Budget tracker
AH-64E Apache
AH-64E Apache figures from run 242 cover R-1 program elements 0607145A; P-1 lines 2031 AH-64 MODS. The AH-64 Block IIIA remanufacture line is not included. Obligations are only the USAspending awards carrying reviewed DoD acquisition program code 202 (AH-64E REMANUFACTURE), 437 (AH-64E NEW BUILD). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.
By Fiscal Year
FY2025
- Requested
- Not yet researched
- Enacted
- $102M$102,069,000
Appropriation
- Procurement · 2031 AH-64 MODS · Appropriation · $93.8M
- RDT&E · 0607145A · Appropriation · $8.2M
- Announced ceiling (not spending)
- Announced ceiling: Not yet researched
- Obligated
- $507M$507,364,971.74
60 linked awards, 141 actions
FY2026
- Requested
- $170M$169,607,000
President's budget
- Procurement · 2031 AH-64 MODS · Discretionary · President's budget · $125M
- RDT&E · 0607145A · Discretionary · President's budget · $44.4M
- Enacted
- $176M$175,607,000
Appropriation
- Procurement · 2031 AH-64 MODS · Discretionary · Appropriation · $131M
- RDT&E · 0607145A · Discretionary · Appropriation · $44.4M
- Announced ceiling (not spending)
- Announced ceiling: Not yet researched
- Obligated
- $253M$253,071,863.53
52 linked awards, 92 actions · partial year
FY2027
- Requested
- $282M$282,404,000
President's budget
- Procurement · 2031 AH-64 MODS · Discretionary · President's budget · $252M
- RDT&E · 0607145A · Discretionary · President's budget · $30.8M
- Enacted
- Not yet researched
- Announced ceiling (not spending)
- Announced ceiling: Not yet researched
- Obligated
- No actions recorded on published linked awards yet
Each column is a different measure and they are not added together. A request and an enacted amount for the same year sit side by side; the request is never rewritten when an enacted amount arrives. A blank state names why there is no amount; only a stated amount, including a stated $0, shows dollars.
Sources and Evidence8
FY2025 · Enacted (Appropriation)
Procurement · 2031 AH-64 MODS
$93,826,000as printed 93,826 ($ thousands)FY 2026 Procurement Programs (P-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2025 EnactedExhibit P-1, 2031 Aircraft Procurement, FY 2026 Disc Reconciliation, line 27 AH-64 MODS, PDF page 12. Dollars in thousands. Column 'FY 2025 Enacted'.27 AH-64 MODS A U 141,402 93,826 125,236 125,236
FY2025 · Enacted (Appropriation)
RDT&E · 0607145A
$8,243,000as printed 8,243 ($ thousands)FY 2026 Research, Development, Test & Evaluation Programs (R-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2025 EnactedExhibit R-1, 2040A Research, Development, Test and Evaluation, Army, line 208 Apache Future Development, PDF page 22. Dollars in thousands. Column 'FY 2025 Enacted'.208 0607145A Apache Future Development 07 U 44,762 8,243 8,243 44,371 44,371
FY2026 · Requested (President's budget)
Procurement · 2031 AH-64 MODS · Discretionary
$125,236,000as printed 125,236 ($ thousands)FY 2026 Procurement Programs (P-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2026 Disc RequestExhibit P-1, 2031 Aircraft Procurement, FY 2026 Disc Reconciliation, line 27 AH-64 MODS, PDF page 12. Dollars in thousands. Column 'FY 2026 Disc Request'.27 AH-64 MODS A U 141,402 93,826 125,236 125,236
FY2026 · Requested (President's budget)
RDT&E · 0607145A · Discretionary
$44,371,000as printed 44,371 ($ thousands)FY 2026 Research, Development, Test & Evaluation Programs (R-1) Office of the Under Secretary of Defense (Comptroller) · document Jun 26, 2025FY2026 President's Budget (Jun 2025), column FY 2026 Disc RequestExhibit R-1, 2040A Research, Development, Test and Evaluation, Army, line 208 Apache Future Development, PDF page 22. Dollars in thousands. Column 'FY 2026 Disc Request'.208 0607145A Apache Future Development 07 U 44,762 8,243 8,243 44,371 44,371
FY2026 · Enacted (Appropriation)
Procurement · 2031 AH-64 MODS · Discretionary
$131,236,000as printed 131,236 ($ thousands)Department of War FY 2027 President's Budget, Procurement Programs (P-1) Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2026 Discretionary EnactedExhibit P-1, 2031 Aircraft Procurement, FY 2026 Discretionary FY 2026 PL 119-21 Spend FY 202, line 17 AH-64 MODS, PDF page 18. Dollars in thousands. Column 'FY 2026 Discretionary Enacted'.17 AH-64 MODS A U 93,826 131,236 131,236
FY2026 · Enacted (Appropriation)
RDT&E · 0607145A · Discretionary
