Budget tracker
EA-18G Growler
EA-18G Growler figures from run 242 cover R-1 program elements 0604269N. No P-1 procurement line is included. The shared F/A-18E/F and EA-18G modernization header is excluded. Obligations are only the USAspending awards carrying reviewed DoD acquisition program code 378 (EA-18G). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.
By Fiscal Year
FY2025
- Requested
- Not yet researched
- Enacted
- $167M$167,450,000
Appropriation
- RDT&E · 0604269N · Appropriation · $167M
- Announced ceiling (not spending)
- Announced ceiling: Not yet researched
- Obligated
- $1.61B$1,612,104,628.62
47 linked awards, 143 actions
FY2026
- Requested
- $185M$184,921,000
President's budget
- RDT&E · 0604269N · Discretionary · President's budget · $185M
- Enacted
- $185M$184,921,000
Appropriation
- RDT&E · 0604269N · Discretionary · Appropriation · $185M
- Announced ceiling (not spending)
- Announced ceiling: Not yet researched
- Obligated
- $389M$388,535,617.19
37 linked awards, 102 actions · partial year
FY2027
- Requested
- $132M$131,683,000
President's budget
- RDT&E · 0604269N · Discretionary · President's budget · $132M
- Enacted
- Not yet researched
- Announced ceiling (not spending)
- Announced ceiling: Not yet researched
- Obligated
- No actions recorded on published linked awards yet
Each column is a different measure and they are not added together. A request and an enacted amount for the same year sit side by side; the request is never rewritten when an enacted amount arrives. A blank state names why there is no amount; only a stated amount, including a stated $0, shows dollars.
Sources and Evidence4
FY2025 · Enacted (Appropriation)
RDT&E · 0604269N
$167,450,000as printed 167,450 ($ thousands)FY 2026 Research, Development, Test & Evaluation Programs (R-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2025 EnactedExhibit R-1, 1319N Research, Development, Test and Evaluation, Navy, line 123 EA-18, PDF page 32. Dollars in thousands. Column 'FY 2025 Enacted'.123 0604269N EA-18 05 U 159,787 167,450 167,450 184,921 184,921
FY2026 · Requested (President's budget)
RDT&E · 0604269N · Discretionary
$184,921,000as printed 184,921 ($ thousands)FY 2026 Research, Development, Test & Evaluation Programs (R-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2026 Disc RequestExhibit R-1, 1319N Research, Development, Test and Evaluation, Navy, line 123 EA-18, PDF page 32. Dollars in thousands. Column 'FY 2026 Disc Request'.123 0604269N EA-18 05 U 159,787 167,450 167,450 184,921 184,921
FY2026 · Enacted (Appropriation)
RDT&E · 0604269N · Discretionary
$184,921,000as printed 184,921 ($ thousands)RDT&E Programs (R-1), Department of War Budget, Fiscal Year 2027 Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2026 Discretionary EnactedExhibit R-1, 1319N Research, Development, Test and Evaluation, Navy, line 121 EA-18, PDF page 32. Dollars in thousands. Column 'FY 2026 Discretionary Enacted'.121 0604269N EA-18 05 U 164,122 184,921 184,921 131,683 131,683
FY2027 · Requested (President's budget)
RDT&E · 0604269N · Discretionary
$131,683,000as printed 131,683 ($ thousands)RDT&E Programs (R-1), Department of War Budget, Fiscal Year 2027 Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2027 Discretionary RequestExhibit R-1, 1319N Research, Development, Test and Evaluation, Navy, line 121 EA-18, PDF page 32. Dollars in thousands. Column 'FY 2027 Discretionary Request'.121 0604269N EA-18 05 U 164,122 184,921 184,921 131,683 131,683
Every figure keeps its document, date, page or table, original unit and a short excerpt. Superseded figures stay on record. Amounts are exact; compact figures round.
Linked Awards241
- AEA DEPOT STAND-UP JOB ORDER 0001
CONT_AWD_0001_9700_N0016410GWS40_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2011: $1,900,000
- FY2012: $1,396,998
- FY2013: $0
- CCS EA-18G ENG SERVICES
CONT_AWD_0001_9700_N0016413GWS67_9700
RAYTHEON COMPANY · Award title or description names the program
CCS EA-18G ENG SERVICES
- FY2013: $304,000
- FY2014: $466,000
- FY2015: $855,000
- FY2016: $291,659
- FY2017: −$55,476.38
- FY2018: −$4,281.94
- P/N: 3399-0000-03-2
CONT_AWD_0001_9700_N0016414DWS72_9700
DRS ADVANCED ISR LLC · Program office statement
EA-18G
- FY2014: $11,698,383.01
- FY2015: $0
- FY2016: $0
- FY2017: $0
- WRA 8 TPS
CONT_AWD_0002_9700_N0016410GWS40_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2011: $4,968,101
- FY2012: $0
- TRD
CONT_AWD_0002_9700_N0016413GWS67_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2014: $4,522,000
- FY2015: $0
- FY2016: $0
- FY2018: $0
- P/N: 3399-0000-03-2
CONT_AWD_0002_9700_N0016414DWS72_9700
DRS ADVANCED ISR LLC · Program office statement
EA-18G
- FY2015: $1,845,540
- FY2017: $0
- TRADE STUDY
CONT_AWD_0003_9700_N0016410GWS31_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2011: $95,000
- DEPOT STANDUP SUPPORT-FSE SUPPORT
CONT_AWD_0003_9700_N0016410GWS40_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2012: $772,453
- FY2013: $371,408
- FY2014: $0
- TEST PROGRAM SETS AND RF ACCESSORY SET
CONT_AWD_0004_9700_N0016410GWS40_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2011: $2,850,000
- FY2012: $0
- FY2013: $0
- FY2014: $0
- FY2018: −$37,577.98
- TECHNICAL PUBLICATIONS
CONT_AWD_0005_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $44,491
- FY2017: $0
- FY2018: $0
- IGF::OT::IGF
CONT_AWD_0009_9700_N0001915G0003_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2017: $7,940,264.25
- FY2018: $288,180
- FY2019: $0
- FY2020: −$213,450.35
- FY2023: −$592,872.88
- ATFLIR MAINTAINABILITY IGF::XX,XY::IGF
CONT_AWD_0010_9700_N0001915G0003_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2017: $266,894
- AME
CONT_AWD_0011_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $17,241,111.97
- FY2017: $21,031,225.01
- FY2018: $20,834,372.02
- FY2019: $2,614,449
- FY2020: $4,190,867.85
- FY2021: $0
- FY2022: $0
- FY2023: $0
- FY2025: $0
- PHASE 2 AN/ALQ218 DEPOT STANDUP SUPPORT
CONT_AWD_0011_9700_N0016412GWS55_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2012: $1,147,133
- FY2013: $28,923
- FY2014: $0
- DEPOT STANDUP SUPPORT-12 MO POP
CONT_AWD_0012_9700_N0016412GWS55_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2012: $981,909
- FY2013: $801,516
- FY2014: $0
- FY2015: −$128,838
- FY2026: $1,598.17
- VME ASSYS FOR AN/ALQ218 V-2 EWCRFTS DEPOT STANDUP
CONT_AWD_0013_9700_N0016412GWS55_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2012: $745,892
- FY2014: $0
- FY2015: −$179,893
- AN/ALQ-218 WRA TRD'S
CONT_AWD_0014_9700_N0016412GWS55_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2012: $1,436,149
- FY2016: $0
- FY2018: −$229,902.17
- REPAIR OF 2 AN/ALQ 218 V(2) WRA'S
CONT_AWD_0015_9700_N0016412GWS55_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2013: $930,109
- FY2014: $0
- FY2015: $0
- FY2016: $140,000
- FY2017: $0
- FY2018: $0
- FY2021: −$6,465.80
- IGF::OT::IGF ENGINEERING SERVICES
CONT_AWD_0017_9700_N0016412GWS55_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2014: $1,075,000
- FY2015: $2,092,000
- FY2016: $3,656,700
- FY2017: $107,058
- FY2018: −$58,524.06
- FY2021: −$27,876.66
- LAY-IN SPARE ASSYS FOR EWCRFTS
CONT_AWD_0018_9700_N0016412GWS55_9700
NORTHROP GRUMMAN SYSTEMS CORP · Program office statement
EA-18G
- FY2014: $488,764
- FY2015: $4,620
- FY2016: $0
- THE PURPOSE OF THIS DELIVERY ORDER IS TO PROCURE SUPPLIES AND SERVICES IN ACCORDANCE WITH ENGINEERING CHANGE PROPOSAL (ECP) 6253R1C3 "DISTRIBUTED TARGETING SYSTEM - UPDATED EFFECTIVITY" AS APPROVED BY NAVAIR CONFIGURATION CONTROL BOARD (CCB) NUMBER 2015AIR0110424R1 ON 29 FEBRUARY 2016.
