Contracts$3.00B obligated since FY2008
Contractors13
- Lockheed Martin$1.92B 64%
- RTX$586M 20%
- BAE Systems$214M 7.1%
- Northrop Grumman$210M 7.0%
- GE Aerospace$26.4M 0.9%
- Moog$15.4M 0.5%
- General Dynamics$12.6M 0.4%
- Boeing$6.5M 0.2%
- Teledyne Technologies$5.2M 0.2%
- Booz Allen Hamilton$550K 0.0%
- Leidos$200K 0.0%
- Viasat$5K 0.0%
Awards50
- Lockheed MartinACQUISITION AND SHIPPING OF ARC-238 RADIOS WITH SATURN EDITION 4 CAPABILITY AND SUPPORT EQUIPMENT.U.S. Air Force · Definitive Contract · Apr 9, 2026$15.7Mobligated · up to $15.7M ceiling
- Lockheed MartinF-16 AIRCRAFT STRUCTURAL INTEGRITY PROGRAM (ASIP) (2026)U.S. Air Force · Delivery Order · Mar 31, 2026$23.7Mobligated · up to $25.2M ceiling
- Lockheed MartinARGENTINA F-16 M6 OFP UPDATEU.S. Air Force · Definitive Contract · Mar 17, 2025$53.7Mobligated · up to $266M ceiling
- Lockheed MartinFOREIGN MILITARY SALE TO IRAQ OF INTEGRATION SERVICES FOR THE ADVANCED INTEGRATED DEFENSIVE ELECTRONIC WARFARE SUITEU.S. Air Force · Delivery Order · Sep 30, 2024$13.5Mobligated · up to $13.5M ceiling
- Lockheed MartinARTEMISU.S. Air Force · Delivery Order · Jul 21, 2022$709Mobligated · up to $943M ceiling
- Northrop Grumman Systems CorporationIGF::CL,CT::IGF ENGINEERING SERVICES F-16 OPERATIONAL FLIGHT PROGRAM AFGC-8-V1 RADAR POST PRODUCTION SUPPORTU.S. Air Force · Delivery Order · Sep 29, 2014$11.8Mobligated · up to $12.1M ceiling
- Lockheed MartinIGF::CL,CT::IGF ENGINEERING SERVICES FOR F-16 AIR STRUCTURAL INTEGRITY PROGRAM (ASIP)U.S. Air Force · Delivery Order · Mar 12, 2014$21.1Mobligated · up to $12.4M ceiling
- Lockheed MartinIGF::CL,CT::IGF F-16 FALCON 2020 OGDEN ON-SITE SUPPORT, FISCAL YEAR 2014 POP 1 MARCH 2014 TO 28 FEBRUARY 2015U.S. Air Force · Delivery Order · Feb 26, 2014$25.0Mobligated · up to $25.0M ceiling
- Lockheed MartinIGF::CL,CT::IGF ENGINEERING SERVICES FOR F-16 SUSTAINMENT -FALCON 2020 COREU.S. Air Force · Delivery Order · Feb 25, 2014$61.9Mobligated · up to $48.9M ceiling
- RTXACES II EJECTION SEATS AS NEW INSTALLS FOR F-16C/D PORDUCTION AIRCRAFT. (OMAN / IRAQ)Defense Logistics Agency · Definitive Contract · Jan 30, 2014$8.8Mobligated
- Lockheed MartinIGF::OT::IGF THIS TASK ORDER IS FOR PHASE II OF THE THAILAND F-16 MID-LIFE UPDATE (MLU).U.S. Air Force · Delivery Order · Oct 4, 2013$115Mobligated · up to $115M ceiling
- Lockheed MartinIGF::CL,CT::IGF FALCON 2020 OGDEN ON-SITE ENGINEERING/TECHNICAL LABOR SUPPORT FOR F-16 AIRCRAFT, FISCAL YEAR 2013 POP 1 MARCH 2013 TO 28 FEBRUARY 2014U.S. Air Force · Delivery Order · Mar 14, 2013$17.7Mobligated · up to $17.3M ceiling
- Lockheed MartinIGF::CT::IGF AIRCRAFT STRUCTURAL INTEGRITY PROGRAMU.S. Air Force · Delivery Order · Feb 28, 2013$20.2Mobligated · up to $20.6M ceiling