$44,371,000as printed 44,371 ($ thousands)RDT&E Programs (R-1), Department of War Budget, Fiscal Year 2027 Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2026 Discretionary EnactedExhibit R-1, 2040A Research, Development, Test and Evaluation, Army, line 213 Apache Future Development, PDF page 22. Dollars in thousands. Column 'FY 2026 Discretionary Enacted'.213 0607145A Apache Future Development 07 U 7,942 44,371 44,371 30,759 30,759
FY2027 · Requested (President's budget)
Procurement · 2031 AH-64 MODS · Discretionary
$251,645,000as printed 251,645 ($ thousands)Department of War FY 2027 President's Budget, Procurement Programs (P-1) Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2027 Discretionary RequestExhibit P-1, 2031 Aircraft Procurement, 27 Discretionary FY 2027 Mandatory, line 17 AH-64 MODS, PDF page 19. Dollars in thousands. Column 'FY 2027 Discretionary Request'.17 AH-64 MODS A U 251,645 251,645
FY2027 · Requested (President's budget)
RDT&E · 0607145A · Discretionary
$30,759,000as printed 30,759 ($ thousands)RDT&E Programs (R-1), Department of War Budget, Fiscal Year 2027 Office of the Under Secretary of War (Comptroller) · document Apr 21, 2026FY2027 President's Budget (Apr 2026), column FY 2027 Discretionary RequestExhibit R-1, 2040A Research, Development, Test and Evaluation, Army, line 213 Apache Future Development, PDF page 22. Dollars in thousands. Column 'FY 2027 Discretionary Request'.213 0607145A Apache Future Development 07 U 7,942 44,371 44,371 30,759 30,759
Every figure keeps its document, date, page or table, original unit and a short excerpt. Superseded figures stay on record. Amounts are exact; compact figures round.
Linked Awards408
- COUPLING, TAILROTOR
CONT_AWD_0001_9700_SPRRA116D0021_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2016: $3,299,000
- FY2017: $0
- BELL CRANK
CONT_AWD_0001_9700_SPRRA116D0044_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $1,613,266
- FY2018: $0
- SPARE PARTS - ACTUATOR
CONT_AWD_0001_9700_SPRRA117D0038_9700
SIMMONDS PRECISION PRODUCTS INC · Program office statement
AH-64E NEW BUILD
- FY2017: $830,800
- FY2018: $0
- HIGH PERFORMANCE SHOCK STRUT
CONT_AWD_0001_9700_SPRRA117D0159_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2017: $19,730,034.24
- FY2019: −$2.20
- FY2021: $0
- PROCESSOR, SIGNAL DA
CONT_AWD_0001_9700_SPRRA117D0171_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2017: $121,937.25
- HOUSING ASSEMBLY, MA
CONT_AWD_0001_9700_SPRRA118D0032_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $2,314,816.70
- BEARING,BALL,DUPLEX
CONT_AWD_0001_9700_SPRRA118D0035_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $404,182.08
- VALVE, ANTI-ICING
CONT_AWD_0001_9700_SPRRA118D0050_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $279,500
- HOUSING, OIL SUMP. AI
CONT_AWD_0001_9700_SPRRA118D0054_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $55,560
- HOUSING,TRANSMISSION
CONT_AWD_0001_9700_SPRRA118D0071_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $667,941.28
- COVER ASSEMBLY, TRAN
CONT_AWD_0001_9700_SPRRA118D0072_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $44,429.01
- LINK ASSY,ACFT NSN: 1560-01-451-0092
CONT_AWD_0001_9700_SPRRA118D0074_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $286,239.83
- FY2020: $0
- SHAFT, ASSY
CONT_AWD_0001_9700_SPRRA118D0081_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2018: $646,768
- FY2019: $0
- FY2021: $0
- DRIVE SHAFT ASSEMBLY
CONT_AWD_0001_9700_SPRRA118D0083_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2018: $672,220
- VALVE, SOLENOID
CONT_AWD_0001_9700_SPRRA118D0089_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $278,959.20
- GEARSHAFT,BEVEL
CONT_AWD_0001_9700_SPRRA118D0098_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $21,685.24
- VALVE,SOLENOID
CONT_AWD_0001_9700_SPRRA118D0100_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $137,700
- BEARING, BALL, ANNULAR
CONT_AWD_0001_9700_SPRRA118D0101_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2018: $26,718
- FY2020: $0
- FILTER, FLUID
CONT_AWD_0001_9700_SPRRA118D0104_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $122,264
- FLOAT,VALVE
CONT_AWD_0001_9700_SPRRA118D0145_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $332,120
- FY2019: $0
- REU LOT 7-11 PRODUCTION IN SUPPORT OF PM APACHE
CONT_AWD_0001_9700_W52P1J16D0055_9700
LONGBOW LLC · Award title or description names the program
REU LOT 7-11 PRODUCTION IN SUPPORT OF PM APACHE
- FY2016: $23,388,000
- FY2018: −$2,448,508
- FY2019: $0
- FY2020: $0
- UNDEFINTIZED TASK ORDER 0001 FOR APACHE SENSORS CONTRACTOR FIELD SERVICE REPRESENTATIVE (CFSR) SUPPORT FOR CONUS AND OCONUS LOCATIONS.
