Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Program totals · 1 | ||
| Development program totalA separately scoped historical development total has not been verified. | Not established | — |
| Unit costs · 1 | ||
| Reported aircraft unit costPublished legacy figure; not a current replacement price. | $141.7MDollar year not stated | E-6B Mercury airborne command post fact sheet U.S. Navy · figure Navy fact sheet, reviewed Oct 2026 |
| Quantities · 2 | ||
| Operational fleet scopeBudget narrative identifies 16 E-6Bs, separately from one TE-6B trainer planned for FY2024. | 16U.S. only | FY2024 Navy O&M budget, Aviation Logistics E-6B fleet scope U.S. Navy · figure FY2024 budget, March 2023 |
| Program quantityA separate acquisition quantity has not been verified. | Not established | — |
| Operating costs · 1 | ||
| Annual O&S / entire E-6B fleetGAO total fleet cost. Per-aircraft presentations have differing denominators, so this page retains the fleet total. | $489.34M / yrConstant FY2018 $ | Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018 |
Program totals · 1
- Development program totalA separately scoped historical development total has not been verified.Source not recordedNot established
Unit costs · 1
- Reported aircraft unit costPublished legacy figure; not a current replacement price.E-6B Mercury airborne command post fact sheet U.S. Navy · figure Navy fact sheet, reviewed Oct 2026$141.7MDollar year not stated
Quantities · 2
- Operational fleet scopeBudget narrative identifies 16 E-6Bs, separately from one TE-6B trainer planned for FY2024.FY2024 Navy O&M budget, Aviation Logistics E-6B fleet scope U.S. Navy · figure FY2024 budget, March 202316U.S. only
- Program quantityA separate acquisition quantity has not been verified.Source not recordedNot established
Operating costs · 1
- Annual O&S / entire E-6B fleetGAO total fleet cost. Per-aircraft presentations have differing denominators, so this page retains the fleet total.Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018$489.34M / yrConstant FY2018 $
Earlier observations · 2
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| Annual O&S / entire E-6B fleetSame GAO fleet-cost series. | $447.45M / yrConstant FY2018 $ | Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2011 |
| Annual O&S / entire E-6B fleetGAO total fleet cost. Per-aircraft presentations have differing denominators, so this page retains the fleet total. | $489.34M / yrConstant FY2018 $ | Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018 |
- Annual O&S / entire E-6B fleetSame GAO fleet-cost series.Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2011$447.45M / yrConstant FY2018 $
- Annual O&S / entire E-6B fleetGAO total fleet cost. Per-aircraft presentations have differing denominators, so this page retains the fleet total.Weapon System Sustainment: GAO-21-101SP, FY2011–2018 operating costs GAO · figure FY2018$489.34M / yrConstant FY2018 $
A fleet total is not a per-aircraft cost
The operating figure covers the whole fleet. It is deliberately not placed on the same per-aircraft basis as other types without reconciling the denominator.
Contracts & purchasing · 1
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Value | Qty | Source |
|---|---|---|---|---|
| U.S. Navy → Northrop GrummanBlock II modifications for multiple aircraft through 2027; six modifications means six capabilities, not six aircraft. | Integrated modification and maintenance contract | $111M | — | E-6B Block II integrated modification and maintenance, June 6, 2023 NAVAIR · figure Jun 6, 2023 report |
Open research: Separately scoped historical R&D total remains unverified; missing is not zero. Quantity and cost figures retain their source dates. Historical snapshots are not a census of operational availability on the review date. No international purchase record verified in this profile; this is not proof that no foreign operators exist.