training. This temporary visit is distinct from permanent basing plans.

The latest 10 milestones. Solid entries are confirmed, outlined reported, dashed estimated or still to come; dotted italic entries are speculative. Dates show only the precision the sources give.

Cost to the Government

Aircraft · Boeing

F-15EX Eagle II

Compare platform costs →

Current-production fighter with budget exhibits that separately identify recurring aircraft cost, weapon-system cost and future procurement quantities.

FY2027 flyaway unit estimate

$101.495M

FY2027 budget request · Then-year USD

P-40 F-15EX exhibit; request for 24 aircraft. Excludes separately identified support costs.

U.S. Air Force ↗

Cumulative deliveries reported

16

Late 2025; reported 2026-01 · U.S. only

Report describes delivery through EX16; not a 2026 mission-capable fleet count.

U.S. Air Force ↗

Planned acquisition program

268

FY2027 budget request · U.S. only

Budget narrative includes 8 Lot 1 aircraft and 21 mandatory-funded aircraft outside the 239-aircraft table total. Procurement plans are not inventory.

U.S. Air Force ↗

R&D program total

Not verified

A separately identified lifetime development total has not been verified. This is not a zero-cost estimate.

Cost & funding breakdown

FY2027 gross weapon-system unit cost

$110.697M

FY2027 request · Then-year USD

Includes support identified in the P-40 exhibit.

U.S. Air Force ↗

FY2027 procurement request

$2.657B

FY2027 request · Then-year USD

Total request for 24 aircraft; not an awarded contract.

U.S. Air Force ↗

FY2027 requested aircraft

24

FY2027 request · U.S. only

Budget request, not deliveries.

U.S. Air Force ↗

Why the first award is not the recurring unit price

The initial award bundled development and support with eight aircraft. The later budget’s flyaway line is a narrower production measure; gross weapon-system cost adds the support identified in that exhibit.

Operations & sustainment

Reimbursement / flight hour

$17,321 / hr

FY2026 · Nominal USD; Other DoD Component

Published billing rate for use by another DoD component. It is not the fully burdened cost of ownership.

DoD Comptroller ↗
Cost over time · 3 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

F-15EX Eagle II cost history
ObservationMeasureAmountDollar basisEvidence
FY2025Flyaway unit cost

Same P-40 series; fiscal-year lot mix changes.

$103.029MThen-year USDU.S. Air Force ↗
FY2026Flyaway unit cost

Discretionary one-aircraft line in the P-40 exhibit. Twenty-one mandatory-funded aircraft are outside this unit average.

$115MThen-year USDU.S. Air Force ↗
FY2027 budget requestFY2027 flyaway unit estimate

P-40 F-15EX exhibit; request for 24 aircraft. Excludes separately identified support costs.

$101.495MThen-year USDU.S. Air Force ↗
Contracts & purchasing · 1 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2020-07-13 · Initial lot; approximately

    U.S. Air Force → Boeing

    $1.2B · 8 units in scope

    Includes development, integration, testing, support and eight aircraft; division by eight would not produce a recurring flyaway price.

    U.S. Air Force ↗

International buyers

No international purchase documented in this review.

Coverage & open research
  • Figures retain the date and scope of the original source. A historical count, cumulative delivery or procurement plan is not today’s mission-capable inventory.
  • A separately identified lifetime development total has not been verified. This is not a zero-cost estimate.
  • Total acquisition costEstimated
    $12.29B
    Estimate / observation: 2024-09 · BY2025 $ · 98 units

    GAO-25-107569 printed p. 72 (PDF p. 82); estimate dated 2024-09, expressed in constant FY2025 dollars. Visually transcribed from the program performance graphic, whose amounts are in millions. Historical estimate, not a current price or contract award. Total covers development and procurement quantities.

    Source
  • Unit cost (PAUC)Estimated
    $125M
    Estimate / observation: 2024-09 · BY2025 $

    GAO-25-107569 printed p. 72 (PDF p. 82); estimate dated 2024-09, expressed in constant FY2025 dollars. Visually transcribed from the program performance graphic, whose amounts are in millions. Historical estimate, not a current price or contract award. Program acquisition unit cost (PAUC); GAO methodology p. 197 divides program cost by total quantities. Report-rounded value, not flyaway or procurement unit price.

    Source
  • Unit cost (flyaway)Reported
    $90.0M
    Estimate / observation: 2023-09-28 · Then-year $ · 12 units

    Air Force spokesperson via Breaking Defense: flyaway price in the Lots 2-4 contract finalized Sept. 28, 2023 is approximately $90M per aircraft for Lot 2 (12 jets), rising to $97M for Lot 3 (12 jets) and $94M for Lot 4 (24 jets); cumulative value of the three lots $3.9B for 48 aircraft. Flyaway includes airframe, EPAWSS, engines, radars and other subsystems plus production NRE, SE/PM and ECOs; then-year dollars. Lots 3/4 prices kept in notes only (same natural key).

    Source
  • Unit cost (APUC)Reported
    $94.0M
    Estimate / observation: 2022-12 · Then-year $ · 104 units

    Average procurement unit cost from the F-15EX annual Selected Acquisition Report (based largely on CY2022 data, updated for the FY2024 plan of 104 aircraft), as reported by Air & Space Forces Magazine; includes EPAWSS; then-year dollars. Previous APUC with the smaller buy was $114.2M.

    Source
  • Contract unit priceReported
    $108M
    Estimate / observation: 2026-09-29 · Then-year $ · 22 units

    Lot 7 contract awarded Sept. 29, 2026: $2.38B for 22 F-15EX; average $108M per aircraft as computed by Air & Space Forces Magazine. Excludes GE F110 engines (bought separately as GFE). Funded from FY2026 budget and 2025 reconciliation.

    Source
Earlier cost observations (3)
  • F-15EX Eagle II · Total acquisition cost · $12.47B
    Estimate / observation: 2022-12 · Then-year $ · 104 units

    Then-year program acquisition cost (development, procurement, MILCON) from the same SAR (104-aircraft program), as reported by Air & Space Forces Magazine.

    Source
  • F-15EX Eagle II · Unit cost (flyaway) · $80.5M
    Estimate / observation: 2022-11 · Then-year $ · 6 units

    Lot 1 definitized November 2022: flyaway price $80.5M per jet for six jets (two test aircraft bought earlier). Then-year dollars per Air Force practice.

    Source
  • F-15EX Eagle II · Unit cost (flyaway) · $87.7M
    Estimate / observation: 2020-07

    Per-unit flyaway cost in the July 2020 initial F-15EX contract as reported by Air Force Magazine, including engines; cited by Forbes. Boeing had claimed Block 1 flyaway under $80M.

    Source
Budget by fiscal year
Fiscal yearAppropriationRequestEnactedQtyBudget lineSource
FY2027RDT&E$133M———SourceConfirmed
FY2027Procurement$2.96B—24—SourceConfirmed
FY2027Total$3.10B—24—SourceConfirmed
FY2026RDT&E$80.4M$158M——SourceConfirmed
FY2026Procurement$3.02B$3.17B22—SourceConfirmed
FY2026Total$3.10B$3.33B22—SourceConfirmed
FY2025RDT&E—$56.2M——SourceConfirmed
FY2025Procurement—$1.85B18—SourceConfirmed
FY2025Total—$1.90B18—SourceConfirmed

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.