CONT_AWD_0001_9700_W58RGZ15D0002_9700
LOCKHEED MARTIN CORPORATION · Award title or description names the program
UNDEFINTIZED TASK ORDER 0001 FOR APACHE SENSORS CONTRACTOR FIELD SERVICE REPRESENTATIVE (CFSR) SUPPORT FOR CONUS AND OCONUS LOCATIONS.
- FY2015: $3,779,474
- FY2016: $3,941,349
- FY2017: $0
- FY2019: −$688,896.84
- DELIVERY ORDER FOR THE OVERHAUL/REPAIR/UPGRADE OF THE AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATION KIT
CONT_AWD_0001_9700_W58RGZ16D0038_9700
DRS TRAINING & CONTROL SYSTEMS, LLC · Award title or description names the program
DELIVERY ORDER FOR THE OVERHAUL/REPAIR/UPGRADE OF THE AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATION KIT
- FY2016: $1,808,241
- FY2020: −$234,738
- FY2021: $0
- FY2022: $0
- FY2025: $0
- CALIBRATION OF INERTIAL BORESIGHT ADAPTER SYSTEM (IBAS) OF AH-64
CONT_AWD_0001_9700_W58RGZ18D0047_9700
THE BOEING COMPANY · Award title or description names the program
CALIBRATION OF INERTIAL BORESIGHT ADAPTER SYSTEM (IBAS) OF AH-64
- FY2018: $262,481.79
- FY2019: −$241,787.39
- FITTING STRUCTURAL
CONT_AWD_0002_9700_SPRRA115D0029_9700
SIKORSKY AIRCRAFT CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2016: $109,334.40
- SHOE ASSY, MAIN ROTO
CONT_AWD_0002_9700_SPRRA115D0063_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $1,331,550
- FY2017: $0
- FY2018: $0
- COUPLING, TAIL ROTOR SPARES
CONT_AWD_0002_9700_SPRRA116D0021_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2018: $1,365,394
- ACTUATOR, ELECTRO-ME
CONT_AWD_0002_9700_SPRRA117D0038_9700
SIMMONDS PRECISION PRODUCTS INC · Program office statement
AH-64E REMANUFACTURE
- FY2017: $1,246,200
- FY2019: −$41,001
- SPARES
CONT_AWD_0002_9700_SPRRA118D0083_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2018: $672,220
- FY2020: $0
- FY2021: $0
- FY2023: $0
- RADAR ELECTRONIC UNITS PRODUCTION USG LOT 8 AND FMS REQUIREMENTS
CONT_AWD_0002_9700_W52P1J16D0055_9700
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2018: $150,597,812.50
- FY2019: $2,372,920.96
- FY2020: $1,064,608.24
- FY2026: −$195,912
- PAINT AND BALANCE PM BLADES.
CONT_AWD_0002_9700_W58RGZ13D0140_9700
COMPOSITE TECHNOLOGY, INC. · Program office statement
AH-64E REMANUFACTURE
- FY2015: $25,434.57
- FY2017: −$9,845.64
- PROCUREMENT OF 200 EACH FORMER, AIRCRAFT.
CONT_AWD_0002_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2014: $11,158
- CFSR SENSORS SUPPORT FOR AH-64E CONUS/OCONUS.
CONT_AWD_0002_9700_W58RGZ15D0002_9700
LOCKHEED MARTIN CORPORATION · Award title or description names the program
CFSR SENSORS SUPPORT FOR AH-64E CONUS/OCONUS.
- FY2016: $3,595,607
- FY2017: $0
- FY2019: −$470,500.32
- LCT ENHANCEMENTS FOR AH-64E HELICOPTER.
