The MQ-25 Stingray is a catapult-launched, carrier-based uncrewed aircraft designed to refuel the Navy's carrier air wing and provide intelligence, surveillance and reconnaissance on surface targets. The system includes an aircraft, control stations and carrier modifications. GAO's June 2025 assessment examined the aircraft and control-station segments and identified cost, schedule and component-obsolescence challenges during development.

News8

Timeline4

  1. UnveiledConfirmed

    Boeing publicly reveals MQ-25 competition aircraft

    SourcesBoeing

  2. MilestoneConfirmed

    MQ-25A first flight from MidAmerica Airport

    The Navy announced this as the MQ-25A's first flight, from Boeing's facility at MidAmerica Airport in Mascoutah, Illinois.

    SourcesU.S. Navy

  3. MilestoneConfirmed

    Milestone C approval for low-rate initial production

    The acting Navy secretary announced Milestone C approval, moving the program into production and deployment.

    SourcesU.S. Navy

  4. Contract awardConfirmed

    First low-rate initial production contract (Lot 1)

    A $562 million fixed-price incentive contract to Boeing for three Lot 1 aircraft plus long-lead parts for Lot 2. First deliveries are expected in 2029.

    SourcesU.S. Navy

Program and variant milestones. Dates show only the precision the sources give.

Cost to the GovernmentFY2025 request $502M

Totals · 2

  • Program-specific annual RDT&EAnnual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.
    FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2025 · PB2025 historical budget snapshot
    $214.9M / yrNominal $; source budget basis
  • UMCS procurement requestMission-control and shipboard integration funding is separate from the aircraft line.
    FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2025 request · PB2025
    $130.1MNominal $; source budget basis

Unit costs · 1

  • Aircraft procurement budget / MQ-25PB2025 $553M / three aircraft; includes advance procurement, not flyaway-only price. Separate UMCS funding excluded.
    FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2025 request · PB2025
    $184.333MNominal $; budget-year program scope

Quantities · 2

  • Historical LRIP requestPB2025 plan, not confirmed operational fleet size.
    FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2025 request · PB2025
    3U.S. only; stated source scope
  • U.S. inventoryA current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.
    Source not recorded
    Not established

Operating costs · 1

  • Annual operations & supportA complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.
    Source not recorded
    Not established
Earlier observations · 6

Superseded estimates and prices, each in its original scope and dollar basis.

1Annual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.

2Annual program funding in the cited budget vintage; not a unit price, contract award, or actual delivery count.

Budget by fiscal year
Fiscal yearScopeAppropriationRequestEnactedQtyBudget lineSource
FY2025Program: MQ-25 Stingray · United StatesProcurement$502MJun 11, 2025———RequestWeapon Systems Annual Assessment 2025 — MQ-25 Stingray, p. 138 U.S. Government Accountability Office · Jun 11, 2025

Historical milestones are not current fielding evidence

The 2018 award and PB2025 budget contain different planned IOC dates. Neither is used to assert that the aircraft is operational today.

Contracts & purchasing · 1

Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.

Contracts and purchasing
Buyer → sellerStatusStated amountQtySource
U.S. Navy → BoeingDevelopment, fabrication, test and support of four engineering aircraft; not four recurring production airframes.EMD award · ceiling$805.3M announced ceiling (not spending)4MQ-25A development contract, August 30, 2018 NAVAIR · figure Aug 30, 2018
International buyers · 1
International buyers
CountryQtyStatusSource
United StatesBudget request, not evidence of deliveries or a current fleet inventory.3U.S. procurement customerFY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure Dated source snapshot

Open research: Buyer records are selected examples, not a complete global order book. Current U.S. inventory requires additional public evidence; procurement quantities are not inventory. Complete system-specific annual operating and support costs were not established.

What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.

Contracts$254M obligated on code-mapped awards

  • Code-mapped awards are every contract award in the USAspending baseline (DoD, DHS, DOE and NASA, FY2008–FY2027) whose latest reported acquisition program code is this program's, whichever company received it; vehicles (IDVs) are excluded.

By fiscal year5

Obligations by federal fiscal year
Fiscal yearObligatedActions
FY2022$108M obligated6
FY2023$115M obligated8
FY2024$13.5M obligated14
FY2025$12.0M obligated25
FY2026$4.3M obligated4

Contractors1

  1. Boeing$250M obligated 99%
  2. Recipients without a DefDex profile (6 awards)$3.5M obligated 1.4%

Reported acquisition program code 462; program scope may be incomplete or miscoded · 11 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.

Participants10

Prime

1

Supplier

9

Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.

Where It Is Built2

Plants, shipyards, final-assembly lines, test sites and depots that build or sustain the program, and the work done at each.

Who Operates It1

Countries and services that operate or have bought the product. A quantity is the count a source states, labelled delivered, in service, ordered, planned or authorized with the year it is stated for; an ordered, planned or authorized count is not a delivery.

Company-reported Charges1

Losses and charges a company states in its annual report (Form 10-K) for this program, in the company's own words and at the amount it gives for that fiscal year. A company-reported charge is not obligated, enacted or requested money and not an announced ceiling; it is never added to the obligations above. Where a sentence gives more than one figure for the program in a year, only the first is listed and the note says so.

Budget Lines

  • 0207255N
  • APN P-1 line 17
  • APN P-1 line 18

Budget line items recorded for this program.