CONT_AWD_0021_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $120,981
- ECP 6360R1C1 RETROFIT NRE
CONT_AWD_0022_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $84,101.84
- FY2017: $0
- FY2020: $0
- FY2021: $0
- ECP 6038 R2/R3 RADOME KITS
CONT_AWD_0023_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $4,212,345.93
- ECP 6459 ACMCS
CONT_AWD_0026_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $41,420,991.14
- FY2017: $0
- FY2018: $0
- FY2019: $0
- FY2020: $0
- EA-18G CRITICAL IO PARTS
CONT_AWD_0027_9700_N0001911G0001_9700
THE BOEING COMPANY · Award title or description names the program
EA-18G CRITICAL IO PARTS
- FY2011: $218,399
- ECP 6461 "ENGINE FUEL DISPLAY (EFD) OBSOLESCENCE MITIGATION"
CONT_AWD_0029_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $1,748,249.63
- FY2017: $0
- FY2019: $0
- FY2020: −$12,973
- FY2022: $0
- RETROFIT DESIGN AND DEVELOPMENT
CONT_AWD_0031_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $118,774
- FY2021: $0
- ECP 6220C3 INCORPORATION OF MPCDR
CONT_AWD_0034_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $65,782
- FY2020: $0
- ECP 6389C1 RETROFIT KITS
CONT_AWD_0035_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $711,674.56
- FY2017: $0
- FY2018: $0
- FY2021: $0
- ECP 6380 GROUP A KITS
CONT_AWD_0039_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $852,921.05
- FY2018: $0
- RETROFIT ACMC 4022
CONT_AWD_0040_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $3,245,519.08
- FY2017: $0
- ECP 6371R1 WAT SET INCORPORATION OF ADVANCED ANTI-RADIATION GUIDED MISSILE (AARGM) FOR THE RAAF.
CONT_AWD_0041_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $252,381.98
- FY2019: $0
- FY2020: $0
- FY2021: $0
- THIS CONTRACT ACTION IS FOR THE PROCUREMENT OF AYC-1717 TITANIUM RETROFIT KITS AND RELATED TOOLING KITS FOR THE ROYAL AUSTRALIAN AIR FORCE (RAAF) IN ACCORDANCE WITH ENGINEERING CHANGE PROPOSAL (ECP) 6394R1, HORIZONTAL STABILATOR CORROSION GANG CHANNEL CORROSION PROVISIONS (RETROFIT SOLUTIONS) WITH AN OPTION FOR ADDITIONAL QUANTITIES.
CONT_AWD_0047_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $790,051
- FY2018: $0
- FY2019: $0
- RETROFIT A3 KITS
CONT_AWD_0048_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $3,329,365
- FY2020: $0
- THIS DELIVERY ORDER IS TO PROCURE RETROFIT SUPPLIES AND SERVICES IN SUPPORT OF ENGINEERING CHANGE PROPOSAL (ECP) 631 CHANGES TO THE INNER WING PANEL AS APPROVED BY NAVAIR CONFIGURATION CONTROL BOARD (CCB) NUMBER 2015AIR0110537 ON 27 AUGUST 2015.
CONT_AWD_0055_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $11,792,262
- FY2018: $0
- FY2021: $0
- FY2022: −$290,442.25
- RETROFIT, INCOMING INSPECTIONS, CONSUMABLE MATERIAL FOR "A" CONDITION EOSUS. FBO SOLICITATION #20015-14
CONT_AWD_0067_9700_N0001910G0006_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2015: $11,000,076
- FY2016: $1,267,964
- FY2017: $202,955.40
- FY2018: $0
- FY2023: −$14,494.93
- THE PURPOSE OF THIS DELIVERY ORDER IS TO PROCURE RETROFIT SERVICES AND SUPPLIES IN ACCORDANCE WITH ENGINEERING CHANGE PROPOSAL (ECP) 6440, "MAIN LANDING GEAR WHEEL ROTOR DRIVE KEY RETENTION," AS WAS APPROVED BY NAVAIR CONFIGURATION CONTROL BOARD (CCB) NUMBER 2014AIR0110400R1 ON 22 AUGUST 2014.
CONT_AWD_0099_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $175,742
- THIS UPDATED EFFECTIVITY PROPOSED UNDER ECP 6442C1 IS TASKED WITH RETROFITTING THE DTU IN RAAF LOT 38 AEA-18G AIRCRAFT.
CONT_AWD_0100_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $98,051.04
- FY2020: $0
- ECP 6038 R2/R3 RETROFIT KITS
CONT_AWD_0122_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $4,581,432.70
- FY2017: $0
- ECP-6380 CILS GROUP A KITS AND ECP 6380C1 NRE.
CONT_AWD_0127_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2013: $4,446,943.65
- FY2014: $974,838.36
- FY2016: $0
- ECP 6454 "ELIMINATION OF CONDUCTIVE PAINT ON FLIGHT CONTROL SURFACES"
CONT_AWD_0131_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $284,894
- DMD AND MPI UNITS IN SUPPORT OF THE EA-18G
CONT_AWD_0136_9700_N0001905G0026_9700
THE BOEING COMPANY · Award title or description names the program
DMD AND MPI UNITS IN SUPPORT OF THE EA-18G
- FY2009: $3,077,392
- FY2010: $1,058,695
- FY2011: $1,210,368
- ECP-6455
CONT_AWD_0143_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $670,723
- FY2020: $0
- RETROFIT NON-RECURRING
CONT_AWD_0144_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $208,191.76
- FY2017: $0
- F/A-18 E/F SUPER HORNET (USN/FMS) ECP 6348
CONT_AWD_0155_9700_N0001905G0026_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2009: $99,143.01
- FY2011: $0
- FY2012: $0
- FY2013: $0
- F/A-18 E/F ENGINEERING SERVICES - AERODYNAMICS MODELS ASSESSMENTS AND UPDATES ANALYSIS AND SUPPORT.
CONT_AWD_0177_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $202,431
- RETROFIT ILS, LSA&PROVISIONING
CONT_AWD_0205_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $44,578.84
- FY2016: $0
- FY2017: $0
- FY2018: $0
- LOT 38 ADDITIONAL EA-18G AEA WRAS
CONT_AWD_0210_9700_N0001911G0001_9700
THE BOEING COMPANY · Award title or description names the program
LOT 38 ADDITIONAL EA-18G AEA WRAS
- FY2015: $3,835,837
- FY2017: $0
- FY2018: $0
- ECP 6267R1 RETROFIT IETMS
CONT_AWD_0215_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $806,177
- FY2016: $0
- PROCUREMENT OF NON-RECURRING RETROFIT REQUIREMENTS UNDER ECP 6394R1, "HORIZONTAL STABILATOR GANG CHANNEL CORROSION PROVISIONS RETROFIT SOLUTION."
