Skip to content
DefDex

Boeing: Prime Awards

All 185,315 federal prime contract awards since FY2008, $439.30B obligated, including subsidiaries. Largest obligation first.

← Back to Boeing

Awards 1–100 of 185,315 · page 1 of 1,854

  • $31.97BFeb 24, 2011
  • USN P-8A FRP II Long Lead MaterialU.S. Navy · P-8A Poseidon · USAspending ↗
    $18.11BAug 14, 2014
  • RSAF F-15 Fleet Modernization ProgramU.S. Air Force · USAspending ↗
    $11.20BMar 8, 2012
  • Provide Developmental Hardware and Test Articles, and Manufacture and Assemble Ares I Upper Stages. the Upper Stage (US) Element Is An Integral Part of the Ares I Launch Vehicle and Provides the Second Stage of Flight. the US Element Is Responsible for the Roll Control During the First Stage Burn and Separation; and Will Provide the Guidance and Navigation, Command and Data Handling, and Other Avionics Functions for the Ares I During All Phases of the Ascent Flight. the US Element Is A New Design That Emphasizes Safety, Operability, and Minimum Life Cycle Cost. the Overall Design, Development, Test and Evaluation (Ddt&e), Production, and Sustaining Engineering Efforts Include Activities Performed by Three Organizations; the NASA Design Team (Ndt), the Upper Stage Production Contractor (Uspc) and the Instrument Unit Production Contractor (Iupc). for Clarity, the Uspc Will Be Referred to As the Contractor Throughout This Document. NASA Is Responsible for the Integration of the Primary Elements of the Ares I Launch Vehicle Including: the First Stage, US Including Instrument Unit (Iu), and US Engine; and Will Also Integrate the Ares I Launch Vehicle at the Launch Site. NASA Is Responsible for the Ddt&e, Including Technical and Programmatic Integration of the US Subsystems and Government-furnished Property. NASA Will Lead the Effort to Develop the Requirements and Specifications of the US Element, the Development Plan and Testing Requirements, and All Design Documentation, Initial Manufacturing and Assembly Process Planning, Logistics Planning, and Operations Support Planning. Development, Qualification, and Acceptance Testing Will Be Conducted by NASA and the Contractor to Satisfy Requirements and for Risk Mitigation. NASA Is Responsible for the Overall Upper Stage Verification and Validation Process and Will Require Support From the Contractor. the Contractor Is Responsible for the Manufacture and Assembly of the Upper Stage Test Flight and Operational Upper Stage Units Including the Installation of Upper Stage Instrument Unit, the Government-furnished US Engine, Booster Separation Motors, and Other Government-furnished Property. A Description of the NASA Managed and Performed Efforts Is Contained in the US Work Packages and Will Be Made Available to the Contractor to Ensure Their Understanding of the Roles and Responsibilities of the Ndt, Iupc, and Contractor During the Design, Development, and Operation of the US Element. the US Conceptual Design Described in the USO-CLV-SE-25704 US Design Definition Document (Ddd) Is the Baseline Design for This Contract. the Contractors Early Role Will Be to Provide Producibility Engineering Support to NASA Via the Established US Office Structure and to Provide Inputs Into the Final Design Configuration, Specifications, and Standards. NASA Will Transition the Manufacturing