Budget tracker
San Antonio-class Amphibious Transport Dock (LPD 17)
By Fiscal Year
FY2025
- Requested
- —
- Enacted
- $1.60B$1,600,078,000
Appropriation
- Procurement · 1611 LPD Flight II · Appropriation · $1.56B
- Procurement · 1810 LPD Class Support Equipment · Appropriation · $38.1M
- Announced ceiling (not spending)
- —
- Obligated
- $798M$798,325,261.55
7 linked awards, 23 actions
FY2026
- Requested
- $2.26B$2,255,505,000
President's budget
- Procurement · 1611 LPD Flight II · Mandatory · President's budget · $2.13B
- Procurement · 1810 LPD Class Support Equipment · Discretionary · President's budget · $101M
- Procurement · 1810 LPD Class Support Equipment · Mandatory · President's budget · $24.5M
- Enacted
- $126M$125,542,000
Appropriation; Spend-plan allocation
- Procurement · 1810 LPD Class Support Equipment · Discretionary · Appropriation · $96.5M
- Procurement · 1810 LPD Class Support Equipment · Mandatory · Spend-plan allocation · $29.0M
- Announced ceiling (not spending)
- —
- Obligated
- $1.01B$1,013,798,405.32
9 linked awards, 48 actions · partial year
FY2027
- Requested
- $2.41B$2,406,423,000
President's budget
- Procurement · 1611 LPD Flight II · Discretionary · President's budget · $2.19B
- Procurement · 1611 LPD Flight II · Mandatory · President's budget · $4.0M
- Procurement · 1810 LPD Class Support Equipment · Discretionary · President's budget · $214M
- Enacted
- —
- Announced ceiling (not spending)
- —
- Obligated
- No actions recorded on published linked awards yet
Each column is a different measure and they are not added together. A request and an enacted amount for the same year sit side by side; the request is never rewritten when an enacted amount arrives. A blank state names why there is no amount; only a stated amount, including a stated $0, shows dollars.
Sources and Evidence10
FY2025 · Enacted (Appropriation)
Procurement · 1611 LPD Flight II
$1,561,963,000as printed 1,561,963 ($ thousands)FY 2026 Procurement Programs (P-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2025 EnactedExhibit P-1, Shipbuilding and Conversion, Navy / Aircraft Procurement as named, line 19 1611 LPD Flight II, PDF page 83. Dollars in thousands. Column 'FY 2025 Enacted'.19 LPD Flight II A U 1 (2,062,963) 1 (2,129,963) 1 (2,129,963) Less: Advance Procurement (PY) (-501,000) 1,561,963 2,129,963 2,129,963
FY2025 · Enacted (Appropriation)
Procurement · 1810 LPD Class Support Equipment
$38,115,000as printed 38,115 ($ thousands)FY 2026 Procurement Programs (P-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2025 EnactedExhibit P-1, 1810 Other Procurement, Navy FY 2024 Actuals FY 2025 Enacted Request Request FY 2026 Total, line 15 LPD, PDF page 93. Dollars in thousands. Column 'FY 2025 Enacted'.15 LPD Class Support Equipment U 80,933 38,115 101,042 24,500 125,542
FY2026 · Requested (President's budget)
Procurement · 1611 LPD Flight II · Mandatory
$2,129,963,000as printed 2,129,963 ($ thousands)FY 2026 Procurement Programs (P-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2026 Reconciliation RequestExhibit P-1, Shipbuilding and Conversion, Navy / Aircraft Procurement as named, line 19 1611 LPD Flight II, PDF page 83. Dollars in thousands. Column 'FY 2026 Reconciliation Request'.19 LPD Flight II A U 1 (2,062,963) 1 (2,129,963) 1 (2,129,963) Less: Advance Procurement (PY) (-501,000) 1,561,963 2,129,963 2,129,963
FY2026 P-1 reconciliation column = mandatory request (corrects unspecified figure lpd-17-san-antonio:fy2026:requested:procurement:1611-lpd-flight-ii:unspecified:president-budget, deleted in batch budget-reconciliation-funding-type-2026-10-22).FY2026 · Requested (President's budget)
Procurement · 1810 LPD Class Support Equipment · Discretionary
$101,042,000as printed 101,042 ($ thousands)FY 2026 Procurement Programs (P-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2026 Disc RequestExhibit P-1, 1810 Other Procurement, Navy FY 2024 Actuals FY 2025 Enacted Request Request FY 2026 Total, line 15 LPD, PDF page 93. Dollars in thousands. Column 'FY 2026 Disc Request'.15 LPD Class Support Equipment U 80,933 38,115 101,042 24,500 125,542