CONT_AWD_0222_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $23,360
- FY2016: $0
- ECP 570R4C3 - JHMCS
CONT_AWD_0223_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $559,155.13
- FY2016: $0
- RETROFIT ILS
CONT_AWD_0225_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $28,078
- FY2016: −$5,911
- EA-18G ECP-6360 NRE
CONT_AWD_0227_9700_N0001905G0026_9700
THE BOEING COMPANY · Award title or description names the program
EA-18G ECP-6360 NRE
- FY2010: $3,906,006
- FY2011: $3,029,086
- ECP-6380 CILS GROUP A KITS
CONT_AWD_0234_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $2,251,357.92
- AFC-613 A1 KITS
CONT_AWD_0239_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $759,134.88
- FY2016: $18,865
- ECP 6451 F/A-18C/D WINDSHIELD CONVERSION TO F/A-18E/F AND EA-18G USE
CONT_AWD_0369_9700_N0001911G0001_9700
THE BOEING COMPANY · Award title or description names the program
ECP 6451 F/A-18C/D WINDSHIELD CONVERSION TO F/A-18E/F AND EA-18G USE
- FY2015: $313,022
- FY2017: $0
- FY2018: $0
- FY2022: $0
- ECP G029 - COMMAND LAUNCH COMPUTER 7.1 TECHNICAL PUBLICATION UPDATE FOR ADVANCED ANTI-RADIATION GUIDED MISSELE
CONT_AWD_0370_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $19,355.09
- FY2017: −$8,667.83
- ECP-6342C5 RETROFIT KITS
CONT_AWD_0375_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $1,025,000
- FY2017: −$14,221
- ECP 6018 "TANK 3 BLADDER, FLOOR FOAM AND BACKING BOARD"; DRAWING UPDATES, TECHNICAL DIRECTIVES AND IETMS.
CONT_AWD_0376_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $93,907
- FY2016: $0
- FY2017: $0
- BILATERAL ORDER UNDER BOA N00019-11-G-0001 FOR PROCUREMENT OF DESIGN&DEVELOPMENT, TECHNICAL DIRECTIVE AND VALIDATION INSTALLS (2) IN ACCORDANCE WITH ECP6240R1, FT50 18K MAIN LANDING GEAR SIDEBRACE FITTING FAILURE -- REVISION FOR RETROFIT."
CONT_AWD_0377_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $569,703
- DMD A1 KITS
CONT_AWD_0379_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $1,045,650.47
- FY2016: $0
- ILS/LSA/PROVISIONING
CONT_AWD_0385_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $76,130
- FY2025: −$18,365
- ACQUISITION OF SPECIAL TOOLING AND NDIT PROBE KITS IN SUPPORT OF ECP 6408.
CONT_AWD_0388_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $520,055
- FY2020: $0
- FY2021: $0
- ECP 626 F/A-18A FOLLOW-ON KITS
CONT_AWD_0389_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $8,649,999
- FY2017: $0
- FY2024: −$6,917,002.01
- DATS RELIABILITY IMPROVEMENT
CONT_AWD_0391_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $303,996
- SE DESIGN AND DEVELOPMENT
CONT_AWD_1513_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $1,808,739
- FY2016: $0
- FY2017: −$51,644
- FY2021: $0
- LAU-118(V) 1/A MISSILE LAUNCHER
CONT_AWD_2099_9700_N0001910G0006_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2015: $9,579,515
- FY2016: $0
- FY2017: $0
- FY2019: $0
- LAU-115D/A MISSILE LAUNCHER
CONT_AWD_2100_9700_N0001910G0006_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2015: $37,359,552
- FY2016: $0
- FY2017: $0
- FY2018: $0
- FY2019: $0
- IETMS FOR F/A-18A-D AIRCRAFT
CONT_AWD_3066_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $712,217
- FY2021: $0
- PUMP UNIT,CENTRIFUG
CONT_AWD_5181_9700_SPRPA114G001Y_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2017: $68,508
- ANAV 24 EGR CONVERSION
CONT_AWD_EF07_9700_FA854013D0002_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2016: $1,083,262.20
- AIRFRAME STRUCTURAL COMPONENTS
CONT_AWD_JZ01_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $226,306.08
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_JZ03_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $88,185
- FY2019: $0
- FY2020: $0
- REPAIR GOVERNMENT ITEMS FOR CLINS 0001, 0002, 003, 0004, 0005, 0006. PROGRAMMER, RT, RDR ALT QUANTITY OF 4 AND RCVR/TRANS. IGF::OT::IGF
CONT_AWD_JZ05_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $36,204
- FY2018: $0
- FY2019: $0
- BASIC ORDERING AGREEMENT FOR FORWARD FIT AND RETROFIT KITS
CONT_AWD_JZ50_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $28,776
- BASIC ORDERING AGREEMENT FOR FORWARD FIT AND RETROFIT KITS
CONT_AWD_JZ52_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $53,200
- BASIC ORDERING AGREEMENT FOR FORWARD FIT AND RETROFIT KITS
CONT_AWD_JZ56_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $21,734
- BASIC ORDERING AGREEMENT FOR FORWARD FIT AND RETROFIT KITS
CONT_AWD_JZ57_9700_N0001911G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $134,999.97
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_JZA1_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $363,770.61
- FY2018: $352,856
- FY2019: $367,334
- FY2020: −$427,580.59
- FY2021: $0
- FMS RAAF F/18 CLASSIC HORNET PROGRAM, AT-P-GRE, TECH PUBS AGAINST CORPORATE BOA NAVAL AIR SYSTEMS AND THE BOEING COMPANY
CONT_AWD_JZA2_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $317,050
- TECHNICAL DATA AND PUBLICATIONS
CONT_AWD_JZA3_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $1,248,140.59
- FY2019: −$88,256.81
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_JZA4_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $916,446.91
- FY2018: $951,076.33
- FY2021: −$295,249.34
- 200412!000001!1700!AA430 !NAVAIRSYSCOM HQ !N0001904C0005 !A!N! !N! ! !20031229!20090930!149879157!006265946!009256819!N!MCDONNELL DOUGLAS CORPORATION !J S MCDONNELL BLVD !SAINT LOUIS !MO!63166!65000!510!29!ST. LOUIS !ST. LOUIS (CITY) !MISSOURI !+000090150994!N!N!000979033911!AC15!RDTE/AIRCRAFT-ENG/MANUF DEVELOP !A4A!COMBAT VEHICLES !378 !E/A-18G !541710!E! !3! ! ! ! ! !99990909!B! ! !A! !D!U!R!1!001!N!1G!A!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! !Y! ! !0001! !