and Assembly, Logistics Support Infrastructure, Configuration Management, and the Sustaining Engineering Functions to the Contractor at the Key Points During the Development and Implementation of the Program Currently Planned to Occur No Later Than 90 Days After the Completion of the Following Major Milestones: Manufacturing and Assembly US Preliminary Design Review (Pdr) Logistics Support Infrastructure US Pdr Configuration Management US Critical Design Review Cdr) Sustaining Engineering US Design Certification Review (Dcr) After the Completion of An Orderly Transition of Roles and Responsibilities to the Contractor, NASA Will Assume An Insight Role Into the Contractors Production, Sustaining Engineering, and Operations Support of the Ares I US Test Program and Flight Hardware. After Dcr, the Contractor Will Be Responsible for Sustaining Engineering Per Sow Section 4.7, As Necessary to Maintain and Support the US Configuration and for Production and Operations Support.NASA · USAspending ↗
    $10.51BOct 16, 2007
  • International Space StationNASA · USAspending ↗
    $9.51BOct 23, 2007
  • W58RGZ-16-C-0023 Is for the Award of Advance Procurement in the Amount of $184,930,000.00 to Support Lot 7 Full Rate Production Long Lead Items.U.S. Army · USAspending ↗
    $7.47BMar 21, 2016
  • $7.25BDec 5, 2008
  • F-15, FMS, F-15QA Air Vehicle DevelopmentU.S. Air Force · USAspending ↗
    $7.04BDec 22, 2017
  • 200512!010860!2100!W56HZV!TACOM - Warren !W56HZV05C0724 !A!n! !Y! ! !20050923!20141231!016544780!016544780!009256819!N!THE Boeing Company !J S Mcdonnell Blvd !Saint Louis !MO!63166!65000!510!29!ST. Louis !St. Louis (City) !Missouri !+000219245691!N!N!000000000000!AZ15!RDTE/OTHER Research&development-eng/manuf Devel !S1 !Services !301 !Fcs !541330!E! !1! ! ! ! ! !20200930!B! ! !A! !D!U!U!1!001!N!1A!Z!Y!Z! ! !N!c!n! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! ! TAS::21 2040::TASU.S. Army · FCS · USAspending ↗
    $7.02BOct 3, 2007
  • The Missile Defense Agency (MDA), Ground-based Midcourse Defense (Gmd) Development and Sustainment Contract (Dsc) the Gmd Dsc Work Includes, But Is Not Limited To: 1) Future Development; 2) Fielding; 3) Test; 4) Systems Engineering, Integration and Configuration Management; 5) Equipment Manufacturing and Refurbishment; 6) Training; and 7) Operations and Sustainment Support for the Gmd Weapon System and Associated Support Facilities.Missile Defense Agency · MDA SUPPORT · USAspending ↗
    $6.47BDec 30, 2011
  • Billing Schedule for FY07 Flying Hours/engine Cycles AdjustmentU.S. Air Force · C-17A · USAspending ↗
    $5.97BOct 1, 2007
  • Canada and Germany Lot 13 P-8A AircraftU.S. Navy · P-8A Poseidon · USAspending ↗
    $5.77BFeb 29, 2024
  • P-8A LRIP I Long Lead MaterialU.S. Navy · P-8A Poseidon · USAspending ↗
    $5.70BApr 13, 2009
  • 200411!000011!1700!AA4M0 !Naval Air Systems Command !N0001904C0014 !A!n! !N! ! !20031229!20110930!149879157!006265946!009256819!N!MCDONNELL Douglas Corporation !J S Mcdonnell Blvd !Saint Louis !MO!63166!65000!510!29!ST. Louis !St. Louis (City) !Missouri !+000166491870!N!Y!008662099934!1510!AIRCRAFT Fixed Wing !A1A!AIRFRAMES and Spares !549 !F/A-18 E/f !336411!E! !3!C!S! ! ! !99990909!B! ! !A! !D!U!K!1!001!N!1A!A!W!F! ! !N!c!n! ! ! !Z!Z!A!A!000!A!B!N! ! ! !Y! ! !0001! !U.S. Navy · F/A-18E/F Super Hornet · USAspending ↗