CONT_AWD_0002_9700_W58RGZ15G0006_9700
THE BOEING COMPANY · Award title or description names the program
LCT ENHANCEMENTS FOR AH-64E HELICOPTER.
- FY2018: $9,224,969
- FY2019: $0
- FY2020: $0
- FY2024: −$8,062
- SUPPLY FIRM FIXED PRICE CONTRACT FOR MAINTENANCE OVERHAUL OF VALVE HEAT, CONTROL.
CONT_AWD_0002_9700_W58RGZ17D0021_9700
MOOG INC · Program office statement
AH-64E REMANUFACTURE
- FY2018: $150,891
- PROCESSOR, SIGNAL DA
CONT_AWD_0003_9700_SPRRA115D0030_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2017: $2,359,649
- FY2018: $0
- ACTUATOR, ELECTRO- ME
CONT_AWD_0003_9700_SPRRA117D0038_9700
SIMMONDS PRECISION PRODUCTS INC · Program office statement
AH-64E REMANUFACTURE
- FY2018: $2,077,000
- FY2020: −$43,748
- FY2021: −$1,080
- DELIVERY ORDER 0003 TO BASIC CONTRACT W58RGZ12D0145.
CONT_AWD_0003_9700_W58RGZ12D0145_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2015: $567,045
- FY2016: $0
- AWARD OF TASK ORDER 0003 - AN/APR-39D(V)2; W58RGZ-14-D-0045
CONT_AWD_0003_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $6,113,982.87
- FY2016: $1,959,423.58
- FY2017: $970,781.40
- FY2018: $1,305,708.57
- FY2019: $468,914
- FY2020: −$9,025
- FY2021: −$19,160.46
- FY2022: −$186,487.20
- FY2023: −$867,594.97
- FY2024: $0
- LCT ENHANCEMENTS GENERATION 4 AND 5 V14 NRE AND FIELDING FOR THE AH-64, APACHE ATTACK HELICOPTER
CONT_AWD_0003_9700_W58RGZ15G0006_9700
THE BOEING COMPANY · Award title or description names the program
LCT ENHANCEMENTS GENERATION 4 AND 5 V14 NRE AND FIELDING FOR THE AH-64, APACHE ATTACK HELICOPTER
- FY2018: $6,494,713
- FY2019: $0
- FY2020: $784,000
- FY2021: $76,611
- FY2022: $0
- FIRM FIXED PRICE DELIVERY TO SUPPORT
CONT_AWD_0003_9700_W58RGZ16D0098_9700
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2018: $1,400,545
- FY2019: −$3,036
- PROCESSOR,SIGNAL DA
CONT_AWD_0004_9700_SPRRA115D0030_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2018: $6,050,355
- HIADC PHASE I
CONT_AWD_0004_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $7,058,556.61
- FY2017: $0
- FY2018: $160,000
- FY2019: $0
- FY2023: −$481,743.04
- IMPROVEMENTS TO HYDRAULIC SERVO
CONT_AWD_0005_9700_W58RGZ10G0006_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2012: $1,030,970
- FY2014: $0
- AWARD OF TASK ORDER 0005 - IDM INTEGRATION; W58RGZ-14-D-0045
CONT_AWD_0005_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $19,334,283.80
- FY2017: $0
- FY2018: $55,111.35
- FY2019: $93,889.31
- FY2020: −$6,633,261.22
- FY2021: $0
- FY2022: $0
- FY2023: $0
- FY2024: $0
- FY2026: $0
- IGF::OT::IGF
CONT_AWD_0006_9700_W58RGZ13D0119_9700
HII MISSION TECHNOLOGIES CORP · Program office statement
AH-64E REMANUFACTURE
- FY2014: $2,579,533.98
- FY2015: $0
- FY2016: $0
- AWARDS OF TASK ORDER FOR LONGBOW CREW TRAINING DEVICE SUITE FOR FMS CUSTOMER OF UK
CONT_AWD_0006_9700_W58RGZ13D0145_9700
ROCKWELL COLLINS SIMULATION & TRAINING SOLUTIONS LLC · Program office statement
AH-64E REMANUFACTURE
- FY2020: $0
- CORROSION PREVENTION ACTION TEAM (CPAT) REQUIRED TO ADDRESS AH-64 PLATFORM CORROSION ISSUES.
CONT_AWD_0006_9700_W58RGZ15G0001_9700
THE BOEING COMPANY · Award title or description names the program
CORROSION PREVENTION ACTION TEAM (CPAT) REQUIRED TO ADDRESS AH-64 PLATFORM CORROSION ISSUES.