CONT_AWD_N0001904C0005_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2008: $101,559,074
- FY2009: $41,569,410
- FY2010: −$102,018
- FY2011: $0
- FY2016: −$30,000
- FY2020: $0
- TIME CRITICAL PARTS (TCP)
CONT_AWD_N0001907C0035_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2008: $239,979,175.03
- FY2009: $4,275,967
- FY2010: −$57,126.65
- FY2011: $0
- FY2020: $0
- NGJ BAA
CONT_AWD_N0001909C0013_9700_-NONE-_-NONE-
BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. · Program office statement
EA-18G
- FY2009: $5,909,517
- NGJ BAA
CONT_AWD_N0001909C0084_9700_-NONE-_-NONE-
NORTHROP GRUMMAN SYSTEMS CORPORATION · Program office statement
EA-18G
- FY2009: $5,996,787
- FY2010: $0
- NGJ BAA
CONT_AWD_N0001909C0085_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2009: $5,538,028
- TIME CRITICAL PARTS (TCP) IN SUPPORT OF EA-18G FRP (LOT 33) AEA KITS
CONT_AWD_N0001909C0086_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
TIME CRITICAL PARTS (TCP) IN SUPPORT OF EA-18G FRP (LOT 33) AEA KITS
- FY2009: $78,153,537
- FY2010: $386,072,521
- FY2011: $129,996,000
- FY2012: $133,689,400
- FY2013: $265,862,000
- FY2014: $0
- FY2015: $0
- CONCEPT DEMONSTRATOR DESIGN
CONT_AWD_N0001910C0070_9700_-NONE-_-NONE-
BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. · Program office statement
EA-18G
- FY2010: $21,840,742
- FY2011: $14,000,000
- FY2012: $24,607,395
- FY2013: $1,520,167
- FY2018: $0
- FY2024: $0
- CONCEPT DEMONSTRATOR (CD) DESIGN
CONT_AWD_N0001910C0071_9700_-NONE-_-NONE-
L3HARRIS TECHNOLOGIES, INC. · Program office statement
EA-18G
- FY2020: $0
- CONCEPT DEMONSTRATOR(CD) DESIGN
CONT_AWD_N0001910C0072_9700_-NONE-_-NONE-
NORTHROP GRUMMAN SYSTEMS CORPORATION · Program office statement
EA-18G
- FY2010: $21,959,996
- FY2011: $14,000,000
- FY2012: $24,716,095
- FY2013: $1,520,599
- FY2016: $0
- FY2019: −$171,156
- CONCEPT DEMONSTRATOR (CD) DESIGN
CONT_AWD_N0001910C0073_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2010: $21,965,757
- FY2011: $13,000,000
- FY2012: $25,721,344
- FY2013: $2,600,000
- FY2018: $0
- FY2019: −$157,605.84
- NEXT GENERATION JAMMER (NGJ) TECHNOLOGY DEVELOPMENT (TD) BASE CONTRACT AWARD
CONT_AWD_N0001913C0128_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2013: $50,030,189
- FY2014: $91,536,629
- FY2015: $132,790,458
- FY2016: $30,932,349
- FY2019: −$1,221,229.64
- FY2020: $0
- IRST LRIP I CSDR CDRL
CONT_AWD_N0001915C0036_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2015: $3,752,262
- FY2016: $0
- FY2017: −$4,600,003.98
- FY2018: $0
- FY2019: $0
- FY2022: $0
- DISTRIBUTED TARGETING PROCESSOR (RAAF)
CONT_AWD_N0001915C0108_9700_-NONE-_-NONE-
L3HARRIS TECHNOLOGIES, INC. · Program office statement
EA-18G
- FY2015: $29,103,495.95
- FY2016: $111,863.08
- FY2017: $11,054,803.13
- FY2018: $15,919,920
- FY2019: $0
- FY2020: $0
- ADS-B (OUT)-CAPABLE CIT SOFTWARE
CONT_AWD_N0001915C3001_9700_-NONE-_-NONE-
BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. · Program office statement
EA-18G
- FY2015: $10,850,416
- FY2016: $0
- FY2017: $0
- FY2018: $0
- IGF::OT::IGF NEXT GENERATION JAMMER (NGJ) ENGINEERING&MANUFACTURING DEVELOPMENT (EMD) PHASE
CONT_AWD_N0001916C0002_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2016: $178,424,785
- FY2017: $409,118,681
- FY2018: $363,757,586
- FY2019: $132,709,103.67
- FY2020: $281,413,273.42
- FY2021: $266,570,640
- FY2022: $82,901,765.91
- FY2023: $69,815,764
- FY2024: $10,537,401
- FY2025: $240,000
- FY2026: $0
- NRE FOR LOW BAND CONSOLIDATION
CONT_AWD_N0001916C0007_9700_-NONE-_-NONE-
CAES SYSTEMS LLC · Program office statement
EA-18G
- FY2026: −$98,154.46
- PRELIMINARY WORK FOR NGJ INTEGRATION IGF::OT::IGF
CONT_AWD_N0001916C0032_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2016: $19,900,000
- FY2017: $42,616,050
- FY2018: $50,225,513
- FY2019: $54,387,882.79
- FY2020: $31,912,841
- FY2021: $16,905,907.50
- FY2022: $30,614,035
- FY2023: $29,799,539
- FY2024: $8,939,415.74
- FY2025: $2,846,337.06
- LOT 40 F/A-18E AND EA-18G AIRCRAFT WITH AEA KITS
CONT_AWD_N0001917C0003_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
LOT 40 F/A-18E AND EA-18G AIRCRAFT WITH AEA KITS
- FY2017: $1,423,952,036.63
- FY2018: $955,237,816.93
- FY2019: $6,144,601.52
- FY2020: $1,120,211.84
- FY2021: $40,687,689.15
- FY2022: $0
- FY2023: $14,361,470.37
- FY2024: $3,488,878
- FY2025: $0
- FY2026: $0
- ROUND ROBIN FIRE SUPPRESSION CONTROL ALARM UPGRADE FROM 473660-03 TO 473660-04
CONT_AWD_N0001917C0019_9700_-NONE-_-NONE-
KIDDE TECHNOLOGIES, INC · Program office statement
EA-18G
- FY2017: $207,257
- FY2018: $213,474.71
- FY2019: $0
- FY2020: −$224,381.94
- IRST BLOCK II PHASE I - NRE
CONT_AWD_N0001917C0024_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $40,463,152
- FY2018: $18,320,945.37
- FY2019: $25,392,101.50
- FY2020: $708,685.13
- FY2021: $0
- FY2022: $0
- IRST LRIP II SYSTEMS
CONT_AWD_N0001917C0026_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $82,084,777
- FY2018: $0
- FY2019: $0
- FY2020: $0
- FY2022: $0
- FY2023: −$1,000,670.02
- USN F414 ENGINES: EA-18G
CONT_AWD_N0001917C0047_9700_-NONE-_-NONE-
GENERAL ELECTRIC COMPANY · Award title or description names the program
USN F414 ENGINES: EA-18G
- FY2017: $206,461,564
- FY2018: $98,789,784
- FY2019: $393,519,822
- FY2020: −$17,800.80
- FY2021: $0
- FY2022: $0
- DTU
CONT_AWD_N0001917C0078_9700_-NONE-_-NONE-
PHYSICAL OPTICS CORPORATION · Program office statement
EA-18G
- FY2021: $0
- FY2023: $0
- MIDS CABLE SETS FY17
CONT_AWD_N0001917F0001_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $1,156,147.51
- FY2018: $0
- THE PURPOSE OF THIS BILATERAL ORDER AGAINST BASIC ORDERING AGREEMENT N00019-16-G-0001 IS TO PROCURE AYC-1539 RETROFIT KITS FOR THE US NAVY AND THE ROYAL AUSTRALIAN AIR FORCE IN ACCORDANCE WITH ECP 6213R2, TRAILING EDGE FLAP RETROFIT REDESIGN (TEFR2) FOR FY17 WITH AN OPTION FOR ADDITIONAL QUANTITIES IN FY18.
CONT_AWD_N0001917F0077_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $93,899,801.28
- FY2018: $5,718,938.04
- FY2022: $0
- ECP 634 SOW HIGH ORDER LANGUAGE UPGRADE
CONT_AWD_N0001917F0120_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $4,769,568
- FY2018: −$4,769,568
- ECP 6312 - DESIGN&DEVELOPMENT
CONT_AWD_N0001917F0443_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $1,520,277
- FY2020: $0
- FY2021: $962,559
- FY2022: $0
- AWARD OF GCU ONSITE SUPPORT AND ENGINEERING SUPPORT.
