Program · United States · U.S. Air Force
KC-46A Tanker Modernization Program
Multimission aerial refueling aircraft.
The profile’s obligated figure counts resolved program awards from reported acquisition codes and reviewed links, with shared awards excluded; the tracker counts catalog fiscal years of resolved reviewed award links, so the figures can differ. The budget tracker separates requested, enacted, announced ceiling and obligated amounts for FY2025–FY2027: KC-46A Tanker Modernization Program figures cover R-1 program elements 0401221F; P-1 lines 3010 KC-46A MDAP aircraft, 3010 KC-46A MDAP modifications. KC-46A aircraft and KC-46A modifications are separate lines. Obligations are only the USAspending awards carrying reviewed DoW acquisition program code 387 (KC-46A). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.
About
The KC-46A program adapts Boeing's 767 airframe into an aerial-refueling tanker for U.S. and allied aircraft, with additional cargo and aeromedical capabilities. It uses a remote-vision system that allows a crew member to operate the refueling boom from inside the aircraft. GAO's June 2025 assessment identified continuing remote-vision and boom issues affecting the full-rate-production decision.
News6
- Nov 24, 2026Government record (high significance)U.S. Department of WarContracts for Nov. 24, 2026
- Oct 23, 2026NewsMilitary TimesUS Air Force wants AI to assist aerial refueling
- Aug 20, 2026NewsBreaking DefenseUS greenlights potential $4.5B sale of four KC-46A refueling aircraft to Qatar
- Aug 20, 2026Government record (high significance)U.S. Department of StateQatar – KC-46A Aerial Refueling Aircraft
- Aug 6, 2021Government record (high significance)U.S. Air ForceAMC moves forward with second KC-46 ICR milestone
- Feb 7, 2019Government recordU.S. Air ForceTinker readies for KC-46 maintenance
Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Totals · 2 | ||
| Development program totalRDT&E appropriation estimate, separate from Boeing company-funded losses. | $6.084BThen-year $ | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR |
| Lifetime fleet O&S estimateProgram lifetime projection; do not add it to a single year’s operating cost. | $212.622BThen-year $ | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR |
| Unit costs · 1 | ||
| Average procurement / aircraft$33.1785B procurement for 179 procurement aircraft; excludes R&D and military construction. | $185.355MThen-year $ | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR |
| Quantities · 2 | ||
| Cumulative program deliveries78 production + four development in the SAR delivery table; not a current active inventory. | 82U.S. only | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR |
| Program acquisition quantity179 procurement plus four development aircraft. | 183U.S. only | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR |
| Operating costs · 1 | ||
| Annual O&S / aircraft estimateLife-cycle model, not observed current annual cost. | $13.9M / yrConstant FY2016 $ | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR |
Totals · 2
- Development program totalRDT&E appropriation estimate, separate from Boeing company-funded losses.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR$6.084BThen-year $
- Lifetime fleet O&S estimateProgram lifetime projection; do not add it to a single year’s operating cost.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR$212.622BThen-year $
Unit costs · 1
- Average procurement / aircraft$33.1785B procurement for 179 procurement aircraft; excludes R&D and military construction.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR$185.355MThen-year $
Quantities · 2
- Cumulative program deliveries78 production + four development in the SAR delivery table; not a current active inventory.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR82U.S. only
- Program acquisition quantity179 procurement plus four development aircraft.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR183U.S. only
Operating costs · 1
- Annual O&S / aircraft estimateLife-cycle model, not observed current annual cost.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR$13.9M / yrConstant FY2016 $
Earlier observations · 2
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| Average procurement / aircraft$33.1785B procurement for 179 procurement aircraft; excludes R&D and military construction. | $185.355MThen-year $ | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR |
| Baseline average procurement cost175 procurement aircraft in baseline; current scope has 179. | $176.556MThen-year $ | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Current APB baseline in 2023 MSAR |
- Average procurement / aircraft$33.1785B procurement for 179 procurement aircraft; excludes R&D and military construction.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 MSAR$185.355MThen-year $
- Baseline average procurement cost175 procurement aircraft in baseline; current scope has 179.KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Current APB baseline in 2023 MSAR$176.556MThen-year $
Contracts & purchasing · 1
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Stated amount | Qty | Source |
|---|---|---|---|---|
| Israel via U.S. FMS → BoeingMSAR documents four-aircraft award; LOA funding is a broader scope and not substituted for award value. | Definitized aircraft award | Amount not stated | 4 | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Aug 31, 2022; definitized Dec 21, 2023 |
International buyers · 2
| Country | Qty | Status | Source |
|---|---|---|---|
| JapanMSAR records six approved and four delivered by March 2024; additional requests are not counted as firm orders. | 6 | Approved FMS acquisition | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure 2023 MSAR / 2024 update |
| IsraelFour aircraft under the definitized award. | 4 | Contracted | KC-46A December 2023 MSAR, FY2025 budget Department of Defense · figure Dec 2023 |
Open research: Quantity and cost figures retain their source dates. Historical snapshots are not a census of operational availability on the review date.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
Contracts$37.36B obligated on code-mapped awards
- Code-mapped awards are every contract award in the USAspending baseline (DoD, DHS, DOE and NASA, FY2008–FY2027) whose latest reported acquisition program code is this program's, whichever company received it; vehicles (IDVs) are excluded.
