Skip to content
DefDex

Timeline15

  1. ExportConfirmed

    Republic of Korea joins the Aegis fleet

    South Korea joined the international Aegis fleet with the commissioning of Sejong the Great.

  2. MilestoneConfirmed

    Aegis BMD 4.0.1 completes first successful intercept

    USS Lake Erie completed the first successful live-fire intercept by the second-generation Aegis BMD 4.0.1 system with an SM-3 Block IB. The event date uses Hawaii local time.

  3. MilestoneConfirmed

    Baseline 9.C1 demonstrates integrated air and missile defense

    USS John Paul Jones used Baseline 9.C1 in the first live-fire test of Aegis IAMD Radar Priority Mode, engaging ballistic and cruise-missile targets nearly simultaneously.

  4. MilestoneConfirmed

    Aegis Ashore completes first intercept test

    The land-based Aegis test complex in Hawaii conducted its first intercept flight test. The event occurred December 9 Hawaii time; the release was published December 10.

  5. FieldedConfirmed

    Aegis Ashore enters service in Romania

    The U.S. Aegis Ashore installation in Deveselu became operational in 2016. It is a U.S. deployment hosted in Romania, not a Romanian export sale.

  6. MilestoneConfirmed

    Aegis BMD demonstrates intercept of ICBM-class test target

    USS John Finn and an SM-3 Block IIA intercepted an ICBM-representative target in the FTM-44 developmental test near Hawaii. This records a demonstration, not a declaration of operational capability.

  7. MilestoneConfirmed

    NATO announces Poland Aegis Ashore site mission-ready

    NATO announced that the U.S. Aegis Ashore site in Redzikowo was operational and available to defend the Alliance. The date records NATO’s announcement, not an inferred first operational day.

  8. MilestoneConfirmed

    Aegis Guam completes first local ballistic intercept test

    The Aegis Guam configuration participated in FEM-02, intercepting a ballistic test target. This was a developmental demonstration supporting the future Guam Defense System.

  9. MilestoneConfirmed

    Stellar Banshee demonstrates tracking and simulated engagement

    USS Pinckney tested Sea Based Terminal Increment 3 in FTX-40 against a hypersonic representative target. The engagement was simulated; this entry does not record a live intercept.

  10. MilestoneConfirmed

    Japan ASEV integration completes two live-target tracking events

    JFTX-01 events on March 17 and 19 tested SPY-7 integrated with the Aegis Weapon System. Both ended in virtual engagements; the date records completion of this two-event test.

View all 15 milestones →

The latest 10 milestones. Solid entries are confirmed, outlined reported, dashed estimated or still to come; dotted italic entries are speculative. Dates show only the precision the sources give.

In Service

First fielded
1983

Cost to the Government

Weapon systems · Lockheed Martin

Aegis Combat System

Compare platform costs →

Aegis BMD engineering and support contracts cover a subset of the wider combat system and multiple configurations.

Comparable unit price

Not verified

No comparable standalone unit price was established; package or contract totals are shown separately.

U.S. inventory

Not verified

A current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.

U.S. procurement quantity

Not verified

No comparable U.S. procurement quantity was established in this review.

R&D program total

Not verified

A lifetime program R&D total was not established. Development contracts and shared program budgets are not substituted for that total.

The combat system has no single universal configuration price

The award covers several ship and shore variants and multiple kinds of engineering work. It cannot be divided into a comparable shipset price, or classified entirely as R&D.

Operations & sustainment

Annual operations & support

Not verified

A complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.

Cost over time · 1 observations

Each row retains its original scope and dollar basis. Changing quantities, service life and inflation can change the estimate without changing the price of building one unit.

Aegis Combat System cost history
ObservationMeasureAmountDollar basisEvidence
2025-07-01Aegis BMD engineering contract ceiling

Ten-year mixed engineering and sustainment scope; not lifetime R&D or obligated spending.

$2.968BNominal USD; source budget basisU.S. Department of Defense ↗
Contracts & purchasing · 1 records

Award values, ceilings and purchase agreements have different meanings. These records are not added together as total spending.

  • 2025-07-01 · Ten-year IDIQ ceiling

    Missile Defense Agency → Lockheed Martin

    $2.968B · quantity not established

    Aegis BMD combat-system engineering agent: design, development, integration, sustainment and software across ships and shore variants. Maximum ordering capacity, not a system unit price.

    U.S. Department of Defense ↗

Connected missiles & systems

International buyers

No international purchase documented in this review.

Coverage & open research
  • Current U.S. inventory and complete annual operating-and-support costs require additional public evidence.
  • Buyer records are selected examples, not a complete global order book.
  • Contract unit priceEstimated
    $69.6M
    Estimate / observation: 2005-01-31 · Then-year $ · 3 units

    Navy contract to Lockheed Martin to produce three Aegis Weapon Systems for the 60th-62nd Arleigh Burke-class destroyers: $208.7M / 3 = $69.57M per shipset (Aegis Weapon System production only; excludes shipyard integration and missiles).

    Source
Budget by fiscal year
Fiscal yearAppropriationRequestEnactedQtyBudget lineSource
FY2027RDT&E$1.29B———SourceConfirmed
FY2026RDT&E$1.34B$886M——SourceConfirmed
FY2025RDT&E—$984M——SourceConfirmed

Unit costs and contract unit prices for this system, and budget figures for the programs that buy it. Each figure states its dollar basis and links its source; contract values are under Programs & awards.

Built With2

Used In1