CONT_AWD_N0001918C1018_9700_-NONE-_-NONE-
GE AVIATION SYSTEMS LLC · Program office statement
EA-18G
- FY2018: $2,016,850
- FY2019: $2,296,307
- FY2020: $1,730,807
- IRST BLOCK II PHASE II NRE
CONT_AWD_N0001918C1022_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $15,500,000
- FY2019: $51,816,253.40
- FY2020: $48,482,809
- FY2021: $43,815,106
- FY2022: $7,383,897.04
- FY2023: $8,460,885
- FY2024: $5,479,058
- FY2025: $0
- IGF:OT:IGF ADVANCE ACQUISITION CONTRACT- LONG LEAD MATERIAL FOR LOT 23 (FY2019) F414-GE-400 ENGINE
CONT_AWD_N0001918C1061_9700_-NONE-_-NONE-
GENERAL ELECTRIC COMPANY · Program office statement
EA-18G
- FY2018: $10,594,000
- FY2019: $208,813,194
- FY2020: $277,113,314
- FY2021: $219,999,984
- FY2022: $112,000,008
- FY2023: $5,279,520
- FY2024: $0
- FY2026: $0
- ECP 6482 ASE USN GROUP A INSTALLS
CONT_AWD_N0001918F0246_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $590,990.92
- FY2019: $23,871,228.50
- FY2020: $0
- FY2021: $174,657
- FY2022: $0
- FY2023: $0
- FY2025: $753,113.76
- ECP 6380 GROUP A KITS
CONT_AWD_N0001918F0469_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $502,651.66
- FY2019: $0
- KIT INSTALLS 3 THROUGH 7
CONT_AWD_N0001918F0471_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $2,392,963
- FY2019: $0
- FY2022: $0
- RAAF - SH
CONT_AWD_N0001918F0489_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $114,012.20
- IRST LRIP I INSTRUMENTATION MOD NRE
CONT_AWD_N0001918F0490_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $1,704,732
- NON-RECURRING ENGINEERING TO INTEGRATE TACTICAL TARGETING NETWORK TECHNOLOGY (TTNT) INTO THE US NAVY FLEET OF F/A-18E/F AND EA-18G AIRCRAFT.
CONT_AWD_N0001918F1511_9700_N0001916G0001_9700
THE BOEING COMPANY · Award title or description names the program
NON-RECURRING ENGINEERING TO INTEGRATE TACTICAL TARGETING NETWORK TECHNOLOGY (TTNT) INTO THE US NAVY FLEET OF F/A-18E/F AND EA-18G AIRCRAFT.
- FY2018: $9,465,735.24
- FY2019: $513,493.90
- FY2020: $0
- FY2021: −$795,192.10
- FY2022: −$10,281.72
- FY2023: $1,254,648
- FY2025: $0
- FY2026: $0
- IGF::OT::IGF DO TO PROCURE RETROFIT SUPPLIES AND SERVICES IN SUPPORT OF ENGINEERING CHANGE PROPOSAL 631C1 CHANGES TO THE INNER WING PANEL.
CONT_AWD_N0001918F1601_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $1,986,828
- FY2021: $0
- FY2022: −$86,303
- FY2024: −$85,512
- FLIGHT TEST SUPPORT
CONT_AWD_N0001918F1718_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $1,317,823
- FY2020: $0
- FY2021: $0
- FY2024: −$783,247
- RETROFIT A1 AND A3 KITS
CONT_AWD_N0001918F2382_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $4,465,200
- FY2020: $0
- RETROFIT A1 AND A3 KITS
CONT_AWD_N0001918F2694_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $1,439,854
- FY2019: $0
- FY2020: $0
- THE PURPOSE OF THIS MODIFICATION IS TO PROCURE RETROFIT KITS IN ACCORDANCE WITH ENGINEERING CHANGE PROPOSAL (ECP) 6393 DIGITAL MEMORY DEVICE FOR LOTS 26-29 AS APPROVED BY NAVAIR CONFIGURATION CONTROL BOARD (CCB) NUMBER 2011AIR0110504 ON 03 JUNE 2011.
CONT_AWD_N0001918F6014_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $1,316,896.48
- FY2019: $0
- DEMONSTRATION OF EXISTING TECHNOLOGIES
CONT_AWD_N0001919C0014_9700_-NONE-_-NONE-
L3 TECHNOLOGIES, INC. · Program office statement
EA-18G
- FY2020: $9,053,711
- DEMONSTRATION OF EXISTING TECHNOLOGIES FOR NGJ LB INC 2
CONT_AWD_N0001919C0015_9700_-NONE-_-NONE-
NORTHROP GRUMMAN SYSTEMS CORPORATION · Program office statement
EA-18G
- FY2019: $40,221,069
- FY2020: $8,476,752
- FY2026: $20,000
- IRST BLOCK II LRIP III SYSTEMS
CONT_AWD_N0001919C0019_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $17,350,000
- FY2020: $139,364,300
- FY2021: $0
- FY2022: $0
- FY2024: $0
- FY2025: $0
- PROCUREMENT OF HIGH SPEED ANTI-RADIATION MISSILE COMMAND LAUNCH COMPUTER (HARM CLC).
CONT_AWD_N0001919C0026_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2019: $17,777,245
- FY2020: $0
- FY2021: $0
- FY2022: $0
- FY2023: $0
- FY2024: $0
- LAU-115 D/A MISSILE LAUNCHERS
CONT_AWD_N0001919C0056_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2019: $64,864,621
- FY2020: $555,637
- FY2021: $0
- FY2022: $0
- FY2023: $0
- FY2024: $0
- FY2025: $0
- ACMC
CONT_AWD_N0001919C0073_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $51,585,701.36
- FY2020: $35,101,590
- FY2022: $0
- FY2023: $0
- FY2024: $0
- QUALIFICATION AND PRODUCTIONIZATION
CONT_AWD_N0001919F0270_9700_N0001915G0003_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2019: $10,319,026
- FY2021: $0
- FY2025: −$4,216,585.61
- PRODUCTION DESIGN AND DEVELOPMENT
CONT_AWD_N0001919F0277_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $635,766
- UPGRADE IRST BLOCK I PODS
CONT_AWD_N0001919F2410_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $42,969,654
- FY2020: $79,630,080
- FY2021: $0
- FY2022: $10,129,673
- FY2023: $0
- FY2024: −$10,078,459
- FY2025: $0
- IRST LRIP I - AV6+ PROCESSOR CARDS
CONT_AWD_N0001919F2411_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $2,157,406.64
- FY2020: $1,415,762.80
- DESIGN&DEVELOPMENT
CONT_AWD_N0001919F2428_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $120,495
- ECP-6342C7 ATFLIR VIDEO DOWNLINK PRODUCT DRAWINGS
CONT_AWD_N0001919F4080_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $24,680
- C2 TOOL
CONT_AWD_N0001919F4178_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $480,487
- FY2020: $0
- FY2021: $0
- MANUFACTURE QUANTITY OF (1) ONE ALQ-99 BAND 5/6 OTWT
CONT_AWD_N0001920C0063_9700_-NONE-_-NONE-
TELEDYNE DEFENSE ELECTRONICS, LLC · Program office statement
EA-18G
- FY2020: $913,048
- FY2021: $1,538,065
- FY2022: $30,668.13
- FY2023: $0
- FY2024: $0
- ROUND ROBIN FSCA UPGRADE
CONT_AWD_N0001920C0066_9700_-NONE-_-NONE-
KIDDE TECHNOLOGIES, INC · Program office statement
EA-18G
- FY2020: $389,920
- FY2023: $181,070
- FY2024: $405,665
- FY2025: $350,496
- ECP 6471 INCORPORATION OF TACTICAL TARGETING NETWORK TECHNOLOGY AND PROCUREMENT OF A-KITS
CONT_AWD_N0001920F0243_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2020: $6,079,755.40
- FY2021: $0
- FY2022: $0
- FY2023: $0
- ATFLIR WINDOWS 10 STE UPGRADE
CONT_AWD_N0001920F0277_9700_N0001915G0003_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2020: $17,897,746
- FY2021: $0
- FY2022: $1,339,008
- FY2023: $1,736,922
- FUNDING IN SUPPORT OF CLIN 0001
CONT_AWD_N0001920F0450_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2020: $519,884.01
- FY2022: $0
- RETROFIT A1 AND A3 KITS
CONT_AWD_N0001920F0573_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2020: $7,373,400
- FY2023: $0
- ECP-6516 AIRCRAFT INTEGRATION NRE
CONT_AWD_N0001920F0870_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2020: $16,543,704.23
- FY2021: $4,662,606.23
- FY2022: $4,815,883.07
- FY2024: $0
- FY2026: $0
- NGJ LB CB1 DEVELOPMENT
CONT_AWD_N0001921C0021_9700_-NONE-_-NONE-
L3 TECHNOLOGIES, INC. · Program office statement
EA-18G
- FY2021: $73,473,848.01
- FY2022: −$39,753,004
- FY2025: $0
- NGJ-MB LRIP1/2
CONT_AWD_N0001921C0053_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2021: $171,629,205.69
- FY2022: $247,719,769.71
- FY2023: $599,828
- FY2024: $2,264,258
- FY2025: $4,235,001
- FY2026: $5,822,710
- ECP 6514 DESIGN & DEVELOP - F/A-18F/G
CONT_AWD_N0001921F0028_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $2,682,215.68
- FY2022: −$83,231
- FY2024: $0
- ECP 6507C1 PUBLICATIONS - PAPER
CONT_AWD_N0001921F0089_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $1,606,681
- THIS DELIVERY ORDER PROCURES F414 SPARE ENGINES AND MODULES. RECLAMATION CREDITS ARE USED TO PROCURE CLINS 0010, 0011, AND 0012.
