Program · United States · U.S. Navy
San Antonio-class Amphibious Transport Dock (LPD 17)
San Antonio-class amphibious transport dock (LPD 17) · Production · U.S. Navy
The profile’s obligated figure counts resolved program awards from reported acquisition codes and reviewed links, with shared awards excluded; the tracker counts catalog fiscal years of resolved reviewed award links, so the figures can differ. The budget tracker separates requested, enacted, announced ceiling and obligated amounts for FY2025–FY2027: San Antonio-class amphibious transport dock (LPD 17) figures cover P-1 lines 1810 LPD Class Support Equipment. The figures also cover SCN line 1611 LPD Flight II. Obligations are only the USAspending awards carrying reviewed DoW acquisition program code 542 (LPD 17). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.
About
Class of amphibious transport docks built by Huntington Ingalls Industries that embark, transport and land elements of a Navy and Marine Corps landing force. The first ship, USS San Antonio (LPD 17), was delivered in July 2005; Flight II ships will replace the LSD 41/49 Whidbey Island class. LPD 30-32 are under construction and LPD 33-35 are under contract.
News1
Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Totals · 1 | ||
| Development program totalA separately scoped historical development total has not been verified. | Not established | — |
| Unit costs · 1 | ||
| Flight II ship procurement estimateCRS detailed procurement-cost section; fifth Flight II ship, not the average price of legacy Flight I. | $2.13BThen-year $ | LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure FY2026 budget |
| Quantities · 2 | ||
| Historical fleet snapshotGAO sustainment-study inventory; not the current delivery count. | 11U.S. only | Weapon System Sustainment: GAO-23-106440, FY2020 costs and FY2021 inventories GAO · figure FY2021 |
| Procured through FY202513 Flight I plus four Flight II according to CRS; does not imply all delivered. | 17U.S. only | LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure FY2025 |
| Operating costs · 2 | ||
| Annual O&S / shipGAO reported average for this class; this is a historical annual cost, not a current operating budget. | $79.9M / yrConstant FY2021 $ | Weapon System Sustainment: GAO-23-106440, FY2020 costs and FY2021 inventories GAO · figure FY2020 |
| Annual maintenance / shipMaintenance is included in O&S above; do not add the two. | $28.4M / yrConstant FY2021 $ | Weapon System Sustainment: GAO-23-106440, FY2020 costs and FY2021 inventories GAO · figure FY2020 |
Totals · 1
- Development program totalA separately scoped historical development total has not been verified.Source not recordedNot established
Unit costs · 1
- Flight II ship procurement estimateCRS detailed procurement-cost section; fifth Flight II ship, not the average price of legacy Flight I.LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure FY2026 budget$2.13BThen-year $
Quantities · 2
- Historical fleet snapshotGAO sustainment-study inventory; not the current delivery count.Weapon System Sustainment: GAO-23-106440, FY2020 costs and FY2021 inventories GAO · figure FY202111U.S. only
- Procured through FY202513 Flight I plus four Flight II according to CRS; does not imply all delivered.LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure FY202517U.S. only
Operating costs · 2
- Annual O&S / shipGAO reported average for this class; this is a historical annual cost, not a current operating budget.Weapon System Sustainment: GAO-23-106440, FY2020 costs and FY2021 inventories GAO · figure FY2020$79.9M / yrConstant FY2021 $
- Annual maintenance / shipMaintenance is included in O&S above; do not add the two.Weapon System Sustainment: GAO-23-106440, FY2020 costs and FY2021 inventories GAO · figure FY2020$28.4M / yrConstant FY2021 $
Earlier observations · 2
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| Flight II ship procurement estimateCRS detailed procurement-cost section; fifth Flight II ship, not the average price of legacy Flight I. | $2.13BThen-year $ | LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure FY2026 budget |
| Lead Flight II cost targetDesign target, not an actual price or the FY2026 estimate. | $1.643BConstant FY2014 $ | LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure 2015 target |
- Flight II ship procurement estimateCRS detailed procurement-cost section; fifth Flight II ship, not the average price of legacy Flight I.LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure FY2026 budget$2.13BThen-year $
- Lead Flight II cost targetDesign target, not an actual price or the FY2026 estimate.LPD-17 Flight II and LHA amphibious ship programs, FY2026 budget CRS · figure 2015 target$1.643BConstant FY2014 $
Flights are different cost scopes
Flight II is intended to replace older dock landing ships. Its design target and new-build estimate should be separated from the support costs of the earlier Flight I fleet.
Contracts & purchasing · 1
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Stated amount | Qty | Source |
|---|---|---|---|---|
| U.S. Navy → HII IngallsIncludes three LPDs and one LHA, not four LPDs. Same package shown on America; do not double count. | Combined multi-ship award | $9.6B | 4 | 2024 results: $9.6B amphibious multi-ship award HII · figure Sep 2024 |
Open research: Separately scoped historical R&D total remains unverified; missing is not zero. Quantity and cost figures retain their source dates. Historical snapshots are not a census of operational availability on the review date. No international purchase record verified in this profile; this is not proof that no foreign operators exist.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
Contracts$13.43B obligated on code-mapped awards
- Code-mapped awards are every contract award in the USAspending baseline (DoD, DHS, DOE and NASA, FY2008–FY2027) whose latest reported acquisition program code is this program's, whichever company received it; vehicles (IDVs) are excluded.
By fiscal year19
| Fiscal year | Obligated | Actions |
|---|---|---|
| FY2008 | $1.19B obligated | 259 |
| FY2009 | $517M obligated | 280 |
| FY2010 | $258M obligated | 355 |
| FY2011 | $1.74B obligated | 294 |
| FY2012 | $1.70B obligated | 313 |
| FY2013 | $1.60B obligated | 289 |
| FY2014 | $106M obligated | 246 |
| FY2015 | $153M obligated | 173 |
| FY2016 | $412M obligated | 149 |
| FY2017 | $1.62B obligated | 232 |
| FY2018 | $1.42B obligated | 254 |
| FY2019 | $193M obligated | 213 |
| FY2020 | $81.0M obligated | 165 |
| FY2021 | $40.0M obligated | 172 |
| FY2022 | $52.6M obligated | 119 |
| FY2023 | $23.4M obligated | 69 |
| FY2024 | $512M obligated | 53 |
| FY2025 | $798M obligated | 24 |
| FY2026 | $1.01B obligated | 49 |
Contractors9
- HII$12.32B obligated 92%
- BAE Systems$521M obligated 3.9%
- RTX$435M obligated 3.2%
- ICI SERVICES CORPORATION$19.5M obligated 0.1%
- Northrop Grumman$13.7M obligated 0.1%
- Boeing$9.1M obligated 0.1%
- CACI International$679K obligated 0.0%
- General Dynamics$360K obligated 0.0%
- SAFE Boats International−$16K obligated
- Recipients without a DefDex profile (6 awards)$104M obligated 0.8%
Reported acquisition program code 542; program scope may be incomplete or miscoded · 36 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.
Participants3
Prime
3- Ingalls ShipbuildingConfirmed
- RTXConfirmed

Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.
Budget Lines
- SCN P-1 line 18
- SCN P-1 line 19
Budget line items recorded for this program.