- FY2017: $188,621
- FY2018: $187,124
- FY2019: $195,374
- SUPPLY FIRM FIXED PRICE DELIVERY ORDER DISPLAY UNIT
CONT_AWD_0006_9700_W58RGZ16D0096_9700
ROCKWELL COLLINS, INC. · Program office statement
AH-64E NEW BUILD
- FY2020: −$0.01
- NEW DELIVERY ORDER FOR SERVICE KIT.
CONT_AWD_0008_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2015: $44,794.25
- IGF::OT::IGF
CONT_AWD_0010_9700_W58RGZ13D0119_9700
HII MISSION TECHNOLOGIES CORP · Program office statement
AH-64E NEW BUILD
- FY2015: $2,679,145.28
- FY2016: $1,165,207.10
- FY2017: $0
- ISSUE OF NEW DELIVERY ORDER FOR CONNECTING LINK.
CONT_AWD_0010_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $519,792
- STRUCTURAL USAGE MONITORING SYSTEM (SUMS)
CONT_AWD_0011_9700_W58RGZ07D0251_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2009: $315,431
- FY2010: $0
- FY2011: $0
- AWARD OF TASK ORDER 0011 - ITEP; W58RGZ-14-D-0045
CONT_AWD_0011_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $9,524,958.09
- FY2016: $0
- FY2017: $0
- FY2018: $0
- FY2021: −$173,954.53
- NOUN: ROTARY RUDDER BLADE, NSN: 1615-01-312-2387, PART NUMBER 7-311422050-7, FOR A QUANTITY OF 450 EACH
CONT_AWD_0011_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $9,628,650
- 195 EACH EMERGENCY LOCATOR TRANSMITTERS
CONT_AWD_0012_9700_W58RGZ10G0004_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2012: $848,000
- FY2013: $0
- PROCUREMENT OF 231 COMPOSITE MAIN ROTOR BLADES AND ASSOCIATED PGSE FOR THE APACHE HELICOPTER
CONT_AWD_0013_9700_W58RGZ10G0006_9700
THE BOEING COMPANY · Award title or description names the program
PROCUREMENT OF 231 COMPOSITE MAIN ROTOR BLADES AND ASSOCIATED PGSE FOR THE APACHE HELICOPTER
- FY2013: $37,033,510.40
- FY2014: $0
- FY2015: $0
- FY2017: −$66,905.40
- STRUCTURES TEST AIRCRAFT IDIQ TASK ORDER AWARD
CONT_AWD_0013_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $6,067,056.35
- FY2016: $0
- FY2017: $176,040.02
- FY2018: −$37,751.20
- FY2021: $0
- FY2022: −$43.14
- EXECUTING NEW DELIVERY ORDER FOR THE ADAPTER SET, AIRCRAFT.
CONT_AWD_0013_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2015: $1,012,464
- PRIORITY PARTS TESTING
CONT_AWD_0015_9700_W58RGZ07D0251_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2010: $1,867,194
- FY2011: $1,268,007.71
- FY2016: $0
- IGF::OT::IGF
CONT_AWD_0015_9700_W58RGZ13D0119_9700
HII MISSION TECHNOLOGIES CORP · Program office statement
AH-64E NEW BUILD
- FY2016: $2,627,135.40
- FY2017: $941,834.37
- FY2018: $0
- FY2022: −$5,242.02
- T700 ENGINE POWER ASSURANCE TECH APPROACH
CONT_AWD_0016_9700_W58RGZ07D0251_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2010: $91,017
- FY2013: −$0.28
- GREECE AH-64A MODIFICATION KITS
CONT_AWD_0016_9700_W58RGZ10G0006_9700
THE BOEING COMPANY · Award title or description names the program
GREECE AH-64A MODIFICATION KITS
- FY2015: $18,322.40
- TASK ORDER FOR MMP VERSION 4.5
CONT_AWD_0016_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $5,020,571
- FY2018: $0
- FY2019: −$31,604.99
- TASK ORDER AWARD FOR APACHE AH-64E JAGM SOFTWARE INTEGRATION.
CONT_AWD_0017_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER AWARD FOR APACHE AH-64E JAGM SOFTWARE INTEGRATION.
- FY2016: $7,930,000
- FY2017: $7,100,840
- FY2018: $4,832,343.99
- FY2019: $8,051,499.02
- FY2023: −$1,344,317.55
- FY2025: −$41,917.34
- FY2026: $0
- DELIVERY ORDER FOR THE CALIBRATION OF 8 ASSETS IN SUPPORT OF THE IFTE MISSILE SYSTEM.
