

Startup · United States
Kairos Power
HQ Alameda, CaliforniaFounded 2016501-1000 employeesUpdated
Developer of the fluoride salt-cooled high-temperature reactor (KP-FHR) using TRISO pebble fuel; building the Hermes demonstration reactors in Oak Ridge, Tennessee, and named an eligible vendor in DIU's ANPI program.
Federal Obligations by Year (In-Scope USAspending, as Reported at the Time)
FY2025
- Direct: assistance
- $35.0M obligated · as of Oct 6, 2026
FY2024
- Direct: assistance
- $100M obligated · as of Oct 6, 2026
FY2023
- Direct: assistance
- $0 obligated · as of Oct 6, 2026
FY2022
- Direct: assistance
- $0 obligated · as of Oct 6, 2026
FY2021
- Direct: assistance
- $0 obligated · as of Oct 6, 2026
Direct is the company's own reviewed UEIs. Reported by USAspending is subsidiaries as reported by USAspending: recipients that name this company as their parent, not yet reviewed ownership.
Directly matched recipients (up to 12)
UEIs matched to this organization, largest obligations first. Subsidiary recipients are not included in this list; their attributed obligations can appear in the company totals above.
- KAIROS POWER LLCQLJ3HALQKFH4$136M obligated in scope
Each action is credited by the ownership basis shown in its column. Reported-parent rows count for Kairos Power only for the period a subsidiary reported Kairos Power as its parent; reviewed links follow their reviewed dates. Net of de-obligations; these are obligations, not ceilings. They come from the in-scope USAspending baseline (every recipient size; contracts and assistance in the reviewed research programs) and are a separate view from the published contract catalog. Flood insurance, DHS disaster and other assistance outside the research allowlist, and non-research DoW, DOE and NASA assistance are not in these figures. Years that are not complete by the source snapshot, allowing for the 90-day publication lag, are labelled partial, and years whose DoD money is still inside the 90-day reporting delay are marked provisional.
Programs1 program
Programs1
| Program | Role | Program status | Confidence |
|---|---|---|---|
| Advanced Nuclear Power for Installations | Competing bidder | Development | Confirmed |
Capabilities4
| Technology | Role | Maturity | Notes | Confidence |
|---|---|---|---|---|
| Advanced reactor fuel fabricationNuclear energy and propulsion | Developer | Development | In-house TRISO and pebble fuel lab work for KP-FHR. | Confirmed |
| Small modular reactorsNuclear energy and propulsion | Developer | Development | KP-FHR; Hermes 2 (up to 50 MW to the TVA grid) broke ground April 2026 with NRC construction permits. | Confirmed |
| Advanced fission reactorsNuclear energy and propulsion | Developer | Development | Develops a fluoride salt-cooled high-temperature fission reactor, with demonstration plants under construction. |
- DevelopmentConfirmed
- DevelopmentConfirmed
- Development
Sectors: Nuclear energy and propulsion
Maturity and TRL describe this organization's work; a muted maturity is the field-wide level, shown when none is stated for this organization. TRL appears only where a source states it.
Funding2 rounds · $70.0M
- Equity raised
- $70.0M
- Debt, secondaries & grants
- $16K
- Latest
- $70.0MStrategic · Sep 21, 2026
| Announced | Stage | Amount | Valuation | Lead investors | Other investors | Confidence |
|---|---|---|---|---|---|---|
| Sep 21, 2026 | Strategic | $70.0M | — | — | — | Reported |
| Jun 3, 2022 | Grant | $16K | — | — | — | Reported |
- Strategic$70.0MSep 21, 2026
- Grant$16KJun 3, 2022
Raised counts equity rounds; debt, secondary sales and grants are totaled separately. Amounts in other currencies are converted at the announcement month's average rate. A ~ marks an estimated or converted amount.
Systems1
- Hermes 2 Demonstration reactor intended to supply electricity to the grid.Development—
Newest unveiled first. Systems that belong to a government program link to the program page, where variants, costs and contracts are.