FY2026 · Requested (President's budget)
Procurement · 1810 LPD Class Support Equipment · Mandatory
$24,500,000as printed 24,500 ($ thousands)FY 2026 Procurement Programs (P-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2026 Reconciliation RequestExhibit P-1, 1810 Other Procurement, Navy FY 2024 Actuals FY 2025 Enacted Request Request FY 2026 Total, line 15 LPD, PDF page 93. Dollars in thousands. Column 'FY 2026 Reconciliation Request'.15 LPD Class Support Equipment U 80,933 38,115 101,042 24,500 125,542
FY2026 P-1 reconciliation column = mandatory request (corrects unspecified figure lpd-17-san-antonio:fy2026:requested:procurement:1810-lpd-class-support-equipment:unspecified:president-budget, deleted in batch budget-reconciliation-funding-type-2026-10-22).FY2026 · Enacted (Appropriation)
Procurement · 1810 LPD Class Support Equipment · Discretionary
$96,542,000as printed 96,542 ($ thousands)Department of War FY 2027 President's Budget, Procurement Programs (P-1) Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2026 Discretionary EnactedExhibit P-1, 1810 Other Procurement, Navy FY 2025 Actuals Enacted Plan FY 2026 Total, line 15 LPD, PDF page 170. Dollars in thousands. Column 'FY 2026 Discretionary Enacted'.15 LPD Class Support Equipment U 45,738 96,542 29,000 125,542
FY2026 · Enacted (Spend-plan allocation)
Procurement · 1810 LPD Class Support Equipment · Mandatory
$29,000,000as printed 29,000 ($ thousands)Department of War FY 2027 President's Budget, Procurement Programs (P-1) Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026P.L. 119-21 spend plan, as reported in the FY2027 President's Budget (Apr 2026), column FY 2026 PL 119-21 Spend PlanExhibit P-1, 1810 Other Procurement, Navy FY 2025 Actuals Enacted Plan FY 2026 Total, line 15 LPD, PDF page 170. Dollars in thousands. Column 'FY 2026 PL 119-21 Spend Plan'.15 LPD Class Support Equipment U 45,738 96,542 29,000 125,542
FY2027 · Requested (President's budget)
Procurement · 1611 LPD Flight II · Discretionary
$2,188,700,000as printed 2,188,700 ($ thousands)Department of War FY 2027 President's Budget, Procurement Programs (P-1) Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2027 Discretionary RequestExhibit P-1, Shipbuilding and Conversion, Navy / Aircraft Procurement as named, line 18 1611 LPD Flight II, PDF page 149. Dollars in thousands. Column 'FY 2027 Discretionary Request'.18 LPD Flight II A U (2,527,700) (4,000) 1 (2,531,700) Less: Advance Procurement (PY) (-339,000) (-339,000) Less: Subsequent Full Funding (FY) 2,188,700 4,000 2,192,700
FY2027 · Requested (President's budget)
Procurement · 1611 LPD Flight II · Mandatory
$4,000,000as printed 4,000 ($ thousands)Department of War FY 2027 President's Budget, Procurement Programs (P-1) Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2027 Mandatory RequestExhibit P-1, Shipbuilding and Conversion, Navy / Aircraft Procurement as named, line 18 1611 LPD Flight II, PDF page 149. Dollars in thousands. Column 'FY 2027 Mandatory Request'.18 LPD Flight II A U (2,527,700) (4,000) 1 (2,531,700) Less: Advance Procurement (PY) (-339,000) (-339,000) Less: Subsequent Full Funding (FY) 2,188,700 4,000 2,192,700
FY2027 · Requested (President's budget)
Procurement · 1810 LPD Class Support Equipment · Discretionary
$213,723,000as printed 213,723 ($ thousands)Department of War FY 2027 President's Budget, Procurement Programs (P-1) Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2027 Discretionary RequestExhibit P-1, 1810 Other Procurement, Navy Request Request FY 2027 Total, line 15 LPD, PDF page 171. Dollars in thousands. Column 'FY 2027 Discretionary Request'.15 LPD Class Support Equipment U 213,723 213,723
Every figure keeps its document, date, page or table, original unit and a short excerpt. Superseded figures stay on record. Amounts are exact; compact figures round.