    $5.57BOct 4, 2007
  • P-8A FRP Lot I Long Lead MaterialU.S. Navy · POSEIDON · USAspending ↗
    $5.54BAug 31, 2012
  • F/A-18E AircraftU.S. Navy · USAspending ↗
    $5.50BMay 8, 2018
  • Incremental Funding Action.U.S. Navy · P-8A Poseidon · USAspending ↗
    $5.22BOct 16, 2007
  • CH-47F Cargo Helicopter Multiyear II. 34 New Build Helicopters and 121 Renew Helicopters.U.S. Army · CH-47F · USAspending ↗
    $4.86BJun 10, 2013
  • 200112!000108!9700!ZD60 !Ballistic Missile Defense Org. !HQ000601C0001 !A!n!*!n! !20001222!20080930!848025649!848025649!009256819!N!THE Boeing Company !3370 E Miraloma Ave !Anaheim !CA!92806!37000!089!01!HUNTSVILLE !Madison !Alabama !+000383571022!N!N!000000000000!AD93!RDTE/OTHER Defense-adv Tech Dev !S1 !Services !1CAA!BALLISTIC Missile Defense Sys !541710!*!*!3! ! ! !*!*!*!B!*!*!a! !A !U!R!2!001!B! !Z!y!z! ! !N!c!n! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001!Missile Defense Agency · MDA SUPPORT · USAspending ↗
    $4.83BOct 31, 2007
  • Gbi/aur Program Management/systems EngMissile Defense Agency · MDA SUPPORT · USAspending ↗
    $4.44BMar 18, 2019
  • CH-47F Multi-year Contract for New Build and Remanufacture AircraftsU.S. Army · CH-47D · USAspending ↗
    $4.38BAug 26, 2008
  • Acat I, Aflcmc/wljk, Presidential Aircraft RecapitalizationU.S. Air Force · USAspending ↗
    $4.04BJan 29, 2016
  • F-15EX Lot 5 Advanced ProcurementU.S. Air Force · USAspending ↗
    $3.93BSep 28, 2023
  • This Order Provides Support and Sustainment Services to the Government Product Support Manager (Psm)/ Product Support Integrator (Psi) for the C-17 Weapon System. Support Shall Include Program Management; Logistics Data, Sustainment Engineering; Quality Assurance; Material and Equipment Management; Aircraft Depot Maintenance and Modification; International Partnership Support; Field Services, F117 Propulsion Maintenance and Management, Long-term Sustainment (Lts) Planning; and Air Logistics Center Partnering Support for the Worldwide Fleet of the C-17 Aircraft Through the Virtual Fleet Concept.U.S. Air Force · C-17A · USAspending ↗
    $3.68BOct 1, 2011
  • Apache Advanced Procurement Award for Lot 12 Full Rate Production.U.S. Army · USAspending ↗
    $3.48BJun 18, 2021
  • $3.15BJun 30, 2014
  • Wgs Block II Follow onU.S. Air Force · WGS · USAspending ↗
    $3.13BAug 19, 2010
  • IGF::OT::IGF F-15S/SA ConversionU.S. Air Force · F-15 · USAspending ↗
    $2.81BJun 22, 2012
  • Space Launch System (Sls) Stages Production and Evolution Contract (Spec)NASA · USAspending ↗
    $2.75BOct 16, 2019
  • E-7A Rapid PrototypingU.S. Air Force · E-7A RP · USAspending ↗
    $2.73BFeb 28, 2023
  • Lot 40 F/A-18E and EA-18G Aircraft with Aea KitsU.S. Navy · EA-18G Growler · USAspending ↗
    $2.44BFeb 27, 2017
  • Production of C-17 AircraftU.S. Air Force · C-17A · USAspending ↗
    $2.33BFeb 6, 2009
  • Apache New Build Attack Helicopters (AH)-64E for Foreign Military Sale Customers Poland (Qty of 96), Egypt (Qty of 2) and Kuwait (Qty of 8). This Includes Associated Components and Accessories and Longbow Crew Trainers (Lcts)U.S. Army · USAspending ↗
    $2.30BNov 25, 2025
  • Aircraft SustainmentU.S. Air Force · C-17A · USAspending ↗
    $2.29BOct 1, 2012
  • UCA FOR10 India C-17 AircraftU.S. Air Force · C-17A · USAspending ↗