By fiscal year16
| Fiscal year | Obligated | Actions |
|---|---|---|
| FY2011 | $810M obligated | 13 |
| FY2012 | $706M obligated | 10 |
| FY2013 | $1.59B obligated | 20 |
| FY2014 | $1.40B obligated | 18 |
| FY2015 | $468M obligated | 17 |
| FY2016 | $2.98B obligated | 31 |
| FY2017 | $2.38B obligated | 28 |
| FY2018 | $3.27B obligated | 35 |
| FY2019 | $2.94B obligated | 43 |
| FY2020 | $172M obligated | 46 |
| FY2021 | $4.47B obligated | 55 |
| FY2022 | $3.25B obligated | 81 |
| FY2023 | $2.80B obligated | 95 |
| FY2024 | $2.81B obligated | 170 |
| FY2025 | $2.99B obligated | 135 |
| FY2026 | $4.31B obligated | 135 |
Contractors17
- Boeing$36.76B obligated 98%
- Source One Spares LLC$130M obligated 0.3%
- Davenport Aviation$127M obligated 0.3%
- Aar Government Services, Inc.$55.5M obligated 0.1%
- RTX$47.4M obligated 0.1%
- Sierra Nevada Company$37.3M obligated 0.1%
- Digitized Schematic Solutions LLC$11.3M obligated 0.0%
- Shipcom Federal Solutions LLC$4.3M obligated 0.0%
- Amentum$3.5M obligated 0.0%
- AAR Manufacturing$2.0M obligated 0.0%
- Honeywell International$939K obligated 0.0%
- VSE Corporation$910K obligated 0.0%
- Other companies (5)$1.3M obligated 0.0%
- Recipients without a DefDex profile (69 awards)$182M obligated 0.5%
Reported acquisition program code 387; program scope may be incomplete or miscoded · 181 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.
Participants11
Prime
2- BoeingConfirmed

In January 2019 Boeing stated that the KC-46, derived from its commercial 767 airframe, was built at its Everett, Washington facility.
Source: boeing.mediaroom.com
The Air Force awarded Eaton Corp (Eaton Aerospace Jackson) and Eaton Corporation (Airframe) direct KC-46 parts exchange/repair contracts in July 2026 (FA8109-26-D-B009/B010).
Source: sam.gov
Supplier
9In 2011 Boeing listed Cobham (Davenport, Iowa) for KC-46 refueling systems, including wing aerial refueling pods and the centerline drogue system.
Source: boeing.mediaroom.com
In 2011 Boeing listed GE Aviation Systems (Grand Rapids, Michigan; Clearwater, Florida) for the KC-46 mission control system.
Source: boeing.mediaroom.com
In January 2021 Military & Aerospace Electronics reported that Honeywell Aerospace provides the KC-46 air data inertial navigation system and auxiliary power unit, cabin pressure control and lighting.
Source: www.militaryaerospace.com
In 2011 Boeing listed Moog for KC-46 flight-control actuators and valves and the refueling boom actuators.
Source: boeing.mediaroom.com
In 2011 Boeing listed Northrop Grumman (Rolling Meadows, Illinois) for the KC-46 Large Aircraft Infrared Countermeasures system.
Source: boeing.mediaroom.com
In 2011 Boeing listed Pratt & Whitney (Middletown, Connecticut) as the KC-46 engine supplier.