- Collins AerospaceDELIVERY ORDER AGAINST GOODRICH SSI CONTRACT TO PROCURE SPARES FOR THE F-16 WEAPON SYSTEM.U.S. Air Force · Delivery Order · Nov 19, 2012$8.8Mobligated · up to $8.8M ceiling
- BAE Systems Information and Electronic Systems Integration Inc.UNDEFINITIZED CONTRACTUAL ACTION FOR F-16 SUPPORT EQUIPMENT FOR IRAQ.U.S. Air Force · Definitive Contract · Nov 13, 2012$31.5Mobligated
- BAE Systems Information and Electronic Systems Integration Inc.UNDEFINITIZED CONTRACT ACTION (UCA) FOR THE PURCHASE OF SUPPORT EQUIPMENT FOR THE COUNTRY OF INDONESIA.U.S. Air Force · Definitive Contract · Oct 29, 2012$24.3Mobligated
- BAE Systems Information and Electronic Systems Integration Inc.F-16 FMS SUPPORT EQUIPMENT AND SUPPORT EQUIPMENT SPARES FOR OMAN.U.S. Air Force · Definitive Contract · Oct 22, 2012$20.7Mobligated
- Lockheed MartinIGF::OT::IGF INDONESIA AVIONICS UPGRADE AND WING REFURBISHMENT PROGRAMU.S. Air Force · Delivery Order · May 23, 2012$118Mobligated · up to $118M ceiling
- Lockheed MartinF-16 ON-SITE TASK ORDER REQUEST (FOSTR) FY12 1 MARCH 2012 TO 28 FEBRUARY 2013U.S. Air Force · Delivery Order · Apr 2, 2012$16.1Mobligated
- Lockheed MartinFALCON 2020 ASIP FY12 SUPPORTU.S. Air Force · Delivery Order · Mar 8, 2012$21.4Mobligated
- Lockheed MartinSUSTAINMENT ENGINEERING SERVICES TO ENSURE INTEGRITY, MISSION READINESS, SUSTAINABILITY, RELIABILITY, AND MAINTAINABILITY OF THE F-16 WEAPON SYSTEM.U.S. Air Force · Delivery Order · Mar 7, 2012$59.3Mobligated · up to $1.9M ceiling
- Lockheed MartinF-16 TECH ORDER SUSTAINMENTU.S. Air Force · Delivery Order · Mar 6, 2012$11.8Mobligated · up to $559K ceiling
- Lockheed MartinF-16 A/B MID-LIFE UPDATE ENGINEERING SERVICES OF 6 F-16'S.U.S. Air Force · Delivery Order · Jun 23, 2011$80.8Mobligated · up to $174M ceiling
- Lockheed MartinEXCEPTION: ENGINEERING SERVICES ON MILITARY AND AEROSPACE EQUIPMENT AND MILITARY WEAPONSU.S. Air Force · Delivery Order · May 26, 2011$20.5Mobligated · up to $19.2M ceiling
- Lockheed MartinF4262001D0058U.S. Air Force · Delivery Order · Apr 28, 2011$34.5Mobligated · up to $40.3M ceiling
- Lockheed MartinTECHNICAL MAINTENANCEU.S. Air Force · Delivery Order · Apr 7, 2011$12.3Mobligated
- Lockheed MartinPRODUCTION OF BLOCK 32 AVIONICS UPGRADE KITSU.S. Air Force · Delivery Order · Mar 10, 2011$68.0Mobligated · up to $68.0M ceiling
- Lockheed MartinENGINEERING SERVICESU.S. Air Force · Delivery Order · Oct 26, 2010$15.0Mobligated · up to $15.0M ceiling
- RTXF-16 CENTER DISPLAY UNIT CDUU.S. Air Force · Delivery Order · Oct 5, 2010$63.8Mobligated · up to $296K ceiling
