Prime · United States
Ingalls Shipbuilding
HQ United States
Ingalls Shipbuilding is HII’s surface-ship construction division in Pascagoula, Mississippi.
- Part ofHII
About Ingalls Shipbuilding
Ingalls Shipbuilding designs, builds and maintains U.S. Navy surface combatants and amphibious ships and undertakes modernization work. HII’s current company overview identifies multiple ship classes under construction, Zumwalt-class modernization and frigate lead-yard support activity. Ingalls combines ship design, module fabrication, assembly, outfitting and systems integration with lifecycle support. It is distinct from HII’s Newport News nuclear shipyard and Mission Technologies services business. Ship-class programs can involve multiple builders; HII parent totals and Ingalls division activity therefore should not be added together. Its hiring spans welding, shipfitting, electrical work, engineering and production support.
Federal Prime Contracts$57.75B obligated · FY2008–FY2026
- Obligated
- $57.75B
- FY2008–FY2026
- Contract actions
- 12,411
- 161 awards
- Peak year
- FY2023
- $5.64B
- Top buyer
- U.S. Navy
- 93% of obligations
Show as table
| Fiscal year | Obligated | Actions | Awards |
|---|---|---|---|
| FY2026 (to date) | $3.63B | 0 | — |
| FY2025 | $4.37B | 0 | — |
| FY2024 | $2.43B | 0 | — |
| FY2023 | $5.64B | 0 | — |
| FY2022 | $1.65B | 0 | — |
| FY2021 | $2.04B | 0 | — |
| FY2020 | $4.06B | 0 | — |
| FY2019 | $3.58B | 0 | — |
| FY2018 | $4.75B | 0 | — |
| FY2017 | $3.67B | 0 | — |
| FY2016 | $2.33B | 0 | — |
| FY2015 | $1.47B | 0 | — |
| FY2014 | $1.57B | 0 | — |
| FY2013 | $3.19B | 0 | — |
| FY2012 | $3.97B | 0 | — |
| FY2011 | $4.30B | 0 | — |
| FY2010 | −$71.2M | 0 | — |
| FY2009 | $1.96B | 0 | — |
| FY2008 | $3.21B | 0 | — |
Top buyers
- U.S. Navy$53.47B 93%
- US Coast Guard$4.27B 7.4%
- Maritime Administration$65K 0.0%
Defense programs
- DDG 51 Arleigh Burke-class destroyer$20.61B 36%
- San Antonio-class amphibious transport dock (LPD 17)$12.20B 21%
- LHA 6$11.37B 20%
- DDG 1000$906M 1.6%
- AEGIS$246M 0.4%
- 2000$0 0.0%
- 2SFF$0 0.0%
- Landing Ship Dock-LSD$0 0.0%
- SF$0 0.0%
- SJS$0 0.0%
- Destroyer DDG-51−$6.2M -0.0%
Only actions coded to a DoD acquisition program.
