Program · United States · U.S. Navy
EA-18G Growler
Carrier-based electronic attack aircraft.
The profile’s obligated figure counts resolved program awards from reported acquisition codes and reviewed links, with shared awards excluded; the tracker counts catalog fiscal years of resolved reviewed award links, so the figures can differ. The budget tracker separates requested, enacted, announced ceiling and obligated amounts for FY2025–FY2027: EA-18G Growler figures cover R-1 program elements 0604269N. No P-1 procurement line is included. The shared F/A-18E/F and EA-18G modernization header is excluded. Obligations are only the USAspending awards carrying reviewed DoW acquisition program code 378 (EA-18G). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.
About
The EA-18G Growler is the Navy's carrier-based airborne electronic-attack aircraft, combining the F/A-18F Super Hornet airframe with receivers, jamming systems and communications countermeasures. Built by Boeing to replace the EA-6B Prowler, it supports suppression of adversary air defenses and broader electronic warfare. Its equipment includes the ALQ-218 receiver, ALQ-99 jamming pods and APG-79 active electronically scanned array radar.
News8
- Sep 29, 2026NewsThe War ZoneNavy Identifies EA-18G Growler As Type Involved In Mishap Aboard USS Dwight D. Eisenhower Last Night
- Sep 22, 2020Government record (high significance)Department of DefenseContracts For Sep. 22, 2020
- Aug 18, 2020News (high significance)USNI NewsNavy Quietly Starts Development of Next-Generation Carrier Fighter - USNI News
- Mar 26, 2020News (high significance)Defense NewsGermany reportedly moving toward a split buy of Super Hornets, Growlers and Eurofighter Typhoons to replace Tornado jets
- Oct 26, 2018News (high significance)USNI NewsGAO Denies Raytheon Next Generation Jammer Protest; Navy Signs Contracts with L3, Northrop - USNI News
- Apr 21, 2014NewsUSNI NewsStealth Vs. Electronic Attack
- Apr 7, 2014NewsUSNI NewsNavy Preparing for More Aggressive Growler Operations
- Mar 14, 2013NewsDefense SystemsNavy awards contract for F/A-18 computers to General Dynamics
Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Totals · 1 | ||
| Development program totalHistorical RDT&E estimate; nominal dollars across the program. | $2.419BThen-year $ | EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR |
| Unit costs · 1 | ||
| Average procurement / aircraftSource scope excludes a current foreign support package. | $82.682MThen-year $ | EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR |
| Quantities · 2 | ||
| GAO cost-study fleetHistorical study population; not a current inventory. | 138U.S. only | Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018 |
| Procurement program quantityHistorical acquisition denominator, not current aircraft available. | 160U.S. only | EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR |
| Operating costs · 2 | ||
| Annual O&S / aircraftHistorical average for the source study population; not a marginal mission cost. | $6.55M / yrConstant FY2018 $ | Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018 |
| Reimbursement / flight hourPublished billing rate for use by another DoD component. It is not the fully burdened cost of ownership. | $19,296 / hrNominal $; Other DoD Component | FY2026 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2026 |
Totals · 1
- Development program totalHistorical RDT&E estimate; nominal dollars across the program.EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR$2.419BThen-year $
Unit costs · 1
- Average procurement / aircraftSource scope excludes a current foreign support package.EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR$82.682MThen-year $
Quantities · 2
- GAO cost-study fleetHistorical study population; not a current inventory.Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018138U.S. only
- Procurement program quantityHistorical acquisition denominator, not current aircraft available.EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR160U.S. only
Operating costs · 2
- Annual O&S / aircraftHistorical average for the source study population; not a marginal mission cost.Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018$6.55M / yrConstant FY2018 $
- Reimbursement / flight hourPublished billing rate for use by another DoD component. It is not the fully burdened cost of ownership.FY2026 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2026$19,296 / hrNominal $; Other DoD Component
Earlier observations · 5