Source: boeing.mediaroom.com
In 2011 Boeing listed Rockwell Collins (Cedar Rapids, Iowa) for the KC-46 integrated display system, tactical situational awareness system and boom operator remote vision system.
Source: boeing.mediaroom.com
In 2011 Boeing listed Raytheon Company (El Segundo, California) for the KC-46 digital radar warning receiver and anti-jam GPS receiver.
Source: boeing.mediaroom.com
In 2011 Boeing listed Spirit as supplier of the KC-46 forward fuselage section, strut and nacelle components, built in Wichita, Kansas.
Source: boeing.mediaroom.com
Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.
Where It Is Built7
| Site | Role | Location | Work | Source | Confidence |
|---|---|---|---|---|---|
| Boeing Everett factoryBoeing | Final assembly | Factory · Everett, Washington | In July 2013 KC-46A production was integrated into Boeing’s commercial 767 production line at Everett. | www.aerospacemanufacturinganddesign.com www.aerospacemanufacturinganddesign.com | — |
| Middletown Engine CenterPratt & Whitney | Component production | Factory · Middletown, Connecticut | In September 2015 U.S. Senator Chris Murphy stated that the Pratt & Whitney PW4062 engine powering the KC-46 Pegasus tanker was manufactured in Middletown, Connecticut. | www.murphy.senate.gov www.murphy.senate.gov | — |
| Spirit AeroSystems Wichita plantSpirit AeroSystems | Component production | Factory · Wichita, Kansas | In July 2013 Spirit manufactured KC-46A Section 41 forward fuselage, strut and nacelle components at Wichita, Kansas. | www.aerospacemanufacturinganddesign.com www.aerospacemanufacturinganddesign.com | — |
| Oklahoma City Air Logistics ComplexOklahoma City Air Logistics Complex | Depot sustainment | Other · Oklahoma City, Oklahoma | The Oklahoma City Air Logistics Complex at Tinker Air Force Base performs programmed depot maintenance and modifications on KC-46, KC-135, B-1B, B-52, E-3 and Navy E-6 aircraft. | www.tinker.af.mil www.tinker.af.mil | — |
| Collins Aerospace avionics and mission systemsRTX | Other | Office · Cedar Rapids, Iowa | In January 2021 Military & Aerospace Electronics reported that the Raytheon Collins Aerospace segment in Cedar Rapids, Iowa, provides the KC-46 integrated display system. | www.militaryaerospace.com www.militaryaerospace.com | — |
| GE Aviation Systems Grand Rapids facilityGE Aviation Systems LLC | Other | Other · Grand Rapids, Michigan | In January 2021 Military & Aerospace Electronics reported that GE Aviation Systems facilities in Grand Rapids, Michigan, and Clearwater, Florida, provide the KC-46 mission control system avionics. | www.militaryaerospace.com www.militaryaerospace.com | — |
| Honeywell Aerospace Phoenix facilityHoneywell Aerospace | Other | Other · Phoenix, Arizona | In January 2021 Military & Aerospace Electronics reported that Honeywell Aerospace's facility in Phoenix provides the KC-46 auxiliary power unit. | www.militaryaerospace.com www.militaryaerospace.com | — |
- Final assembly
- Component production
- Component production
- Depot sustainment
Plants, shipyards, final-assembly lines, test sites and depots that build or sustain the program, and the work done at each.
Who Operates It4
| Country | Service | Relationship | Quantity | Note | Source | Confidence |
|---|---|---|---|---|---|---|
| Japan | Japan Air Self-Defense Force | Operator | No count statedas of 2025 | Boeing reported six KC-46A tankers delivered to the Japan Air Self-Defense Force, as of its November 2025 contract release. | boeing.mediaroom.com boeing.mediaroom.com | — |
| United States | U.S. Air Force | Operator | 98 units deliveredas of 2025 | Boeing reported 98 KC-46A tankers delivered to the U.S. Air Force, as of its November 2025 contract release. | boeing.mediaroom.com boeing.mediaroom.com | — |
| Israel | Israel Air Force | Customer | No count statedas of 2025 | Boeing reported four KC-46A tankers contracted for the Israel Air Force, as of its November 2025 contract release. | boeing.mediaroom.com boeing.mediaroom.com | — |
| Japan | — | Planned operator | 9 units authorizedas of 2024 | In a September 2024 DSCA notification, the Government of Japan requested to buy up to nine KC-46A aircraft. | media.defense.gov media.defense.gov | — |
- JapanOperator
- United StatesOperator
- IsraelCustomer
- JapanPlanned operator
Countries and services that operate or have bought the product. A quantity is the count a source states, labelled delivered, in service, ordered, planned or authorized with the year it is stated for; an ordered, planned or authorized count is not a delivery.
