Program · United States · U.S. Navy
MQ-8 Fire Scout
MQ-8 Fire Scout · Fielded · U.S. Navy
Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Program totals · 1 | ||
| R&D program totalA lifetime program R&D total was not established. Development contracts and shared program budgets are not substituted for that total. | Not established | — |
| Unit costs · 1 | ||
| Comparable unit priceNo comparable standalone unit price was established; package or contract totals are shown separately. | Not established | — |
| Quantities · 2 | ||
| Historical MQ-8C procurement totalC variant only; program also bought 30 MQ-8Bs. Purchased quantity is not current operational inventory. | 38U.S. only; stated source scope | PB2024 Navy aircraft modification exhibits U.S. Navy · figure PB2024 narrative |
| U.S. inventoryA current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count. | Not established | — |
| Operating costs · 1 | ||
| Historical modeled annual O&S / MQ-8 aircraftCombined MQ-8B/C estimate; $2,644.1M / 465 operating-aircraft years. Not a C-only actual cost; some shared MH-60 detachment manpower excluded. | $5.681M / yrConstant FY2017 $; mixed B/C program | MQ-8 Fire Scout December 2019 Selected Acquisition Report U.S. Navy / DoD · figure December 2019 SAR |
Program totals · 1
- R&D program totalA lifetime program R&D total was not established. Development contracts and shared program budgets are not substituted for that total.Source not recordedNot established
Unit costs · 1
- Comparable unit priceNo comparable standalone unit price was established; package or contract totals are shown separately.Source not recordedNot established
Quantities · 2
- Historical MQ-8C procurement totalC variant only; program also bought 30 MQ-8Bs. Purchased quantity is not current operational inventory.PB2024 Navy aircraft modification exhibits U.S. Navy · figure PB2024 narrative38U.S. only; stated source scope
- U.S. inventoryA current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.Source not recordedNot established
Operating costs · 1
- Historical modeled annual O&S / MQ-8 aircraftCombined MQ-8B/C estimate; $2,644.1M / 465 operating-aircraft years. Not a C-only actual cost; some shared MH-60 detachment manpower excluded.MQ-8 Fire Scout December 2019 Selected Acquisition Report U.S. Navy / DoD · figure December 2019 SAR$5.681M / yrConstant FY2017 $; mixed B/C program
Earlier observations · 3
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| Fire Scout modification funding1 | $31.566MNominal $; dated budget snapshot | PB2024 Navy aircraft modification exhibits U.S. Navy · figure FY2022 |
| Fire Scout modification funding1 | $9.846MNominal $; dated budget snapshot | PB2024 Navy aircraft modification exhibits U.S. Navy · figure FY2023 |
| Fire Scout modification funding1 | $14.7MNominal $; dated budget snapshot | PB2024 Navy aircraft modification exhibits U.S. Navy · figure FY2024 request |
- Fire Scout modification funding1PB2024 Navy aircraft modification exhibits U.S. Navy · figure FY2022$31.566MNominal $; dated budget snapshot
- Fire Scout modification funding1PB2024 Navy aircraft modification exhibits U.S. Navy · figure FY2023$9.846MNominal $; dated budget snapshot
- Fire Scout modification funding1PB2024 Navy aircraft modification exhibits U.S. Navy · figure FY2024 request$14.7MNominal $; dated budget snapshot
1PB2024 budget vintage; modernization funding, not new air vehicles.
Later divestment plans supersede the old operational narrative
PB2026 describes full MQ-8C divestment and transfer of 36 remaining air vehicles, plus contract closeout and disposal support. A plan for disposal is not confirmation of the final disposition of every airframe.
Mixed-family development is not a C-only total
The historical Fire Scout SAR covers both MQ-8B and MQ-8C. This page does not label its family acquisition or R&D totals as exclusive to the C variant.