CONT_AWD_N0001921F0120_9700_N0001921D0003_9700
GENERAL ELECTRIC COMPANY · Program office statement
EA-18G
- FY2021: $134,458,910
- FY2022: $0
- FY2023: $0
- FY2024: $0
- ECP-639 IETMS USN
CONT_AWD_N0001921F0170_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $5,890,958.76
- FY2022: $0
- FY2023: $0
- FY2024: $0
- FY2025: $0
- NON-RECURRING ENGINEERING (NRE)
CONT_AWD_N0001921F0252_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $1,575,908
- IRST WAFER PROCESSING
CONT_AWD_N0001921F0256_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $1,428,436
- FY2026: $0
- F/A-18 IRST - INFRARED RECEIVER (IRR)AND PROCESSORS
CONT_AWD_N0001921F0316_9700_N0001919G0029_9700
LOCKHEED MARTIN CORPORATION · Program office statement
EA-18G
- FY2021: $48,777,624
- FY2022: $9,900,000
- FY2023: $0
- FY2025: $0
- FY2026: $44,231
- ENGINEERING CHANGE PROPOSAL (ECP) 6315 NAVIGATION WARFARE ANTENNA SUBSYSTEM (NAVWAR)RETROFIT KITS
CONT_AWD_N0001921F0397_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $4,981,539
- FY2022: $0
- FY2023: $4,319,508
- FY2024: $4,236,624
- FY2025: $5,333,738
- NRE FOR MVK 14M DEVICE
CONT_AWD_N0001921F0523_9700_N0001921G0004_9700
GENERAL ELECTRIC COMPANY · Program office statement
EA-18G
- FY2021: $3,924,473.23
- FY2023: $0
- FY2024: $0
- FY2025: $0
- FY2026: $0
- LAU 115 D/A AND LAU-116 B/A MISSILE LAUNCHER
CONT_AWD_N0001921F0570_9700_N0001921D0021_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2021: $49,598,247
- FY2023: $0
- FY2024: $0
- IRST FTA/SAS
CONT_AWD_N0001921F0689_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $1,615,773.60
- FY2022: $0
- FY2023: $0
- FY2024: $0
- FY2025: $0
- FY2026: $0
- ACMC USN (ECP-6459) AVC-5926
CONT_AWD_N0001922C0013_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2022: $51,700,000.01
- FY2023: $0
- FY2024: $0
- FY2025: $0
- FY2026: $0
- DTU, 1553 DTU, HDVR
CONT_AWD_N0001922C0038_9700_-NONE-_-NONE-
MERCURY MISSION SYSTEMS LLC · Program office statement
EA-18G
- FY2022: $35,711,353.61
- FY2023: $19,327,708.86
- FY2024: $16,817,046.25
- FY2026: $0
- FLIGHT CONTROL COMPUTER OPERATIONAL FLIGHT PROGRAM UPDATE SUPPORTING AUTOMATIC GROUND COLLISION AVOIDANCE SYSTEM CAPABILITY
CONT_AWD_N0001922C0059_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
EA-18G
- FY2022: $12,353,619
- FY2023: $0
- FY2024: $0
- FY2025: $932,400
- THE PURPOSE OF THIS DELIVERY ORDER IS TO PROCURE LABOR, TRAVEL, AND DATA ASSOCIATED WITH THE AFOREMENTIONED PWS PARAGRAPHS AND CDRLS IN SECTION J.
CONT_AWD_N0001922F0991_9700_N0001922D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2022: $2,425,275
- FY2023: $0
- FY2024: −$695,926
- LAU-115 D/A MISSILE LAUNCHER DO#2
CONT_AWD_N0001922F1158_9700_N0001921D0021_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2022: $32,607,438
- FY2023: $0
- FY2024: $0
- IRST
CONT_AWD_N0001922F2016_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2022: $43,512,163.07
- FY2023: $9,391,406.05
- FY2024: $0
- FY2025: $0
- FY2026: $25,507,850
- LABOR
CONT_AWD_N0001922F2033_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2022: $1,162,705
- FY2023: $1,102,307.75
- FY2024: $1,262,639.20
- FY2025: $0
- FY2026: $5,532,178.51
- F/A - 18E/F SLM AT SAT AC #166640 UPDATE CLIN 0305 TO DATA TO SUPPORT 0308. CLIN 0308 FUNDING FOR AC #166640
CONT_AWD_N0001922F2223_9700_N0001918D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2022: $8,228,414
- FY2023: −$763,012.69
- FY2024: $342,029.70
- USN F414 SPARE HIGH PRESSURE COMPRESSOR AND F414 FANS MODULES. CLIN 0102 FANS MODULES IS BEING PROCURED WITH APN-6 FUNDING IN THE AMOUNT OF $1,736,003 AND RECLAMATION CREDITS IN THE AMOUNT OF $419,371.
CONT_AWD_N0001922F2351_9700_N0001921D0003_9700
GENERAL ELECTRIC COMPANY · Program office statement
EA-18G
- FY2022: $16,338,167
- FY2023: $0
- FY2024: $0
- THIS ORDER UNDER IDIQ CONTRACT N00019-22-D-0001 IS FOR VALIDATION TESTING OF THE CALSPAN WIND TUNNEL IN SUPPORT OF NEXT GENERATION JAMMER LOW-BAND (NGJ-LB).
CONT_AWD_N0001922F2401_9700_N0001922D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2022: $1,105,688.96
- FY2023: $63,739
- FY2024: −$26,829.78
- F/A-18 IRST LRIP 6 BUY
CONT_AWD_N0001922F2503_9700_N0001919G0029_9700
LOCKHEED MARTIN CORPORATION · Program office statement
EA-18G
- FY2022: $72,133,966
- FY2023: $133,623,631
- FY2024: $0
- FY2025: $119,504
- FY2026: $0
- NGJ-MB LRIP III
CONT_AWD_N0001923C0037_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2023: $675,308,464.81
- FY2024: −$5,738,633
- FY2025: $930,992
- FY2026: $255,180
- NON-RECURRING ENGINEERING FOR AEA ASSEMBLY AND CONSOLIDATION.