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| Unit costs · 3 | ||
| Average procurement / aircraftHistorical program baseline. | $74.6MThen-year $ | EA-18G December 2015 SAR Department of Defense · figure Dec 2003 baseline |
| Average procurement / aircraftPrevious annual estimate. | $81.672MThen-year $ | EA-18G December 2015 SAR Department of Defense · figure Dec 2014 SAR |
| Average procurement / aircraftSource scope excludes a current foreign support package. | $82.682MThen-year $ | EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR |
| Operating costs · 2 | ||
| Annual O&S / aircraft1 | $6.23M / yrConstant FY2018 $ | Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2011 |
| Annual O&S / aircraft1 | $6.55M / yrConstant FY2018 $ | Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018 |
Unit costs · 3
- Average procurement / aircraftHistorical program baseline.EA-18G December 2015 SAR Department of Defense · figure Dec 2003 baseline$74.6MThen-year $
- Average procurement / aircraftPrevious annual estimate.EA-18G December 2015 SAR Department of Defense · figure Dec 2014 SAR$81.672MThen-year $
- Average procurement / aircraftSource scope excludes a current foreign support package.EA-18G December 2015 SAR Department of Defense · figure Dec 2015 SAR$82.682MThen-year $
Operating costs · 2
- Annual O&S / aircraft1Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2011$6.23M / yrConstant FY2018 $
- Annual O&S / aircraft1Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018$6.55M / yrConstant FY2018 $
1Historical average for the source study population; not a marginal mission cost.
Dedicated electronic-attack program
Growler procurement and R&D are reported as a separate program. The Super Hornet’s airframe relationship does not make its acquisition or operating cost interchangeable with EA-18G figures.
Contracts & purchasing · 1
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Stated amount | Qty | Source |
|---|---|---|---|---|
| U.S. Navy / Australia → BoeingInitial 33 aircraft plus 15 added in October 2015; includes electronic-attack kits, obsolescence work and Australian hardware/support. Ceiling $2,635.3M. | Current target at December 2015 SAR | $2.568B | 48 | EA-18G December 2015 SAR Department of Defense · figure Jun 30, 2014 |
International buyers · 1
| Country | Qty | Status | Source |
|---|---|---|---|
| AustraliaTwelve aircraft within the original 33-aircraft mixed U.S./Australian award; subsequent losses or replacement orders not inferred. | 12 | Historical acquisition agreement | EA-18G December 2015 SAR Department of Defense · figure Jun 30, 2014 |
Open research: Figures retain the date and scope of the original source. A historical count, cumulative delivery or procurement plan is not today’s mission-capable inventory.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
Contracts$14.35B obligated on code-mapped awards
- Code-mapped awards are every contract award in the USAspending baseline (DoD, DHS, DOE and NASA, FY2008–FY2027) whose latest reported acquisition program code is this program's, whichever company received it; vehicles (IDVs) are excluded.
By fiscal year19
| Fiscal year | Obligated | Actions |
|---|---|---|
| FY2008 | $349M obligated | 35 |
| FY2009 | $151M obligated | 64 |
| FY2010 | $479M obligated | 36 |
| FY2011 | $203M obligated | 94 |
| FY2012 | $249M obligated | 64 |
| FY2013 | $334M obligated | 72 |
| FY2014 | $119M obligated | 88 |
| FY2015 | $290M obligated | 136 |
| FY2016 | $338M obligated | 153 |
| FY2017 | $2.39B obligated | 209 |
| FY2018 | $1.64B obligated | 267 |
| FY2019 | $1.28B obligated | 242 |
| FY2020 | $1.07B obligated | 235 |
| FY2021 | $1.13B obligated | 183 |
| FY2022 | $786M obligated | 150 |
| FY2023 | $1.08B obligated | 180 |
| FY2024 | $355M obligated | 184 |
| FY2025 | $1.67B obligated | 192 |
| FY2026 | $443M obligated | 123 |
Contractors25
- Boeing$5.70B obligated 40%
- RTX$4.70B obligated 33%
- GE Aerospace$1.77B obligated 12%
- Lockheed Martin$664M obligated 4.6%
- L3Harris Technologies$467M obligated 3.3%
- Mercury Systems$191M obligated 1.3%
- Northrop Grumman$172M obligated 1.2%
- V2X$148M obligated 1.0%
- The Marvin Group$145M obligated 1.0%
- Honeywell International$129M obligated 0.9%
- BAE Systems$78.7M obligated 0.5%
- Parker-Hannifin$45.1M obligated 0.3%
- Other companies (13)$77.7M obligated 0.5%
- Recipients without a DefDex profile (267 awards)$65.2M obligated 0.5%
Reported acquisition program code 378; program scope may be incomplete or miscoded · 562 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.