    $2.14BFeb 1, 2012
  • Slam Er Obsolescence Redesign - Nre and Production of Slam Er MissilesU.S. Navy · USAspending ↗
    $2.06BMay 13, 2020
  • F-15EX - Lot 4 Advanced ProcurementU.S. Air Force · USAspending ↗
    $2.05BSep 29, 2022
  • 200607!002414!2100!W58RGZ!USA Aviation and Missile COMMAND!W58RGZ06C0093 !A!n! !N! ! !20060331!20061031!047800297!006265946!009256819!N!MCDONNELL Douglas Helicopter C!5000 E Mcdowell Rd !Mesa !AZ!85215!46000!013!04!MESA !Maricopa !Arizona !+000038687459!N!N!000000000000!1520!AIRCRAFT Rotary Wing !S1 !Services !000 !Not Discernable !336411!E! !3! ! ! ! ! !99990909!B! ! !N!Z!A!N!J!2!002!N!1G!A!Y!Z! ! !N!c!n! ! ! !A!A!A!A!000!A!A!N! ! ! ! ! ! !0001! !U.S. Army · USAspending ↗
    $1.87BOct 5, 2007
  • $1.84BAug 30, 2018
  • FY10 UCA for 5 USAF A/cU.S. Air Force · C-17A · USAspending ↗
    $1.66BMay 13, 2011
  • Harpoon Coastal Defense System for Launcher Transporter Units (Ltus), Radar Units (Rus) and Training Equipment.U.S. Navy · USAspending ↗
    $1.55BMar 2, 2022
  • 28 Kuwait KAF-18E/F Aircraft and 56 Commercial Pxmc CardsU.S. Navy · USAspending ↗
    $1.52BJun 27, 2018
  • Advanced Procurement Funding for Long Lead ItemsU.S. Army · AH-64E Apache · USAspending ↗
    $1.49BApr 24, 2014
  • KC-46 FMS Effort for Israel Aircraft 5&6 and Japan Aircraft 7-10.U.S. Air Force · KC-46A Tanker Modernization Program · USAspending ↗
    $1.48BFeb 27, 2026
  • B-52 Commercial Engine Replacement Program (Cerp) Rapid Prototyping 1 (RP1)U.S. Air Force · USAspending ↗
    $1.45BFeb 14, 2020
  • F-15; Acat II: RMP/V3 Combined Radar Buy FY15U.S. Air Force · USAspending ↗
    $1.40BOct 30, 2015
  • UH-1N Replacement Helicopter SystemU.S. Air Force · MH-139A · USAspending ↗
    $1.40BSep 24, 2018
  • F-15/NO Acat/japan/undefinitized Contract ActionU.S. Air Force · USAspending ↗
    $1.34BDec 30, 2021
  • Interim Cryogenic Propulsion Stage for SlsNASA · USAspending ↗
    $1.34BSep 28, 2012
  • Letter Contract to BoeingMissile Defense Agency · MDA SUPPORT · USAspending ↗
    $1.33BDec 30, 2008
  • Advance Procurement for Lots 3 and 4 of Apache Block III Full Rate ProductionU.S. Army · AH-64E NEW BUILD · USAspending ↗
    $1.30BJun 29, 2012
  • Migrated Data Value UnknownU.S. Air Force · C-17A · USAspending ↗
    $1.27BJun 22, 2010
  • F-15 Israel ProgramU.S. Air Force · USAspending ↗
    $1.17BDec 29, 2025
  • IGF::OT::IGF VC-25 Contractor Logistics Support.U.S. Air Force · USAspending ↗
    $1.17BNov 30, 2015
  • FY24 C-17 Virtual Fleet Material RequirementsU.S. Air Force · USAspending ↗
    $1.16BOct 1, 2023
  • This Contract Is to Design, Develop, Fabricate, Integrate, Test, Ship, Provide Launch Support, Conduct On-orbit Checkout Operations and Provide Sustaining Engineering Support for Two Tracking Data Relay Satellite (Tdrs) Spacecraft. the Contract Requirements Also Include the Design, Assemble, Test, Install and Verification of Modifications to the White Sands Complex Necessary to Make the Ground Terminals Fully Compatible with the Tdrs K Program Spacecraft Design. the Contract Also Includes Options for Two Additional Spacecraft.NASA · USAspending ↗
    $1.14BDec 28, 2007
  • Non-recurring Engineering and Aae Items in Support of Kuwait Variant of F/A-18 Super HornetU.S. Navy · USAspending ↗
    $1.13BMar 30, 2018
