Skip to content
DefDex

Uncrewed aircraft · Air

MQ-25 Stingray

Carrier-based uncrewed aircraft designed for refueling and intelligence, surveillance and reconnaissance. GAO’s 2025 assessment covers its aircraft and related control station segments.

Unveiled Dec 19, 2017

Uncrewed aircraftAirContract awardSep 14, 2026
An MQ-25 test aircraft on the flight deck of USS George H.W. Bush at sunset.

Photo: U.S. Navy photo by Mass Communication Specialist 3rd Class Hillary Becke · Public domain (PD-USGov-Military-Navy) · Shows the MQ-25 test aircraft during carrier deck handling trials, not a production delivery.

Carrier-based uncrewed aircraft designed for refueling and intelligence, surveillance and reconnaissance. GAO’s 2025 assessment covers its aircraft and related control station segments.

Timeline4

  1. UnveiledConfirmed

    Boeing publicly reveals MQ-25 competition aircraft

  2. MilestoneConfirmed

    MQ-25A first flight from MidAmerica Airport

    The Navy announced this as the MQ-25A's first flight, from Boeing's facility at MidAmerica Airport in Mascoutah, Illinois.

  3. MilestoneConfirmed

    Milestone C approval for low-rate initial production

    The acting Navy secretary announced Milestone C approval, moving the program into production and deployment.

  4. Contract awardConfirmed

    First low-rate initial production contract (Lot 1)

    A $562 million fixed-price incentive contract to Boeing for three Lot 1 aircraft plus long-lead parts for Lot 2. First deliveries are expected in 2029.

The latest 10 milestones. Solid entries are confirmed, outlined reported, dashed estimated or still to come; dotted italic entries are speculative. Dates show only the precision the sources give.

Programs & Awards1 programs

Programs1

Cost to the Government

Aircraft · Boeing

MQ-25A Stingray

Compare platform costs →

Aircraft procurement, carrier mission-control systems and development contracts have distinct cost scopes.

Aircraft procurement budget / MQ-25

$184.333M

FY2025 request · PB2025 · Nominal USD; budget-year program scope

PB2025 $553M / three aircraft; includes advance procurement, not flyaway-only price. Separate UMCS funding excluded.

DoD Comptroller ↗

U.S. inventory

Not verified

A current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.

Historical LRIP request

3

FY2025 request · PB2025 · U.S. only; stated source scope

PB2025 plan, not confirmed operational fleet size.

DoD Comptroller ↗

Program-specific annual RDT&E

$214.9M / yr

FY2025 · PB2025 historical budget snapshot · Nominal USD; source budget basis

Annual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.

DoD Comptroller ↗

Cost & funding breakdown

UMCS procurement request

$130.1M

FY2025 request · PB2025 · Nominal USD; source budget basis

Mission-control and shipboard integration funding is separate from the aircraft line.

DoD Comptroller ↗

Historical milestones are not current fielding evidence

The 2018 award and PB2025 budget contain different planned IOC dates. Neither is used to assert that the aircraft is operational today.

Operations & sustainment

Annual operations & support

Not verified

A complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.

Cost over time · 6 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

MQ-25A Stingray cost history
ObservationMeasureAmountDollar basisEvidence
FY2023 · PB2025 historical budget snapshotMQ-25 aircraft annual procurement

Annual program funding in the cited budget vintage; not a unit price, contract award, or actual delivery count.

$748.2MNominal USD; source budget basisDoD Comptroller ↗
FY2024 · PB2025 historical budget snapshotMQ-25 aircraft annual procurement

Annual program funding in the cited budget vintage; not a unit price, contract award, or actual delivery count.

$596.3MNominal USD; source budget basisDoD Comptroller ↗
FY2025 · PB2025 historical budget snapshotMQ-25 aircraft annual procurement

Annual program funding in the cited budget vintage; not a unit price, contract award, or actual delivery count.

$553MNominal USD; source budget basisDoD Comptroller ↗
FY2023 · PB2025 historical budget snapshotProgram-specific annual RDT&E

Annual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.

$250.9M / yrNominal USD; source budget basisDoD Comptroller ↗
FY2024 · PB2025 historical budget snapshotProgram-specific annual RDT&E

Annual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.

$220.4M / yrNominal USD; source budget basisDoD Comptroller ↗
FY2025 · PB2025 historical budget snapshotProgram-specific annual RDT&E

Annual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.

$214.9M / yrNominal USD; source budget basisDoD Comptroller ↗
Contracts & purchasing · 1 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2018-08-30 · EMD award · ceiling

    U.S. Navy → Boeing

    $805.3M · 4 units in scope

    Development, fabrication, test and support of four engineering aircraft; not four recurring production airframes.

    NAVAIR ↗

International buyers

  • United States · 3 · U.S. procurement customer · Dated source snapshot

    Budget request, not evidence of deliveries or a current fleet inventory.

    DoD Comptroller ↗
Coverage & open research
  • Buyer records are selected examples, not a complete global order book.
  • Current U.S. inventory requires additional public evidence; procurement quantities are not inventory.
  • Complete system-specific annual operating and support costs were not established.

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.