Company-reported Charges10
| Company | Fiscal year | Amount | As the filing names it | Source |
|---|---|---|---|---|
| Boeing | FY2023Year ended Dec 31, 2023 | $309Mcompany-reported chargeEstimated | KC-46A Tanker programIncrease in reach-forward loss; sentence omits the unit, read as $ millions. The sentence gives the amount with no unit; it is read as millions of dollars, the unit of the filing's other figures. | Boeing annual report (Form 10-K) for the period ended 2023-12-31 U.S. Securities and Exchange Commission · Jan 31, 2024 |
| Boeing | FY2022Year ended Dec 31, 2022 | $1.37Bcompany-reported charge | KC-46A TankerCharges (fixed price development programs). | Boeing annual report (Form 10-K) for the period ended 2022-12-31 U.S. Securities and Exchange Commission · Jan 27, 2023 |
| Boeing | FY2021Year ended Dec 31, 2021 | $402Mcompany-reported charge | KC-46A Tanker programIncrease in reach-forward loss. | Boeing annual report (Form 10-K) for the period ended 2021-12-31 U.S. Securities and Exchange Commission · Jan 31, 2022 |
| Boeing | FY2020Year ended Dec 31, 2020 | $1.32Bcompany-reported charge | KC-46A Tanker programReach-forward losses. | Boeing annual report (Form 10-K) for the period ended 2020-12-31 U.S. Securities and Exchange Commission · Feb 1, 2021 |
| Boeing | FY2019Year ended Dec 31, 2019 | $148Mcompany-reported charge | KC-46A Tanker programReach-forward losses (2019 figure, first of three years). | Boeing annual report (Form 10-K) for the period ended 2019-12-31 U.S. Securities and Exchange Commission · Jan 31, 2020 |
| Boeing | FY2018Year ended Dec 31, 2018 | $736Mcompany-reported charge | USAF KC-46A Tanker contractReach-forward losses. | Boeing annual report (Form 10-K) for the period ended 2018-12-31 U.S. Securities and Exchange Commission · Feb 8, 2019 |
| Boeing | FY2017Year ended Dec 31, 2017 | $471Mcompany-reported charge | USAF KC-46A Tanker contractReach-forward losses. | Boeing annual report (Form 10-K) for the period ended 2017-12-31 U.S. Securities and Exchange Commission · Feb 12, 2018 |
| Boeing | FY2016Year ended Dec 31, 2016 | $1.13Bcompany-reported charge | USAF KC-46A Tanker contractReach-forward loss. | Boeing annual report (Form 10-K) for the period ended 2016-12-31 U.S. Securities and Exchange Commission · Feb 8, 2017 |
| Boeing | FY2015Year ended Dec 31, 2015 | $835Mcompany-reported charge | USAF KC-46A Tanker contractReach-forward loss. | Boeing annual report (Form 10-K) for the period ended 2015-12-31 U.S. Securities and Exchange Commission · Feb 10, 2016 |
| Boeing | FY2014Year ended Dec 31, 2014 | $425Mcompany-reported charge | USAF KC-46A Tanker contractReach-forward loss. | Boeing annual report (Form 10-K) for the period ended 2014-12-31 U.S. Securities and Exchange Commission · Feb 12, 2015 |
- Estimated$309Mcompany-reported charge
- $1.37Bcompany-reported charge
- $402Mcompany-reported charge
- $1.32Bcompany-reported charge
- $148Mcompany-reported charge
- $736Mcompany-reported charge
- $471Mcompany-reported charge
- $1.13Bcompany-reported charge
- $835Mcompany-reported charge
- $425Mcompany-reported charge
Losses and charges a company states in its annual report (Form 10-K) for this program, in the company's own words and at the amount it gives for that fiscal year. A company-reported charge is not obligated, enacted or requested money and not an announced ceiling; it is never added to the obligations above. Where a sentence gives more than one figure for the program in a year, only the first is listed and the note says so.
Budget Lines
- 0401221F
- APAF P-1 line 10
- APAF P-1 line 37
Budget line items recorded for this program.