- Lockheed MartinENGINEERING SERVICESU.S. Air Force · Delivery Order · Sep 30, 2010$13.7Mobligated · up to $18.4M ceiling
- Lockheed MartinOTHER AIRCRAFT EQUIPMENTU.S. Air Force · Delivery Order · Aug 31, 2010$14.0Mobligated · up to $39.8M ceiling
- Lockheed MartinSYSTEMS ENGINEERING IN SUPPORT OF: FALCON 2020 ASIPU.S. Air Force · Delivery Order · Feb 28, 2010$9.5Mobligated · up to $10.5M ceiling
- Lockheed MartinFALCON 2020 FY 2010 CORE TASK ORDERU.S. Air Force · Delivery Order · Feb 26, 2010$58.9Mobligated · up to $78.1M ceiling
- RTXSEAT, AIRCRAFT EJECTION (ACES II FWD)U.S. Air Force · Definitive Contract · Sep 15, 2009$12.4Mobligated
- RTXCORE MODULE (F100-229)U.S. Air Force · Delivery Order · Sep 11, 2009$20.5Mobligated
- Collins AerospaceCONTROL UNIT,SUPERVDefense Logistics Agency · Definitive Contract · Aug 31, 2009$12.1Mobligated
- BAE Systems Information and Electronic Systems Integration Inc.SST INSTRUMENT UNITU.S. Air Force · Delivery Order · Aug 14, 2009$22.0Mobligated
- RTXCORE MODULE (F100-229)U.S. Air Force · Delivery Order · Apr 22, 2009$34.4Mobligated
- Lockheed MartinASIP ENGINEERING SERVICESU.S. Air Force · Delivery Order · Feb 27, 2009$9.1Mobligated · up to $11.2M ceiling
- RTXCORE MODULE (F100-229)U.S. Air Force · Delivery Order · Dec 22, 2008$19.5Mobligated
- Northrop Grumman Systems CorporationELECTRONIC ASSY. SETDefense Logistics Agency · Delivery Order · Sep 29, 2008$56.7Mobligated
- Collins AerospaceBRAKE,MULTIPLE DISKDefense Logistics Agency · Delivery Order · Sep 26, 2008$18.5Mobligated · up to $18.5M ceiling
- BAE Systems Information and Electronic Systems Integration Inc.SST INSTRUMENT UNITU.S. Air Force · Delivery Order · Sep 25, 2008$13.4Mobligated
- GE AerospaceMDECDefense Logistics Agency · Delivery Order · Sep 16, 2008$26.0Mobligated
- BAE Systems Information and Electronic Systems Integration Inc.SST INSTRUMENT UNITU.S. Air Force · Delivery Order · Sep 16, 2008$9.2Mobligated
- BAE Systems Information and Electronic Systems Integration Inc.SST I-LEVEL ADAPTER SETU.S. Air Force · Delivery Order · Aug 1, 2008$25.6Mobligated
- RTXCORE MODULE (F100-229)U.S. Air Force · Delivery Order · Jul 21, 2008$14.6Mobligated
- Lockheed MartinF-16 TECHNICAL ORDER MAINTENANCE, REPRINT SUPPORTU.S. Air Force · Delivery Order · Jun 30, 2008$18.3Mobligated · up to $18.0M ceiling
- RTXCORE MODULE (F100-229)U.S. Air Force · Delivery Order · May 7, 2008$9.0Mobligated
- RTXCORE MODULE (F100-229)U.S. Air Force · Delivery Order · Oct 22, 2007$21.1Mobligated
Obligations are signed USAspending prime-contract actions coded to this program, FY2008 to date, credited to the company that received each action. Obligations are money committed, not company revenue.