Participants4
Prime
4- BoeingConfirmed

In November 2009 Boeing, acting as weapon system integrator and prime contractor, led the EA-18G Growler industry team that also included Northrop Grumman, Raytheon and General Electric Aircraft Engines.
Source: boeing.mediaroom.com
- GE AerospaceConfirmed

In September 2026 the Pentagon awarded GE Aerospace a contract worth up to nearly $2.9 billion to supply parts for the F414 engine that powers the Navy's F/A-18 Super Hornet and EA-18G Growler.
Source: breakingdefense.com
The Naval Air Systems Command awarded Northrop Grumman Mission Systems a $61 million contract for production and delivery of upgrade components for the AN/ALQ-218 tactical jamming receiver installed on the EA-18G Growler.
Source: defence-blog.com
- RTXConfirmed

In August 2026 Raytheon completed a $50 million Forest, Mississippi expansion; the new space was to build Next Generation Jammer Mid-Band systems for the U.S. Navy and Royal Australian Air Force.
Source: www.wlbt.com
Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.
Where It Is Built3
| Site | Role | Location | Work | Source | Confidence |
|---|---|---|---|---|---|
| Northrop Grumman El Segundo assembly lineNorthrop Grumman | Component production | Factory · El Segundo, California | In June 2006 Northrop Grumman began assembling the first production center and aft fuselage for the EA-18G on its F/A-18 Super Hornet production line in El Segundo, California, where a major portion of the EA-18G is built. | investor.northropgrumman.com investor.northropgrumman.com | — |
| Raytheon Forest manufacturing facilityRTX | Component production | Factory · Forest, Mississippi | In August 2026 Raytheon’s Forest manufacturing site covered 445,000 square feet after an expansion; the new space was to serve as a hub for NGJ Mid-Band pod production, testing and integration. | www.wapt.com www.wapt.com | — |
| Boeing St. Louis production facilityBoeing | Other | Factory · St. Louis, Missouri | In 2017 Boeing St. Louis delivered its 150th EA-18G Growler to Air Test and Evaluation Squadron Three One (VX-31). | www.dcma.mil www.dcma.mil | — |
- Component production
- Component production
Plants, shipyards, final-assembly lines, test sites and depots that build or sustain the program, and the work done at each.
Who Operates It2
| Country | Service | Relationship | Quantity | Note | Source | Confidence |
|---|---|---|---|---|---|---|
| Australia | Royal Australian Air Force | Operator | 12 units in service | The Royal Australian Air Force fleet of 12 Growlers operates alongside air, land and sea forces. | www.boeing.com.au www.boeing.com.au | — |
| United States | Navy | Operator | No count statedas of 2017 | In 2017 Boeing St. Louis delivered its 150th EA-18G Growler, to the Navy's Air Test and Evaluation Squadron Three One (VX-31). | www.dcma.mil www.dcma.mil | — |
- AustraliaOperator
- United StatesOperator
Countries and services that operate or have bought the product. A quantity is the count a source states, labelled delivered, in service, ordered, planned or authorized with the year it is stated for; an ordered, planned or authorized count is not a delivery.
Budget Lines
- APN P-1 line 22
Budget line items recorded for this program.