International buyers · 1
| Country | Qty | Status | Source |
|---|---|---|---|
| United StatesPurchases and program plans are not a current operational inventory. | Not verified | U.S. program customer | PB2026 Navy O&M: MQ-8C divestment U.S. Navy · figure Dated source snapshot |
Open research: Buyer records are selected examples, not a complete global order book. Current U.S. operational inventory was not established; dated purchases, deliveries and plans remain separate. A comparable complete-system unit purchase price was not established. A system-specific lifetime R&D total was not established.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
Contracts$334M obligated since FY2008
Contractors6
- Northrop Grumman$314M 94%
- Boeing$9.6M 2.9%
- Textron$5.3M 1.6%
- L3Harris Technologies$4.4M 1.3%
- GE Aerospace$716K 0.2%
- BAE Systems$10K 0.0%
Awards41
- Northrop Grumman Systems CorporationTHIS CONTRACT PROCURES REACH-BACK SUPPORT FOR THE DATABUS EFFORT.U.S. Navy · Delivery Order · Jan 17, 2024$1.2Mobligated · up to $1.2M ceiling
- Northrop Grumman Systems CorporationPROCUREMENT OF RUMGAU A-KITS AND ASSOCIATED NON RECURRING ENGINEERING (NRE).U.S. Navy · Delivery Order · Sep 11, 2023$378Kobligated · up to $378K ceiling
- Northrop Grumman Systems CorporationNON-RECURRING ENGINEERINGU.S. Navy · Delivery Order · Jul 25, 2023$8.7Mobligated · up to $8.7M ceiling
- Northrop Grumman Systems CorporationFOLLOW-ON MQ-8 SOFTWARE SUSTAINMENT CONTRACT FOR CY23-CY25U.S. Navy · Definitive Contract · Dec 22, 2022$28.4Mobligated · up to $70.1M ceiling
- Northrop Grumman Systems CorporationSOFTWARE/FIRMWARE UPGRADE VMCU.S. Navy · Delivery Order · Dec 15, 2022$431Kobligated · up to $431K ceiling
- Northrop Grumman Systems CorporationPLER MQ-8C NETWORK PHASE 1 UPGRADE - NREU.S. Navy · Delivery Order · Sep 29, 2022$3.3Mobligated · up to $3.3M ceiling
- BAE Systems Information and Electronic Systems Integration Inc.REPAIR OF COUNTERMEASURE CONTROLU.S. Navy · Purchase Order · Nov 2, 2021$10Kobligated · up to $30K ceiling
- Northrop Grumman Systems CorporationMQ8C FAULT TREE ANALYSISU.S. Navy · Delivery Order · Aug 6, 2021$5.0Mobligated · up to $5.9M ceiling
- Northrop Grumman Systems CorporationRADAR A-KIT INSTALLATIONS AND TEACHES.U.S. Navy · Delivery Order · Jun 30, 2021$3.6Mobligated · up to $7.2M ceiling
- Northrop Grumman Systems CorporationNON-RECURRING ENGINEERING (NRE)U.S. Navy · Delivery Order · Dec 9, 2020$5.8Mobligated · up to $5.8M ceiling
- Boeing Distribution Inc.MQ-8C ENGINE AND SPARE COMPONENTSU.S. Navy · Delivery Order · Sep 29, 2020$9.6Mobligated · up to $9.6M ceiling
- Northrop Grumman Systems CorporationMQ-8C AN/ZPY-8 RADAR SPARE COMPONENTS AND TCDL ANTENNA RADOME UPGRADE UNITSU.S. Navy · Delivery Order · Sep 24, 2020$6.2Mobligated · up to $9.5M ceiling
- TextronNON-RECURRING ENGINEERING (NRE)TO DESIGN AND DELIVER A CABIN DOOR PROTOTYPE ON THE MQ-8CU.S. Navy · Delivery Order · Sep 23, 2020$3.2Mobligated · up to $3.7M ceiling
- Northrop Grumman Systems CorporationNRE, KITS, INSTALLATION, AND INTEGRATION OF RUMGAU UPGRADES.U.S. Navy · Delivery Order · Sep 8, 2020$12.1Mobligated · up to $12.1M ceiling
- L3Harris TechnologiesVORTEX&SRQ-4 SYSTEM(S) FOR FIRESCOUT. SPARES AND REPAIR WORK FOR 15 OTHER VORTEX SYSTEMS.U.S. Navy · Delivery Order · Aug 11, 2020$4.4Mobligated · up to $4.4M ceiling
- TextronCOOLER,OILDefense Logistics Agency · Delivery Order · Apr 27, 2020$169Kobligated · up to $169K ceiling
- TextronARINC ANALOG CONVERDefense Logistics Agency · Delivery Order · Apr 15, 2020$168Kobligated · up to $168K ceiling
- TextronARINC ANALOG CONVERDefense Logistics Agency · Delivery Order · Apr 9, 2020$545Kobligated · up to $545K ceiling
- TextronPROBE,FUEL QTY (FWDDefense Logistics Agency · Delivery Order · Mar 12, 2020$81Kobligated · up to $81K ceiling
- Northrop Grumman Systems CorporationWEAPONS INTEGRATION STUDYU.S. Navy · Delivery Order · Feb 11, 2020$2.4Mobligated · up to $2.6M ceiling