CONT_AWD_0019_9700_W31P4Q13D0038_9700
NORTHROP GRUMMAN SYSTEMS CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2016: $62,824
- FY2021: −$40,300
- NON-RECURRING ENGINEERING LABOR/MATERIAL TO PRODUCTIONIZE THE MATERIAL, PROCESSES, DOCUMENTATION, AND DRAWINGS ASSOCIATED WITH DURABILITY PAINT FOR AH 64D AND AH 64E APACHE MAIN ROTOR BLADES AND COMPOSITE MAIN ROTOR BLADES FOR USG CONFIGURATION ONLY.
CONT_AWD_0019_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Award title or description names the program
NON-RECURRING ENGINEERING LABOR/MATERIAL TO PRODUCTIONIZE THE MATERIAL, PROCESSES, DOCUMENTATION, AND DRAWINGS ASSOCIATED WITH DURABILITY PAINT FOR AH 64D AND AH 64E APACHE MAIN ROTOR BLADES AND COMPOSITE MAIN ROTOR BLADES FOR USG CONFIGURATION ONLY.
- FY2019: $1,199,795
- FY2020: $0
- FY2024: −$541,075
- FY2025: −$27,921.80
- NOUN: M/R STRAP PACK ASSEMBLY NSN: 1615015017715 QUANTITY: 1,060 EACH
CONT_AWD_0020_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $15,340,002
- FY2016: $0
- FY2017: $0
- MAINTENANCE OF M230 GUN TEST STAND
CONT_AWD_0021_9700_W58RGZ07D0251_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2011: $30,843
- FY2015: −$236.07
- THIS IS THE AWARD OF TASK ORDER 0021 UNDER CONTRACT W58RGZ-14-D-0045, IN SUPPORT OF THE APACHE LOSS MODEL STATEMENT OF WORK. THE PURPOSE OF THIS TASK ORDER IS TO DEVELOP A FAULT LOSS TREE MODEL FOR THE APACHE AH-64E WHICH WILL DEFINE THE RELATIONSHIPS BETWEEN THE INDIVIDUAL HAZARDS, THEIR CONTROL MEASURES, THEIR TECHNICAL CAUSES AND THE POTENTIAL ACCIDENTS THAT MAY ARISE.
CONT_AWD_0021_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Award title or description names the program
THIS IS THE AWARD OF TASK ORDER 0021 UNDER CONTRACT W58RGZ-14-D-0045, IN SUPPORT OF THE APACHE LOSS MODEL STATEMENT OF WORK. THE PURPOSE OF THIS TASK ORDER IS TO DEVELOP A FAULT LOSS TREE MODEL FOR THE APACHE AH-64E WHICH WILL DEFINE THE RELATIONSHIPS BETWEEN THE INDIVIDUAL HAZARDS, THEIR CONTROL MEASURES, THEIR TECHNICAL CAUSES AND THE POTENTIAL ACCIDENTS THAT MAY ARISE.
- FY2018: $1,815,614
- FY2019: $936,452
- FY2020: −$709,127
- FY2025: −$31,713
- TASK ORDER 0022 FOR DATA LINK COMPATIBILITY MODIFICATION FOR TOTAL SYSTEM INTEGRATION (TSI) EFFORT TO LOGISTICS PRODUCT DATA UNDER ID/IQ CONTRACT W58RGZ-14-D-0045 FOR APACHE AH-64D/E ENGINEERING SERVICES
CONT_AWD_0022_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER 0022 FOR DATA LINK COMPATIBILITY MODIFICATION FOR TOTAL SYSTEM INTEGRATION (TSI) EFFORT TO LOGISTICS PRODUCT DATA UNDER ID/IQ CONTRACT W58RGZ-14-D-0045 FOR APACHE AH-64D/E ENGINEERING SERVICES
- FY2018: $657,673
- FY2022: −$222,702.72
- NOUN: KIT, GENERATOR, NSN: 5120-01-618-0228,PART NUMBER (PN) 7-562126001-605, FOR A QUANTITY OF 5 EACH (EA)
CONT_AWD_0022_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $52,919.40
- FY2016: $109,752.50
- TASK ORDER 0023 IS ISSUED IN ACCORDANCE WITH SECTION H-4, METHOD OF ORDERING, OF THE BASIC CONTRACT, FOR THE PERFORMANCE WORK STATEMENT (PWS) FOR IMPROVED TURBINE ENGINE DESIGN SUPPORT SERVICES FOR THE AH-64E - ATTACHMENT 0001.