What they sell (PSC)
- Combat Ships and Landing Vessels$36.63B 63%
- Amphibious Assault Ships$12.34B 21%
- Miscellaneous Vessels$4.27B 7.4%
- Destroyers$2.43B 4.2%
- Modification of Equipment- Ships, Small Craft, Pontoons, and Floating Docks$1.13B 2.0%
- Non-Nuclear Ship Repair (East)$452M 0.8%
- Cruisers$244M 0.4%
- Maint/Repair/Rebuild of Equipment- Ships, Small Craft, Pontoons, and Floating Docks$81.1M 0.1%
- Technical Representative- Ship and Marine Equipment$63.3M 0.1%
- National Defense R&D Services; Defense-Related Activities; R&D Administrative Expenses$56.1M 0.1%
- Construct/Ship Constr & Rep Fac$11.4M 0.0%
- Maint/Repair/Rebuild of Equipment- Ship and Marine Equipment$9.6M 0.0%
- Miscellaneous Service and Trade Equipment$8.8M 0.0%
- R&D- Defense Other: Other (Basic Research)$8.2M 0.0%
- Special Service Vessels$6.4M 0.0%
Where the work is done
- Ms$57.29B 99%
- La$454M 0.8%
- Ca$5.8M 0.0%
- Va$342K 0.0%
- Dc$65K 0.0%
- Fl$47K 0.0%
Largest awards10
- Construction of DDG 51 Ships FY23-27U.S. Navy · DDG 51 Arleigh Burke-class destroyer · USAspending ↗$8.28BAug 1, 2023
- FY18-FY22 DDG 51 Class Ship ConstructionU.S. Navy · DDG 51 Arleigh Burke-class destroyer · USAspending ↗$6.87BSep 27, 2018
- Detail Design and Construction of Lpd 17 Class Ship (Lpd 22)U.S. Navy · San Antonio-class amphibious transport dock (LPD 17) · USAspending ↗$6.34BOct 16, 2007
- Lpd 30 LltmU.S. Navy · USAspending ↗$4.72BAug 2, 2018
- Detail Design and Construction (Dd&c) for Lha 8 (Initial Effort Limited to Planning, Advanced Engineering and Procurement of Long Lead Time Material)U.S. Navy · LHA 6 · USAspending ↗$3.36BJun 30, 2016
- FY13-FY17 DDG 51 Class Ship Construction.U.S. Navy · DDG 51 Arleigh Burke-class destroyer · USAspending ↗$3.34BJun 3, 2013
- Lpd 28 Long Lead Time MaterialU.S. Navy · San Antonio-class amphibious transport dock (LPD 17) · USAspending ↗$2.98BDec 4, 2015
- Procure Long Lead Time Material (Lltm), Advanced Engineering and Planning Services and Special Studies.U.S. Navy · LHA 6 · USAspending ↗$2.70BJun 30, 2010
- Dd&cU.S. Navy · LHA 6 · USAspending ↗$2.46BOct 1, 2007
- Lpd 33, 34, and 35 Dd&csU.S. Navy · San Antonio-class amphibious transport dock (LPD 17) · USAspending ↗$2.17BSep 24, 2024
Signed obligations on federal prime contracts (award types A–D) from USAspending, FY2008 through Jul 9, 2026. Obligations are money the government committed, not company revenue, and include de-obligations. Subcontracts and grants are excluded. Matching is by registered UEI.
Capabilities2
| Technology | Role | Maturity | TRL | Notes | Confidence |
|---|---|---|---|---|---|
| Advanced manufacturing and materials | Developer | — | — | Publicly described capabilities; no product-wide maturity or TRL inferred. | Confirmed |
| Logistics and sustainment | Developer | — | — | Publicly described capabilities; no product-wide maturity or TRL inferred. | Confirmed |
- DeveloperPublicly described capabilities; no product-wide maturity or TRL inferred.—Confirmed
- DeveloperPublicly described capabilities; no product-wide maturity or TRL inferred.—Confirmed
Maturity and TRL describe this organization's work; the field-wide maturity is on each technology's page.
Supply Chain1 facility
Facilities1
| Facility | Kind | Location | Status | Confidence |
|---|---|---|---|---|
| Pascagoula shipyard | Shipyard | Pascagoula, Mississippi, United States | Operating | Confirmed |
- Pascagoula shipyardShipyard · Pascagoula, Mississippi, United StatesOperatingConfirmed
Hiring Observations
Use the official careers site for current openings and application requirements.
Sources3
- 1
- 2CompanyIngalls Shipbuilding | HII
Supports Organization, Organization technology
“Employing more than 11,000 employees, Ingalls Shipbuilding is the largest manufacturing employer in Mississippi”
- 3
HII · Supports Organization, Organization technology
“HII is America's largest shipbuilder and a global, all-domain defense provider. With a more”
Each fact on this page is attached to the sources that support it. Archived copies are linked when we keep one.