Supply Chain1 facility
Facilities1
| Facility | Kind | Location | Status | Confidence |
|---|---|---|---|---|
| Kairos Power Alameda headquarters and RAPID/Salt labs | Headquarters | Alameda, California | Operating | Confirmed |
- Kairos Power Alameda headquarters and RAPID/Salt labsConfirmed
People6
| Person | Role |
|---|---|
| Edward Blandford · LinkedIn ↗ |
|
| Mike Laufer · LinkedIn ↗ |
|
| Per Peterson · LinkedIn ↗ |
|
| Craig Gerardi · LinkedIn ↗ |
|
| Ignacio Redondo |
|
| Jeffrey Olson · LinkedIn ↗ |
|
Hiring Observations
Sign in to see hiring observations
Use the official careers site for current openings and application requirements.
Company Metrics
- LinkedIn employee profiles
- 523
- Observed Oct 23, 2026
Bright Data / LinkedIn - LinkedIn followers
- 46,590
- Observed Oct 23, 2026
Bright Data / LinkedIn
Observation history
- Oct 23, 2026 · LinkedIn employee profiles: 523
- Oct 23, 2026 · LinkedIn followers: 46,590
- Oct 11, 2026 · LinkedIn employee profiles: 521
- Oct 11, 2026 · LinkedIn followers: 46,287
Employee-profile counts reflect LinkedIn profiles associated with the company, not verified headcount. One observation establishes a baseline; it does not establish growth.
Sources16
Show all 16 sources and supporting evidence
Profile6
- 1
Kairos Power · Sep 21, 2026 · Supports Organization · news event
“Samsung C&T has agreed to provide up to $100 million through a combination of direct investment and in-kind engineering services, subject to regulatory approvals, to enable the successful delivery of the Hermes 2 Demonstration Plant in Oak Ridge, Tennessee.”
- 2
Kairos Power · Sep 4, 2026 · Supports Organization · news event
“Kairos Power completed the first phase of its Engineering Test Unit 3 demonstration in Oak Ridge, Tennessee.”
- 3
Defense Innovation Unit · Apr 10, 2025 · Supports Organization
“Selected companies for the ANPI program include: - Antares Nuclear, Inc - BWXT Advanced Technologies LLC - General Atomics Electromagnetic Systems - Kairos Power, LLC - Oklo Inc. - Radiant Industries Incorporated - Westinghouse Government Services - X-Energy, LLC”
- 4Government recordSAM.gov entity registration: KAIROS POWER LLC
SAM.gov · Supports Organization · legal name
“KAIROS POWER LLC; uei: QLJ3HALQKFH4; CAGE 80S35; registration A, initial registration 20260708, expires 20270826 (SAM.gov public entity extract SAM_PUBLIC_MONTHLY_V2_20261101_34d1638de9a54f41a9d02ea74d800cc3.dat, retrieved 2026-11-13)”
- 5CompanyAbout | Kairos Power
Kairos Power · Supports Organization · hq city
“Our headquarters in Alameda anchors a national footprint”
- 6
Systems1
- 7
Kairos Power · Apr 17, 2026 · Supports Organization · founded year, Organization technology, System
“Founded in 2016, the company is unique in applying a rapid iterative development approach and vertical integration strategy”
Technologies3
- 8CompanyCompany website
Supports Organization technology · technology
“We're making reactor components, plant equipment modules, fuel, and molten salt coolant in-house to control quality and drive down costs.”
- 9
Kairos Power · Supports Organization · website, Organization technology
“Our fluoride salt-cooled high-temperature reactor closes the gap between vision and commercial viability.”
- 10Government recordHermes 2 – Kairos Application
U.S. Nuclear Regulatory Commission · Supports Organization technology
“The U.S. Nuclear Regulatory Commission (NRC) issued construction permits for the Hermes 2 test reactor facility to Kairos Power LLC on November 21, 2024”
Each fact on this page is attached to the sources that support it. Archived copies are linked when we keep one.