Linked Awards26
- 200412!055677!1700!BY005 !NAVSEA WASHINGTON DC !N0017804D4026 !A!N! !Y!0003 ! !20040924!20050930!057364507!094107844!045534641!N!CACI TECHNOLOGIES, INC !14151 PARK MEADOW DRIVE !CHANTILLY !VA!20151!50000!001!11!WASHINGTON !DISTRICT OF COLUMBIA !D.C. !+000000452741!N!N!000000000000!R408!PROGRAM MANAGEMENT/SUPPORT SERVICES !S1 !SERVICES !542 !LPD 17 !541330!E! !5!B!M! !A!D!20060331!B! ! !A! !A!N!U!2!021!B! !Z!N!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! !
CONT_AWD_0003_9700_N0017804D4026_9700
CACI TECHNOLOGIES, LLC · Award title or description names the program
W DRIVE !CHANTILLY !VA!20151!50000!001!11!WASHINGTON !DISTRICT OF COLUMBIA !D.C. !+000000452741!N!N!000000000000!R408!PROGRAM MANAGEMENT/SUPPORT SERVICES !S1 !SERVICES !542 !LPD 17 !541330!E! !5!B!M! !A!D!20060331!B! ! !A! !A!N!U!2!021!B! !Z!N!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! !
- FY2008: $650,401
- FY2009: $28,772
- 200412!055563!1700!BY005 !NAVSEA WASHINGTON DC !N0017804D4091 !A!N! !Y!0005 ! !20040929!20050331!064683464!008255408!016435559!N!NORTHROP GRUMMAN DEFENSE MISSI!12011 SUNSET HILLS ROAD !RESTON !VA!20190!50000!001!11!WASHINGTON !DISTRICT OF COLUMBIA !D.C. !+000000573325!N!N!000000000000!R408!PROGRAM MANAGEMENT/SUPPORT SERVICES !S1 !SERVICES !542 !LPD 17 !541330!E! !5!B!M! !A!D!20060331!B! ! !A! !A!N!U!2!021!B! !Z!N!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! !
CONT_AWD_0005_9700_N0017804D4091_9700
NORTHROP GRUMMAN SYSTEMS CORPORATION · Award title or description names the program
LS ROAD !RESTON !VA!20190!50000!001!11!WASHINGTON !DISTRICT OF COLUMBIA !D.C. !+000000573325!N!N!000000000000!R408!PROGRAM MANAGEMENT/SUPPORT SERVICES !S1 !SERVICES !542 !LPD 17 !541330!E! !5!B!M! !A!D!20060331!B! ! !A! !A!N!U!2!021!B! !Z!N!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! !
- FY2008: $1,708,583
- FY2009: $56,946
- FY2010: $17,161
- FY2023: −$32,291.23
- FINLAND FMS ISS CY13
CONT_AWD_0032_9700_N0001909D0010_9700
THE BOEING COMPANY (0674) · DoW program code reported on the award
LPD 17
- FY2013: $1,811,790
- FY2014: $92,988
- FY2015: $0
- FY2019: −$249,062.69
- NAVWAR FY12 KITS FOR USN
CONT_AWD_0105_9700_N0001911G0001_9700
THE BOEING COMPANY · DoW program code reported on the award
LPD 17
- FY2013: $7,452,502.78
- FY2014: $0
- FY2015: $0
- FY2016: $0
- LPD-17 PRE-COMMISSIONING CREW SUPPORT
CONT_AWD_EH04_9700_N0017804D4091_9700
NORTHROP GRUMMAN SYSTEMS CORPORATION · Award title or description names the program
LPD-17 PRE-COMMISSIONING CREW SUPPORT
- FY2009: $1,405,117
- FY2010: $2,435,000
- FY2011: $3,500,000
- FY2012: $1,591,417
- FY2013: $2,723,218
- FY2014: $248,739.94
- FY 07 LPD 17 CLASS ENGINEER SERVICES
CONT_AWD_N0002405C2217_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · Award title or description names the program
FY 07 LPD 17 CLASS ENGINEER SERVICES
- FY2008: $34,504,597
- FY2009: $32,884,033
- FY2010: $3,733,952
- FY2011: −$7,052,771
- FY2012: $536,286
- FY2013: −$1,199,226
- FY2014: −$123,166
- FY2015: $0
- THE PURPOSE OF THIS MODIFICATION TO CONTRACT N00024-05-C-2224 IS TO: (1) INCREASE THE ESTIMATED MAN-HOURS, COST, AND FEES OF CLIN 0011 BY 110,000 MAN-HOURS IN ORDER TO SUPPORT ACCOMPLISHMENT OF PSA WORK ON LPD 17 (SAN ANTONIO) AS A RESULT OF INCREASED SCOPE; (2) EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0011; (3) REVISE B-7 DETERMINATION OF AWARD FEE (NAVSEA); AND (4) PROVIDE ADDITIONAL FUNDING UNDER SLIN 0011AC.