CONT_AWD_0023_9700_W58RGZ14D0045_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER 0023 IS ISSUED IN ACCORDANCE WITH SECTION H-4, METHOD OF ORDERING, OF THE BASIC CONTRACT, FOR THE PERFORMANCE WORK STATEMENT (PWS) FOR IMPROVED TURBINE ENGINE DESIGN SUPPORT SERVICES FOR THE AH-64E - ATTACHMENT 0001.
- FY2018: $5,002,176
- FY2024: −$2,103,329.34
- ADAPTER,TEST NSN: 6625-01-618-1627 MFR PART NUMBER: 7-562181100-603
CONT_AWD_0023_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $47,765
- FY2016: $48,298.60
- FY2017: $417
- 50 EACH, BRACKET ASSY, ACTUATOR, NSN 1680-01-263-9843, P/N 7-311511139-9 FOR AH-64.
CONT_AWD_0029_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
50 EACH, BRACKET ASSY, ACTUATOR, NSN 1680-01-263-9843, P/N 7-311511139-9 FOR AH-64.
- FY2015: $69,810.50
- FY2016: $0
- NOUN: DOOR AIRCRAFT NSN: 1560-01-579-2740 P/N: 414S2901-21
CONT_AWD_0034_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2015: $366,536.43
- FY2016: $0
- FY2017: $0
- NOUN: CONNECTING LINK, RIG NSN: 3040-01-432-8239
CONT_AWD_0038_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2016: $194,924
- 5 EACH, NO NSN, P/N 7-M62100011-601, MOD KIT, ADAPTER SET AND 5 EACH, NO NSN, P/N 7-M62100005-609, MOD KIT, SLING SET.
CONT_AWD_0039_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $182,434.30
- NEW ORDER
CONT_AWD_0043_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2016: $347,000
- NEW DELIVERY ORDER
CONT_AWD_0044_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2016: $502,456.50
- NEW DELIVERY ORDER
CONT_AWD_0045_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2016: $201,148.50
- DO 0048
CONT_AWD_0048_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $1,800,000
- FY2017: −$94,632
- ONE-TIME BUY FOR 1,430 STRAP ASSY, MAIN ROT, NSN: 1615-01-501-7715, P/N: 7-511411146-3.
CONT_AWD_0059_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $22,193,600
- FY2019: $0
- DELIVERY ORDER FOR 245 COVER, SUMP DOLLAR AMOUT $ 175,500.85
CONT_AWD_0061_9700_W58RGZ04D0057_9700
GENERAL ELECTRIC COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2008: $175,500.85
- AH-64 SPARE PARTS
CONT_AWD_0099_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
AH-64 SPARE PARTS
- FY2018: $21,787.42
- 7 EACH SKIN, AIRCRAFT, PART NUMBER 7-311113280-9, $2,733.17 EACH 6 EACH SKIN, AIRCRAFT, PART NUMBER 7-511111092-00, $2,691.14 EACH 5 EACH SPACER, PLATE, PART NUMBER 7-311113512-144, $1,097.47 EACH FOR AH-64 APACHE.
CONT_AWD_0100_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
7 EACH SKIN, AIRCRAFT, PART NUMBER 7-311113280-9, $2,733.17 EACH 6 EACH SKIN, AIRCRAFT, PART NUMBER 7-511111092-00, $2,691.14 EACH 5 EACH SPACER, PLATE, PART NUMBER 7-311113512-144, $1,097.47 EACH FOR AH-64 APACHE.
- FY2018: $40,766.38
- FY2021: $0
- AH-64 APACHE: PRON: AX8F5505AX; PANEL, STRUCTURAL
CONT_AWD_0104_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
AH-64 APACHE: PRON: AX8F5505AX; PANEL, STRUCTURAL
- FY2018: $17,223.12
- APACHE CRASH BATTLE PRONS-16 PRONS
CONT_AWD_0105_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
APACHE CRASH BATTLE PRONS-16 PRONS
- FY2018: $24,329.17
- AH-64 APACHEREQUIREMENT; 6 EACH FRAME, AIRCRAFT;PART NUMBER 7-511111072-101; $1,667.73 EACH. 8 EACH; SKIN, AIRCRAFT; PART NUMBER 7-511111094-001; $2,913.20 EACH
CONT_AWD_0106_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
AH-64 APACHEREQUIREMENT; 6 EACH FRAME, AIRCRAFT;PART NUMBER 7-511111072-101; $1,667.73 EACH. 8 EACH; SKIN, AIRCRAFT; PART NUMBER 7-511111094-001; $2,913.20 EACH
- FY2018: $33,311.98
- FY2020: $0
- 5 EA, FRAME,AIRCRAFT, NSN:1560-01-662-9435, P/N: 7-511111016-101, UNIT PRICE: $9,131.98 14 EA SUPPORT,STRUCTURALC, NSN:1560-01-662-5407, P/N: 7-311113106-55, UNIT PRICE: $ $1,964.78 FOR AH-64 APACHE
CONT_AWD_0107_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
5 EA, FRAME,AIRCRAFT, NSN:1560-01-662-9435, P/N: 7-511111016-101, UNIT PRICE: $9,131.98 14 EA SUPPORT,STRUCTURALC, NSN:1560-01-662-5407, P/N: 7-311113106-55, UNIT PRICE: $ $1,964.78 FOR AH-64 APACHE
- FY2018: $73,166.82
- FY2020: $0
- FY2022: −$27,506.92
- APACHE CRASH BATTLE PRON'S.