CONT_AWD_N0001923C0038_9700_-NONE-_-NONE-
CAES SYSTEMS LLC · Program office statement
EA-18G
- FY2026: $0
- F/A-18 IRST PROGRAM NON-RECURRING ENGINEERING FOR ROIC REDESIGN
CONT_AWD_N0001923F0030_9700_N0001919G0029_9700
LOCKHEED MARTIN CORPORATION · Program office statement
EA-18G
- FY2023: $6,000,000
- FY2024: $6,044,918.39
- FY2025: $6,345,756.84
- FY2026: $0
- THIS DELIVERY ORDER IS ISSUED UNDER AND PURSUANT TO CONTRACT N00019-22-D-0001 FOR THE PROCUREMENT OF NON-RECURRING ENGINEERING (NRE) TO PREPARE ECP 6535 IAW CDRL A012 TO ADDRESS INTEGRATION OF NEXT GENERATION JAMMER- LOW BAND (NGJ-LB) ON THE EA-18G.
CONT_AWD_N0001923F0550_9700_N0001922D0001_9700
THE BOEING COMPANY · Award title or description names the program
THIS DELIVERY ORDER IS ISSUED UNDER AND PURSUANT TO CONTRACT N00019-22-D-0001 FOR THE PROCUREMENT OF NON-RECURRING ENGINEERING (NRE) TO PREPARE ECP 6535 IAW CDRL A012 TO ADDRESS INTEGRATION OF NEXT GENERATION JAMMER- LOW BAND (NGJ-LB) ON THE EA-18G.
- FY2023: $585,364.47
- FY2024: −$186,508.11
- FY2026: $50,000
- 1-PROCURE TWO USN F414 FAN MODULES ON CONTRACT LINE ITEM NUMBER (CLIN)0211. UNITS UNDER CLIN0211 WILL BE FUNDED THROUGH THE NAVY RECLAMATION AND CONSIDERATION PROGRAM ADD FUNDING ON CLIN0210, USN F414 PRODUCTION LOT 47 ENGINES, A QUANTITY OF 16.
CONT_AWD_N0001923F0642_9700_N0001921D0003_9700
GENERAL ELECTRIC COMPANY · Program office statement
EA-18G
- FY2023: $74,318,944
- FY2024: $0
- FY2025: $0
- THIS DELIVERY ORDER IS ISSUED AS A FOLLOW-ON FOR THE NGJ-LB IDIQ CONTRACT N00019-22-D-0001, DELIVERY ORDER N0001922F0991 TO PICK UP THE SCOPE OF THE TASK ORDER TO INCLUDE ELEMENTS OF PROGRAM MANAGEMENT, ENGINEERING, COST, LOGISTICS, AND SECURITY.
CONT_AWD_N0001923F0685_9700_N0001922D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $1,499,918.63
- FY2024: $1,500,000
- FY2025: $0
- FY2026: $1,440,000
- THIS DELIVERY ORDER IS ISSUED UNDER AND PURSUANT TO CONTRACT N00019-22-D-0001 FOR THE PROCUREMENT OF A STORE SEPARATION CHARACTERISTICS ANALYSIS AND REPORT.
CONT_AWD_N0001923F2577_9700_N0001922D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $91,632.92
- FY2024: −$36,468
- MBX NRE
CONT_AWD_N0001924C0047_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2024: $12,000,000
- FY2025: $58,991,085.78
- FY2026: $57,427,153.08
- NGJ LB CB1 DEVELOPMENT
CONT_AWD_N0001924C0061_9700_-NONE-_-NONE-
L3 TECHNOLOGIES, INC. · Program office statement
EA-18G
- FY2024: $76,226,988.61
- FY2025: $65,963,128.73
- FY2026: $85,500,000
- FY23 IRST IRP 15 SPE REPAIR
CONT_AWD_N0001924F0134_9700_N0001923G0002_9700
LOCKHEED MARTIN CORPORATION · Program office statement
EA-18G
- FY2024: $50,719.77
- FY2025: $0
- NON-RECURRING ENGINEERING ORDER FOR TEST AND EVALUATION TECHNICAL SUPPORT ON THE EMD EFFORT.
CONT_AWD_N0001924F0139_9700_N0001920G0007_9700
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2024: $4,204,660
- FY2025: $0
- NGEAU NON-RECURRING ENGINEERING (NRE) AND PRODUCTION OF A-KITS AND B-KITS.
CONT_AWD_N0001924F0259_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2024: $32,255,455.03
- FY2025: $63,764,971.20
- FY2026: $27,179,366.60
- THE PURPOSE OF THIS DELIVERY ORDER IS FOR THE PROCUREMENT OF STORE SEPARATION WIND TUNNEL TESTING FOR THE NEXT GENERATION JAMMER LOW-BAND ON EA-18G.
CONT_AWD_N0001924F0320_9700_N0001922D0001_9700
THE BOEING COMPANY · Award title or description names the program
THE PURPOSE OF THIS DELIVERY ORDER IS FOR THE PROCUREMENT OF STORE SEPARATION WIND TUNNEL TESTING FOR THE NEXT GENERATION JAMMER LOW-BAND ON EA-18G.
- FY2024: $985,756.66
- FY2025: $0
- FY2026: $3,100
- DELIVERY ORDER FOR NGJ-LB IDIQ
CONT_AWD_N0001924F1039_9700_N0001922D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2024: $549,497.74
- FY2025: $0
- FY2026: $37,213
- NAVAIR IRR
CONT_AWD_N0001924F2576_9700_N0001923G0002_9700
LOCKHEED MARTIN CORPORATION · Program office statement
EA-18G
- FY2024: $132,433,520.93
- FY2025: $0
- FY2026: $0
- NEW CONTRACT FOR IRST RFP 1
CONT_AWD_N0001925C0009_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
EA-18G
- FY2025: $233,000,000
- FY2026: $16,006,069.05
- NGJ-MB PRODUCTION LOT 4 SYSTEM SHIPSETS, SPARES AND NRE
CONT_AWD_N0001925C0065_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2025: $590,843,893.92
- FY2026: $642,423.31
- NGJ-MB PRODUCTION LOT 5 SYSTEM SHIPSETS
CONT_AWD_N0001925C0104_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2025: $581,160,010.65
- FY2026: $1,129,000
- WIND TUNNEL TEST SUPPORT FOR NGJ-LB POD AT NASA WTT FACILITY
CONT_AWD_N0001925F2000_9700_N0001922D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2025: $1,019,601.46
- FY2026: $237,976
- THIS DELIVERY ORDER COVERS THE PROCUREMENT, DELIVERY, AND INSTALLATION OF THE GROUP A RETROFIT KITS FOR ECP 6535.
CONT_AWD_N0001926F0270_9700_N0001922D0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2026: $3,200,000
- THE PURPOSE OF THIS ORDER IS TO PROCURE NON-RECURRING ENGINEERING AND ASSOCIATED TEST ASSETS FOR THE DESIGN, DEVELOPMENT, AND INTEGRATION OF AN/ALQ-264(V) BEOWULF.