- Northrop Grumman Systems CorporationCY20-CY22 SUSTAINMENT CONTRACTU.S. Navy · Definitive Contract · Dec 20, 2019$69.3Mobligated · up to $78.6M ceiling
- Northrop Grumman Systems CorporationPRODUCE EIGHT (8) AN/ZPY-8 RADAR MODIFICATION KITS AND EIGHT (8) FORWARD ACCESS PANEL MODIFICATION KITS WITH ALL ASSOCIATED NON-RECURRING ENGINEERING TO QUALIFY A NEW MISSION PROCESSOR UNIT (MPU) FOR DELIVERY WITH THE MODIFICATION KITS.U.S. Navy · Delivery Order · Dec 9, 2019$11.7Mobligated · up to $12.6M ceiling
- TextronSHAFT ASSY, FREEWHEDefense Logistics Agency · Delivery Order · Nov 7, 2019$408Kobligated · up to $408K ceiling
- TextronSTRUCTURAL ANALYSISU.S. Navy · Delivery Order · Jul 22, 2019$56Kobligated · up to $56K ceiling
- Northrop Grumman Systems CorporationUPPER PULLEY ASSEMBDefense Logistics Agency · Delivery Order · Jun 13, 2019$334Kobligated · up to $334K ceiling
- Northrop Grumman Systems CorporationIGF::OT:IGF THE PURPOSE OF THIS MODIFICATION IS TO PROCURE THE N23, N24,&N07 PIECE PART KITS.U.S. Navy · Delivery Order · Sep 26, 2018$1.7Mobligated · up to $1.7M ceiling
- Northrop Grumman Systems CorporationIGF::CL:IGF DEMONSTRATE LINK-16 IN-FLIGHT TARGET UPDATE (IFTU) CAPABILITY USING THE MQ-8C FIRE SCOUT UNMANNED AIRCRAFT SYSTEM (UAS)U.S. Navy · Delivery Order · Dec 21, 2017$1.0Mobligated · up to $1.4M ceiling
- Northrop Grumman Systems CorporationIGF::CL::IGF THE PURPOSE OF THIS ORDER IS FOR THE PROCUREMENT OF THE BELL 407 GXP INTEGRATED LOGISTICS SUPPORT (ILS) SUPPORTING THE MQ-8C.U.S. Navy · Delivery Order · Dec 12, 2017$384Kobligated · up to $384K ceiling
- GE AerospacePROCUREMENT AND DELIVERY OF SEVENTEEN (17) RES-210 ETHERNET SWITCHES IAW PID# N00019-17-NORFP-PMA-266-0083.U.S. Navy · Definitive Contract · May 5, 2017$234Kobligated · up to $234K ceiling
- Northrop Grumman Systems CorporationIGF:OT:IGF LN-251 LITTON NAVIGATOR INTEGRATION NRE, PROTOTYPE KITS, GROUND TEST ENGINEERING SUPPORT, AND ASSOCIATED TECHNICAL DATA.U.S. Navy · Delivery Order · May 2, 2017$3.9Mobligated · up to $4.5M ceiling
- Northrop Grumman Systems CorporationPRELIMINARY INSTALLATION DESIGNU.S. Navy · Definitive Contract · Feb 22, 2017$60.9Mobligated · up to $70.7M ceiling
- TextronIGF::OT::IGF TIE DOWN&SECURING STRESS ANALYSISU.S. Navy · Delivery Order · Jan 20, 2017$681Kobligated · up to $681K ceiling
- Northrop Grumman Systems CorporationIGF::OT::IGF ENGINEERING/SOFTWARE SUSTAINMENTU.S. Navy · Definitive Contract · Dec 27, 2016$73.3Mobligated · up to $78.0M ceiling
- Northrop Grumman Systems CorporationMQ-8C AND MQ-8B RT-1939A INTEGRATION AND IFF UPGRADEU.S. Navy · Delivery Order · Dec 21, 2016$589Kobligated · up to $723K ceiling
- Northrop Grumman Systems CorporationN1 ASSESSMENT FOR REPAIRU.S. Navy · Delivery Order · Dec 21, 2016$225Kobligated · up to $225K ceiling
- Northrop Grumman Systems CorporationRETROFIT KIT, RADAR RDCU.S. Navy · Delivery Order · Sep 30, 2016$2.5Mobligated · up to $2.5M ceiling
- Northrop Grumman Systems CorporationDCP SW REFACTORING&VMC STUDIESU.S. Navy · Delivery Order · Sep 28, 2016$5.1Mobligated · up to $5.2M ceiling
- Northrop Grumman Systems CorporationMAIN ROTOR BLADE (MRB) VENDOR CERTIFICATION, QUALIFICATION TESTING, FATIGUE TESTING, AND INITIAL BLADE MANUFACTURE.U.S. Navy · Delivery Order · Sep 22, 2016$2.9Mobligated · up to $2.9M ceiling
- Northrop Grumman Systems CorporationCABLE HARNESS ASSEMBLYU.S. Navy · Delivery Order · May 25, 2016$79Kobligated · up to $79K ceiling
- Northrop Grumman Systems CorporationNRE BELL 407 DIGITAL COCKPIT ECPU.S. Navy · Delivery Order · Mar 31, 2016$3.0Mobligated · up to $3.2M ceiling
- GE AerospacePROCUREMENT OF 12 DEFECT MEASUREMENT VIDEO BORESCOPE SETS.U.S. Navy · Definitive Contract · Sep 16, 2015$482Kobligated · up to $482K ceiling
Obligations are signed USAspending prime-contract actions coded to this program, FY2008 to date, credited to the company that received each action. Obligations are money committed, not company revenue.