  • F15EX Lot 2 Long Lead-itemsU.S. Air Force · USAspending ↗
    $1.12BJul 28, 2021
  • 200303!000013!5700!GV44 !Esc/mck !F1962802C0048 !A!n! !N!P00001 !20021105!20080930!848025649!848025649!009256819!N!THE Boeing Company !3370 E Miraloma Ave !Anaheim !CA!92806!02000!059!06!ANAHEIM !Orange !CALIFORNIA!+000009300000!N!N!000000000000!AC25!RDTE/MISSILE and Space Systems-eng/manuf Devel !A1A!AIRFRAMES and Spares !3000!NOT Discernable or Classified !334220!E! !3! ! !C! ! !99990909!B! ! !A! !A!U!R!2!002!B! !Z!y!z! ! !N!c!n! ! ! !Z!Z!A!A!000!A!D!N! ! ! !Y! ! !0001! !U.S. Air Force · USAspending ↗
    $1.08BOct 15, 2007
  • F15EX Lot 1A and Lot 1 NreU.S. Air Force · USAspending ↗
    $1.07BJul 13, 2020
  • F-15EX Lot 3 Long-lead ItemsU.S. Air Force · USAspending ↗
    $1.06BSep 29, 2021
  • Joint Direct Attack Munition (Jdam) Award of Lot 22 Delivery Order for USAF and USN.U.S. Air Force · JDAM · USAspending ↗
    $1.00BMar 30, 2018
  • CH-47F Block II Aircraft with Air to Air Refueling Inclusive of All Service, Material, Production, and Manufacturing for Germany, Gy-b-xbtU.S. Army · CH-47F BLOCK II · USAspending ↗
    $995MOct 27, 2025
  • Time Critical Parts (Tcp) in Support of EA-18G FRP (Lot 33) Aea KitsU.S. Navy · EA-18G Growler · USAspending ↗
    $994MDec 23, 2008
  • Lot 91 Production Long Lead ItemsU.S. Navy · USAspending ↗
    $991MOct 30, 2018
  • Block III Low Rate Initial ProductionU.S. Army · APACHE (AH-64A) · USAspending ↗
    $988MJul 30, 2009
  • F-15 Eagle Passive/active Warning & Survivability System (Epawss) Low Rate Ininitial Production (LRIP)U.S. Air Force · USAspending ↗
    $938MDec 16, 2020
  • Advanced Pilot TrainingU.S. Air Force · USAspending ↗
    $930MSep 27, 2018
  • C-17 Globemaster III (G3) SustainmentU.S. Air Force · USAspending ↗
    $929MOct 31, 2025
  • 200209!003576!2100!AB07 !USA Communications-electronics !DAAB0702CC403 !A!n! !N! !20020624!20080131!008369050!008369050!009256819!N!THE Boeing Company !3370 E Miraloma Ave !Anaheim !CA!92806!02000!059!06!ANAHEIM !Orange !CALIFORNIA!+000073666000!N!N!000000000000!R414!SYSTEMS Engineering Services !A7 !Electronics and Communication !1000!NOT Discernable or Classified !334220!E! !3! ! ! ! ! !99990909!B! ! !A! !A!N!R!2!002!B! !Z!y!z! ! !N!c!n! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001!U.S. Army · USAspending ↗
    $926MOct 3, 2007
  • Joint Direct Attack Munition (Jdam) Guidance Sets 1325-01-642-8154 1325-01-642-8158 1325-01-642-8155 1325-01-642-8156 Award Lot 20 Delivery Order USAF and USN RequirementsU.S. Air Force · JDAM · USAspending ↗
    $923MFeb 28, 2017
  • Thirty-six (36)NEW Block III Apache Helicopter AH-64E Model for the Republic of Korea (Rok)to Include Integrated Logistics Support (Ils) and Spares, and One (1) Longbow Crew Trainer (Lct), Spares and SupportU.S. Army · AH-64E Apache · USAspending ↗
    $904MAug 23, 2013
  • Joint Direct Attack Munition (Jdam) Tail Kits.U.S. Air Force · JDAM · USAspending ↗
    $878MJun 17, 2019
  • $867MAug 31, 2022
  • F-15 Korea K+ FMSU.S. Air Force · USAspending ↗
    $854MJan 29, 2026
  • B-52 Radar Modernization Program Engineering and Manufacturing DevelopmentU.S. Air Force · USAspending ↗
    $829MJun 14, 2021
  • FY08 Incremental FundingU.S. Army · USAspending ↗
    $812MOct 12, 2007
  • CH-47F Aircraft ProcurementU.S. Army · CH-47F BLOCK II · USAspending ↗