CONT_AWD_N0001926F1055_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2026: $33,988,353.63
- SRA REPROGRAMMING STATION / PROTOTYPE
CONT_AWD_N0016413CWS68_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2013: $470,945
- FY2014: $0
- FY2017: $0
- SYNTHETIC SOURCE INSTRUMENTS
CONT_AWD_N6893608C0082_9700_-NONE-_-NONE-
TEXTRON SYSTEMS CORPORATION · Program office statement
EA-18G
- FY2008: $2,596,000
- FY2010: $0
- F/A-18 AND EA-18G FISCAL YEAR 2026 CAPABILITY DEVELOPMENT SYSTEM CONFIGURATION SETS (SCS) SUPPORT
CONT_AWD_N6893626F5003_9700_N6893623D0001_9700
THE BOEING COMPANY · Award title or description names the program
F/A-18 AND EA-18G FISCAL YEAR 2026 CAPABILITY DEVELOPMENT SYSTEM CONFIGURATION SETS (SCS) SUPPORT
- FY2026: $124,609,369.30
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND. THIS CONTRACT PROVIDES USSR RMMS.
CONT_AWD_S2606A17F0002_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $520,528.32
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F0006_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $30,099
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F0009_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $37,795
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F0010_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $40,388
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F0011_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $21,246
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F0021_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $90,560
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F1014_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $20,235
- FY2019: $0
- FY2022: $0
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F1028_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $29,632
- FY2018: $0
- FY2019: $0
- FY2020: $0
- FY2022: $0
- FY2023: −$2,538
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A17F1032_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2017: $98,337
- FY2019: $0
- FY2022: $0
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A18F0080_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $45,283.58
- FY2019: $0
- FY2022: −$5,600
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A18F0092_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2018: $316,447
- FY2019: $0
- FY2020: $0
- FY2024: −$234,222.40
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A19F0124_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $40,265
- FY2024: −$6,501
- DELIVERY ORDER ISSUED FOR THE REPAIR OF RADIO TRANSMITTERS.
CONT_AWD_S2606A19F0153_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $22,570
- FY2024: −$1,766
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND. DELIVERY ORDER ISSUED FOR RMAF TECH PUBS; MULTI YEAR
CONT_AWD_S2606A19F0158_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2019: $1,217,918.39
- FY2020: $1,014,944.56
- FY2021: $973,098.30
- FY2022: $997,485.66
- FY2023: $0
- FY2025: −$520,381.60
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A20F0051_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2020: $25,674
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A20F0055_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2020: $110,375
- FY2021: −$88,980
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND. DO FOR RAAF TECH PUBS
CONT_AWD_S2606A21F0007_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $290,000.03
- FY2022: −$290,000.03
- CORPORATE BASIC ORDERING AGREEMENT (BOA) WITH THE BOEING COMPANY AND NAVAL AIR SYSTEMS COMMAND.
CONT_AWD_S2606A21F0026_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2021: $15,421
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0007_9700_N0001916G0001_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $18,887
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0007_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $41,711.34
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0008_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $19,795
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0010_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $43,066.24
- FY2025: $3,833.80
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0013_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $465,680
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0018_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $151,135.24
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0022_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $147,298.65
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0031_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $93,080.96
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A23F0046_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2023: $11,366.67
- FY2025: $26,095.63
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A24F0001_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2024: $248,056.82
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A24F0007_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2024: $61,884.46
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A24F0015_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2024: $93,086.92
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS BASIC ORDERING AGREEMENT (BOA).
CONT_AWD_S2606A24F0034_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2024: $23,151.60
- THE CONTRACTOR SHALL FURNISH SUPPLIES OR SERVICES WHEN ORDERED BY THE GOVERNMENT IN ACCORDANCE WITH THE CONTRACT (BOA) TERMS AND CONDITIONS.
CONT_AWD_S2606A24F0039_9700_N0001921G0006_9700
THE BOEING COMPANY · Program office statement
EA-18G
- FY2024: $146,194.61
- FY2025: $1
- ANTENNA
CONT_AWD_SPRPA115CY029_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2015: $766,920
- ANTENNA
CONT_AWD_SPRPA117C002Y_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
EA-18G
- FY2017: $632,767.30
- ELECTRON TUBE
CONT_AWD_SPRPA117CW061_9700_-NONE-_-NONE-
TELEDYNE DEFENSE ELECTRONICS, LLC · Program office statement
EA-18G
- FY2017: $2,795,646
- FY2019: $0
- CONTROL,INTERFACE
CONT_AWD_SPRPA118FKQ0D_9700_SPE4A117G0017_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2018: $502,680
- FY2019: $0
- HOUSING ASSEMBLY
CONT_AWD_SPRPA118FLH0X_9700_SPRPA114G001Y_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2018: $23,091.12
- HOUSING ASSEMBLY,FA
CONT_AWD_SPRPA118FLH11_9700_SPRPA114G001Y_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2018: $549,136.80
- FY2019: $0
- PUMP UNIT,CENTRIFUG
CONT_AWD_SPRPA118FLH17_9700_SPRPA114G001Y_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2018: $342,540
- VALVE,CABIN FLOW
CONT_AWD_SPRPA118FLH19_9700_SPRPA114G001Y_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2018: $38,543.90
- VALVE,CABIN FLOW
CONT_AWD_SPRPA118FLH22_9700_SPRPA114G001Y_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2018: $38,543.90
- AMPLIFIER ASSEMBLY
CONT_AWD_SPRPA119CY047_9700_-NONE-_-NONE-
L3HARRIS TECHNOLOGIES, INC. · Program office statement
EA-18G
- FY2019: $711,750
- FY2020: $0
- ELECTRONIC COMPONEN
CONT_AWD_SPRPA119CY063_9700_-NONE-_-NONE-
L3HARRIS TECHNOLOGIES, INC. · Program office statement
EA-18G
- FY2019: $354,497
- FY2020: $0
- FY2022: $14,784
- FY2025: $0
- FY2026: $0
- CYLINDER ASSEMBLY,A
CONT_AWD_SPRPA119FKK00_9700_SPE4A117G0005_9700
NORTHROP GRUMMAN SYSTEMS CORPORATION · Program office statement
EA-18G
- FY2019: $115,548
- FY2020: $0
- FY2021: −$1,155.48
- WINGTIP POD-LEFT,AI
CONT_AWD_SPRPA119FL604_9700_SPRPA113G002Y_9700
NORTHROP GRUMMAN SYSTEMS CORPORATION · Program office statement
EA-18G
- FY2019: $5,722,296.50
- FY2020: $0
- VALVE,BUTTERFLY
CONT_AWD_SPRPA119FQ800_9700_SPE4A117G0016_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2019: $278,493.88
- VALVE,BUTTERFLY
CONT_AWD_SPRPA119FQ801_9700_SPE4A117G0016_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2019: $20,242.72
- VALVE,BUTTERFLY
CONT_AWD_SPRPA119FQ802_9700_SPE4A117G0016_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2019: $136,638.36
- RUDDER,AIRCRAFT,AIR
CONT_AWD_SPRPA120FLT00_9700_SPRPA115G001Z_9700
NORTHROP GRUMMAN SYSTEMS CORPORATION · Program office statement
EA-18G
- FY2020: $24,299,974
- FY2021: −$215,044
- FY2025: $0
- BODY,VALVE
CONT_AWD_THAG_9700_SPE4A117G0017_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
EA-18G
- FY2017: $145,500
USAspending awards reviewed as belonging to this program, matched on the exact award key, never on a similar name. Net obligations through Oct 6, 2026; later years are partial. The appropriation that paid for an award is not identified, so obligations are not compared with the enacted column.
Method
Four measures
- Requested
- What a budget request asked for. Not money Congress provided.
- Enacted
- What a law provided, or a spend plan's allocation of a law's lump sum.
- Announced ceiling
- The most a contract vehicle or agreement could be worth, as announced. Not spending.
- Obligated
- Net obligations on USAspending actions of the awards linked to the program. The funding account is not identified.
An announced ceiling is not spending
Figures come from the budget justification books, public laws and agency announcements named in the evidence table; where a source shows no amount the tracker says so rather than showing zero, and where DefDex has not yet checked a source it says that too. See the methodology for how federal obligations are counted.