CONT_AWD_N0002405C2224_9700_-NONE-_-NONE-
BAE SYSTEMS MARITIME SOLUTIONS NORFOLK INC. · Award title or description names the program
HIS MODIFICATION TO CONTRACT N00024-05-C-2224 IS TO: (1) INCREASE THE ESTIMATED MAN-HOURS, COST, AND FEES OF CLIN 0011 BY 110,000 MAN-HOURS IN ORDER TO SUPPORT ACCOMPLISHMENT OF PSA WORK ON LPD 17 (SAN ANTONIO) AS A RESULT OF INCREASED SCOPE; (2) EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0011; (3) REVISE B-7 DETERMINATION OF AWARD FEE (NAVSEA); AND (4) PROVIDE ADDITIONAL FUNDING UNDER SLIN 0011AC.
- FY2008: $44,250,532.27
- FY2009: $8,729,780.54
- FY2010: $1,411,505
- FY2011: −$357,000
- THE PURPOSE OF THIS MODIFICATION TO CONTRACT N00024-06-C-2207 IS TO PROVIDE FUNDING UNDER SLINS 020101, 020401, 020402, 020403, AND 020702.
CONT_AWD_N0002406C2207_9700_-NONE-_-NONE-
RAYTHEON COMPANY · DoW program code reported on the award
LPD 17
- FY2008: $25,541,865
- FY2009: $19,449,441.79
- FY2010: −$2,728,965.64
- FY2011: −$31,340
- FY2012: −$641,943.15
- FY2014: −$507,715.50
- FY2015: −$153,601.06
- FY2016: −$61,607.08
- FY2017: $0
- FY2021: −$426,454.51
- FY2026: −$39,525.70
- DETAIL DESIGN AND CONSTRUCTION OF LPD 17 CLASS SHIP (LPD 22)
CONT_AWD_N0002406C2222_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · Award title or description names the program
DETAIL DESIGN AND CONSTRUCTION OF LPD 17 CLASS SHIP (LPD 22)
- FY2008: $1,013,157,849
- FY2009: $388,439,179
- FY2010: $126,316,407.67
- FY2011: $1,619,991,170
- FY2012: $1,529,426,168
- FY2013: $1,482,589,580.09
- FY2014: $49,828,396
- FY2015: $83,582,503.04
- FY2016: $48,850,099
- FY2017: $42,894,964
- FY2018: −$25,904,100
- FY2019: −$14,503,199
- FY2020: −$138,070
- FY2021: $0
- FY2022: −$1,110,497.75
- THIS CONTRACT ACTION WAS FOR THE AWARD OF CONTRACT N00024-07-C-2200 FOR WEST COAST FOA AND PSA WORK ON LPD 18 AND LPD 20 SHIPS. OPTION CLIN 0004 WAS EXERCISED AT TIME OF AWARD, AND FUNDS WERE OBLIGATED TO CLINS 0001 AND 0004 AT TIME OF BASE CONTRACT AWARD.
CONT_AWD_N0002407C2200_9700_-NONE-_-NONE-
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. · Award title or description names the program
THIS CONTRACT ACTION WAS FOR THE AWARD OF CONTRACT N00024-07-C-2200 FOR WEST COAST FOA AND PSA WORK ON LPD 18 AND LPD 20 SHIPS. OPTION CLIN 0004 WAS EXERCISED AT TIME OF AWARD, AND FUNDS WERE OBLIGATED TO CLINS 0001 AND 0004 AT TIME OF BASE CONTRACT AWARD.