    $794MJul 12, 2023
  • C-17 Globemaster III - Total Sustainment and Minor DevelopmentU.S. Air Force · USAspending ↗
    $790MApr 1, 2025
  • Evolved Strategic Satellite Communication (Ess) Space Development and ProductionU.S. Air Force · USAspending ↗
    $787MJul 3, 2025
  • Acat I F-15 Aircraft Engineering and Manufacturing Development (EMD) for the Integrated Electronic Warfare Suite A.k.a Eagle Passive Active Warning Survivability System (Epawss)U.S. Air Force · USAspending ↗
    $783MNov 3, 2016
  • H-47 Extended Range FMS ProductionU.S. Special Operations Command · USAspending ↗
    $780MFeb 15, 2022
  • FMS Saudi Arabia 36 Apache Block III Aircraft and Related SupportU.S. Army · APACHE (AH-64A) · USAspending ↗
    $778MApr 30, 2012
  • Block 40/45 Full Rate Production Jbp Phase 3U.S. Air Force · AWACS RSIP (E-3) · USAspending ↗
    $759MNov 17, 2011
  • Long Lead Contract for 30 AH-64D Aircraft for the Government of TaiwanU.S. Army · AH-64E Apache · USAspending ↗
    $752MJul 30, 2009
  • 199809!5700!0214!GD90 !Oc-alc/lkd (Cls Aircraft) !F3460198C0125 !A!*!* !19980629!19990930!006265946!006265946!009256819!N!0PXV4!MCDONNELL Douglas Corporation !Lambert St Louis Airport !Saint Louis !MO!63103!31276!189!29!HAZELWOOD !St. Louis !Missouri !0001!+000000119687!Y!N!000000000000!R408!PROGRAM Management/support Services !A1A!AIRFRAMES and Spares !3ADB!C-10 !3728!3!*!*!*!B!A!*!A !N!J!2!002!B!* !C!n!z!* !* !Y!c!*!c!c!a!a!a!*!* !*!N!a!c!n!*!*!*!*!*!U.S. Air Force · USAspending ↗
    $750MOct 11, 2007
  • Maintenance Support - CY09Missile Defense Agency · MDA SUPPORT · USAspending ↗
    $730MFeb 2, 2009
  • MH-47G Blkii Lot 6 Long Lead ProductionU.S. Special Operations Command · USAspending ↗
    $728MJul 14, 2022
  • 200610!000055!5700!FA8808!SMC/MLK !FA880806C0001 !A!n! !N! ! !20060217!20070731!928989730!928989730!009256819!N!BOEING Satellite Systems, Inc !2260 E Imperial Hwy !El Segundo !CA!90245!22412!037!06!EL Segundo !Los Angeles !CALIFORNIA!+000100582900!N!N!000148195269!1820!SPACE Vehicle Components !A2 !Missile and Space Systems !326 !Wideband Gapfiller !334220!E! !1! ! ! ! ! !99990909!B! ! !A! !D!U!L!1!001!N!1G!A!Y!F! ! !N!c!n! ! ! !Z!Z!A!A!000!A!C!N! ! ! !Y! ! !0001! !U.S. Air Force · WGS · USAspending ↗
    $727MOct 24, 2007
  • FY23 C-17 Virtual Fleet Material RequirementsU.S. Air Force · USAspending ↗
    $720MOct 1, 2022
  • F22 C-17 MaterialU.S. Air Force · USAspending ↗
    $717MOct 1, 2021
  • Joint Direct Attack Munition (Jdam)U.S. Air Force · USAspending ↗
    $698MMar 25, 2020
  • Manufacture of Horizontal Stabliziers, Left, Right and Center for the Kc -135 Aircraft.Defense Logistics Agency · USAspending ↗
    $672MSep 25, 2025
  • C-17 Sustainment ServicesU.S. Air Force · USAspending ↗
    $663MOct 1, 2020
  • Follow-on VC-25AU.S. Air Force · USAspending ↗
    $662MSep 1, 2009
  • Joint Direct Attack Munition (Jdam) 1325-01-642-XXXX Lot 20 Delivery Order AwardU.S. Air Force · JDAM · USAspending ↗
    $658MMar 31, 2016
  • $636MOct 4, 2007
  • Apache Performance Based Logistics(pbl) IV Services of Airframe Components for the United States Government's AH-64 Apache FleetU.S. Army · AH-64E Apache · USAspending ↗
    $632MApr 26, 2019
  • Engineering Services-travel ClinsU.S. Air Force · B-1B CMUP · USAspending ↗
    $625MApr 27, 2009