Skip to content
DefDex

Aircraft · Air

P-8A Poseidon

Maritime patrol and reconnaissance aircraft with antisubmarine and antisurface warfare missions.

by Boeing · Unveiled Jul 30, 2009 · First fielded 2013

FieldedAircraftAirInitial operating capabilityNov 2013
navy.mil/Resources/Fact-Files/Display-FactFiles/Article/2166300/p-8a-poseidon-multi-mission-maritime-aircraft-mma
A U.S. Navy P-8A Poseidon test aircraft in flight over Chesapeake Bay

Photo: U.S. Navy photo by Greg L. Davis · Public domain (PD-USGov-Military-Navy) · Resized and reencoded as WebP; no additional crop.

Boeing multimission maritime patrol aircraft for anti-submarine and anti-surface warfare, intelligence, surveillance and reconnaissance, maritime awareness and search and rescue. The P-8 uses a 737-derived airframe and an integrated mission system; the P-8I is a distinct Indian Navy variant.

Timeline2

  1. UnveiledConfirmed

    P-8A Poseidon formally unveiled

    Formal rollout ceremony at Renton; event date is established by the release dateline and “today”.

  2. Initial operating capabilityConfirmed

    P-8A initial operational capability

The latest 10 milestones. Solid entries are confirmed, outlined reported, dashed estimated or still to come; dotted italic entries are speculative. Dates show only the precision the sources give.

Operators1

  • USUnited States
First fielded
2013

Cost to the Government

Aircraft · Boeing

P-8A Poseidon

Compare platform costs →

Maritime patrol and anti-submarine aircraft; domestic acquisition estimates and international aircraft packages are reported separately.

Average procurement / aircraft

$208.694M

2019-12 SAR · Then-year USD

Rounded SAR APUC: $25.0433B procurement / 120 production aircraft, including procurement support.

Department of Defense ↗

Cumulative U.S. program deliveries

96

2019-12 · U.S. only

91 production and five development; a historical delivery snapshot, not today’s fleet.

Department of Defense ↗

Program acquisition quantity

125

2019-12 · U.S. only

120 procurement plus five development in this SAR; separate force requirement was 138.

Department of Defense ↗

Development program total

$9.665B

2019-12 SAR · Then-year USD

SAR current RDT&E estimate; separate from procurement and military construction.

Department of Defense ↗

Operations & sustainment

Annual O&S / aircraft

$10.55M / yr

FY2018 · Constant FY2018 USD

GAO historical cost for the operational fleet.

GAO ↗
Cost over time · 3 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

P-8A Poseidon cost history
ObservationMeasureAmountDollar basisEvidence
FY2013Annual O&S / aircraft

Early fielding population differs from FY2018.

$8.79M / yrConstant FY2018 USDGAO ↗
FY2018Annual O&S / aircraft

GAO historical cost for the operational fleet.

$10.55M / yrConstant FY2018 USDGAO ↗
2019-12 SARAverage procurement / aircraft

Rounded SAR APUC: $25.0433B procurement / 120 production aircraft, including procurement support.

$208.694MThen-year USDDepartment of Defense ↗
Contracts & purchasing · 2 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2019-01-25 · Firm-fixed-price production lot X

    U.S. Navy → Boeing

    $1.388B · 10 units in scope

    N00019-14-C-0067/5: ten USN aircraft; narrower scope than full-program APUC.

    Department of Defense ↗
  • 2024-03 · Aircraft production award

    Canada / Germany via U.S. Navy → Boeing

    $3.4B · 17 units in scope

    14 Canadian and three additional German aircraft; not the total FMS support package.

    Boeing ↗

Connected missiles & systems

International buyers

  • Canada · 14 · Contracted aircraft · 2024-03

    This award covers 14 aircraft; options and approved sale ceilings are separate.

    Boeing ↗
  • Germany · 3 · Additional contracted aircraft · 2024-03

    Three in this award, not Germany’s total fleet or total orders.

    Boeing ↗
Coverage & open research
  • Quantity and cost figures retain their source dates. Historical snapshots are not a census of operational availability on the review date.

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.