- FY2008: $26,880,878.26
- FY2009: $23,436,588
- FY2010: $19,237,178
- FY2011: −$1,894,014
- FY2013: −$286,500
- LPD 17 CLASS ENGINEERING SERVICES
CONT_AWD_N0002410C2203_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · Award title or description names the program
LPD 17 CLASS ENGINEERING SERVICES
- FY2010: $37,979,856
- FY2011: $40,749,110
- FY2012: $35,259,922
- FY2013: $56,621,194
- FY2014: $23,653,310
- FY2015: $40,474,022.04
- FY2016: $5,060,326
- FY2017: −$2,997,483
- FY2021: −$10,316
- FY2025: −$690,295
- LIFE CYCLE ENGINEERING AND SUPPORT (LCE&S) SERVICES FOR SELECT ELECTRONIC SYSTEMS IN THE LPD 17 CLASS AMPHIBIOUS TRANSPORT DOCK SHIPS
CONT_AWD_N0002410C2205_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Award title or description names the program
LIFE CYCLE ENGINEERING AND SUPPORT (LCE&S) SERVICES FOR SELECT ELECTRONIC SYSTEMS IN THE LPD 17 CLASS AMPHIBIOUS TRANSPORT DOCK SHIPS
- FY2010: $32,477,583
- FY2011: $29,790,881.66
- FY2012: $24,934,026
- FY2013: $29,683,774.48
- FY2014: $17,166,808
- FY2015: −$3,248,809.74
- FY2016: −$147,637.83
- FY2017: −$88,183.35
- FY2018: −$13,339.15
- FY2019: −$87,940
- FY2020: −$90,975.85
- FY2026: −$284,835.35
- LONG-LEAD-TIME MATERIAL FOR LPD 26 INTEGRATED SHIPBOARD ELECTRONICS
CONT_AWD_N0002411C2404_9700_-NONE-_-NONE-
RAYTHEON COMPANY · DoW program code reported on the award
LPD 17
- FY2011: $11,751,091
- FY2012: $96,037,875
- FY2013: $1,229,288
- FY2014: $2,229,911
- FY2015: $1,178,724
- FY2016: $9,646,137
- FY2017: $6,713,461
- FY2018: −$211,289.67
- FY2019: $0
- FY2020: $4,500.42
- FY2021: $185,000
- FY2022: $152,161.80
- IGF::CT::IGF ISE SAS (317)
CONT_AWD_N0002415C2414_9700_-NONE-_-NONE-
RAYTHEON COMPANY · DoW program code reported on the award
LPD 17
- FY2015: $23,428,143
- FY2016: $29,027,315
- FY2017: $28,388,947
- FY2018: $21,456,430.88
- FY2019: $25,617,815
- FY2020: −$2,878,179.05
- FY2021: −$60,057.20
- FY2022: −$33,454.50
- FY2025: −$577,955.45
- IGF::CT::IGF LPD 17 LIFE CYCLE ENGINEERING AND SUPPORT
CONT_AWD_N0002416C2415_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · Award title or description names the program
IGF::CT::IGF LPD 17 LIFE CYCLE ENGINEERING AND SUPPORT
- FY2016: $52,507,425
- FY2017: $58,421,776
- FY2018: $48,320,370
- FY2019: $83,151,038
- FY2020: $54,231,198
- FY2021: $24,757,807.98
- FY2022: −$5,014,981
- FY2023: −$2,656,199
- FY2025: −$6,395,584
- LPD 28 LONG LEAD TIME MATERIAL
CONT_AWD_N0002416C2431_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · DoW program code reported on the award
LPD 17
- FY2016: $258,406,528
- FY2017: $1,294,785,710
- FY2018: $1,323,007,503
- FY2019: $40,641,085
- FY2020: $17,584,453
- FY2021: $6,887,996.94
- FY2022: $15,682,945
- FY2023: $18,499,400
- FY2024: $22,460,636
- FY2025: −$649,591
- LPD 26 PSA - SCN
CONT_AWD_N0002416C2439_9700_-NONE-_-NONE-
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. · DoW program code reported on the award
LPD 17
- FY2016: $5,150,720
- FY2017: $20,290,258
- FY2018: $17,460,073
- FY2019: $1,113,547
- FY2020: $1,003,659
- IGF::OT::IGF THIS PROCUREMENT IS FOR POST DELIVERY PLANNING YARD SERVICES IN SUPPORT OF THE LHA 7 AMPHIBIOUS ASSAULT SHIP. THE SERVICES INCLUDE: POST-DELIVERY PLANNING, MATERIAL PROCUREMENT AND SUPPORT SERVICES FOR INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA), POST DELIVERY AVAILABILITY (PDA), FITTING-OUT AVAILABILITY (FOA), POST SHAKEDOWN AVAILABILITY (PSA), AND EMERGENT WORK.
CONT_AWD_N0002417C2473_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · DoW program code reported on the award
LPD 17
- FY2017: $7,016,664
- FY2018: $10,789,732
- FY2019: $45,997,739
- FY2020: −$2,411,918
- FY2021: $7,210,582
- FY2022: −$2,498,302.80
- FY2026: −$59,838
- IGF::OT::IGF USS SAN ANTONIO (LPD 17) DPMA
CONT_AWD_N0002417C4409_9700_-NONE-_-NONE-
BAE SYSTEMS MARITIME SOLUTIONS NORFOLK INC. · Award title or description names the program
IGF::OT::IGF USS SAN ANTONIO (LPD 17) DPMA
- FY2017: $98,507,206
- FY2018: $17,014,339.11
- FY2019: $10,084,251
- FY2020: $8,324,218.48
- FY2022: $2,393,488.40
- IGF::OT::IGF USS NEW ORLEANS (LPD 18) DSRA
CONT_AWD_N0002417C4414_9700_-NONE-_-NONE-
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. · Award title or description names the program
IGF::OT::IGF USS NEW ORLEANS (LPD 18) DSRA
- FY2017: $62,708,519
- FY2018: $5,580,616
- FY2019: −$197,335
- FY2020: $332,773
- INTEGRATED SHIPBOARD ELECTRONICS (ISE)
CONT_AWD_N0002420C2422_9700_-NONE-_-NONE-
RAYTHEON COMPANY · DoW program code reported on the award
LPD 17
- FY2020: $4,315,288
- FY2021: $82,330
- FY2022: $2,853,358.62
- FY2023: $1,524,946
- FY2024: $1,430,775
- FY2025: $461,690
- FY2026: $737,664.73
- LPD 28 FITTING OUT AVAILABILITY - SCN
CONT_AWD_N0002421C2451_9700_-NONE-_-NONE-
BAE SYSTEMS MARITIME SOLUTIONS NORFOLK INC. · DoW program code reported on the award
LPD 17
- FY2021: $1,500,000
- FY2022: $40,156,930.57
- FY2023: $6,518,223
- FY2024: $38,276,754
- FY2025: $34,176,997
- FY2026: $29,630,716
- LPD 33, 34, AND 35 DD&CS
CONT_AWD_N0002424C2473_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · DoW program code reported on the award
LPD 17
- FY2024: $450,000,000
- FY2025: $772,000,000
- FY2026: $949,412,000
- LPD 17 CLASS POST DELIVERY AND ENGINEERING SUPPORT (PD&ES)
CONT_AWD_N0002426C2443_9700_-NONE-_-NONE-
HUNTINGTON INGALLS INCORPORATED · Award title or description names the program
LPD 17 CLASS POST DELIVERY AND ENGINEERING SUPPORT (PD&ES)
- FY2026: $34,041,912
- USS SAN ANTONIO (LPD 17) SERM-037-26
CONT_AWD_N6883626P0003_9700_-NONE-_-NONE-
METRO MACHINE CORP · Award title or description names the program
USS SAN ANTONIO (LPD 17) SERM-037-26
- FY2026: $171,264.44
- USS IWO JIMA (LHD 7) SERM-041-26
CONT_AWD_N6883626P0004_9700_-NONE-_-NONE-
METRO MACHINE CORP · DoW program code reported on the award
LPD 17
- FY2026: $189,047.20
USAspending awards reviewed as belonging to this program, matched on the exact award key, never on a similar name. Some are linked only because the DoW acquisition program code reported on the award maps to this program; that code is the agency's own field and can be wrong, so those rows are labelled separately. Net obligations through Oct 6, 2026; later years are partial. The appropriation that paid for an award is not identified, so obligations are not compared with the enacted column.
Method
Four measures
- Requested
- What a budget request asked for. Not money Congress provided.
- Enacted
- What a law provided, or a spend plan's allocation of a law's lump sum.
- Announced ceiling
- The most a contract vehicle or agreement could be worth, as announced. Not spending.
- Obligated
- Net obligations on USAspending actions of the awards linked to the program. The funding account is not identified.
An announced ceiling is not spending
Figures come from the budget justification books, public laws and agency announcements named in the evidence table; where a source shows no amount the tracker says so rather than showing zero, and where DefDex has not yet checked a source it says that too. See the methodology for how federal obligations are counted.