CONT_AWD_0112_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
APACHE CRASH BATTLE PRON'S.
- FY2018: $20,875.60
- FY2021: $0
- SEVENTY TWO (72) PRODUCTION T700-GE-701D ENGINES WITH ROK EXTENDED WARRANTY AND FOUR (4 EACH) SPARE T700-GE-701D ENGINES IN APPROVED METAL CONTAINERS WITH ROK EXTENDED WARRANTY, TO INCLUDE SUPPORT, TO THE US DEPARTMENT OF THE ARMY FOR THE GOVERNMENT REPUBLIC OF KOREA.
CONT_AWD_BS01_9700_SPRTA112G0006_9700
GENERAL ELECTRIC COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2013: $57,498,658
- FY2014: $0
- FY2015: −$595,740
- PURCHASE OF 12 A-29 AIRCRAFT FOR NIGERIA
CONT_AWD_FA863719C6009_9700_-NONE-_-NONE-
SIERRA NEVADA COMPANY, LLC · Program office statement
AH-64E REMANUFACTURE
- FY2019: $238,762,637.31
- FY2020: $27,161,788.92
- FY2021: $66,969,719.77
- FY2022: $1,876,763.85
- FY2023: $3,714,458.34
- FY2024: $546,363
- COOLER, FLUID, TRANSMISSION
CONT_AWD_SPRRA114C0028_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2014: $812,563.50
- FY2017: $0
- LMCO REQUIREMENT
CONT_AWD_SPRRA115P0008_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2015: $38,314
- PROCUREMENT OF FMS SPARES
CONT_AWD_SPRRA115P0011_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2015: $33,367
- POWER SUPPLY
CONT_AWD_SPRRA118C0025_9700_-NONE-_-NONE-
GRIMES AEROSPACE COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $349,044
- FY2020: $0
- SPARES
CONT_AWD_SPRRA118C0045_9700_-NONE-_-NONE-
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2018: $954,000
- FY2019: $0
- SUPPORT,SHOCK STRUT
CONT_AWD_SPRRA118F0039_9700_SPRRA117D0159_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2018: $15,688,500
- FY2020: $0
- FY2021: $0
- SPARES
CONT_AWD_SPRRA118F0055_9700_SPRRA115D0030_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2018: $4,840,284
- FY2019: $0
- SPARES
CONT_AWD_SPRRA118F0073_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $16,096,520.10
- FY2019: $0
- FY2020: −$2,770,226
- FY2021: $0
- POWER AND HAND PUMPS
CONT_AWD_SPRRA118F0100_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $431,704
- FY2019: $0
- ELECTRICAL AND ELECTRONIC PROPERTIES MEASURING AND TESTING INSTRUMENTS
CONT_AWD_SPRRA118F0126_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $331,075.20
- FY2019: $0
- NEW SPARES
CONT_AWD_SPRRA119C0011_9700_-NONE-_-NONE-
VIASAT INC · Program office statement
AH-64E NEW BUILD
- FY2019: $544,500
- NOUN: TRANSMITTER ASSEMBL NSN: 4920-01-563-3106 PART NUMBER: 2501200-4
CONT_AWD_SPRRA119C0055_9700_-NONE-_-NONE-
DRS TRAINING & CONTROL SYSTEMS, LLC · Program office statement
AH-64E NEW BUILD
- FY2019: $349,570.55
- FY2021: $0
- FY2022: $0
- FY2023: $0
- DELIVERY ORDER
CONT_AWD_SPRRA119F0005_9700_SPRRA119D0004_9700
SIMMONDS PRECISION PRODUCTS INC · Program office statement
AH-64E REMANUFACTURE
- FY2019: $2,118,250
- FY2020: $0
- SPARES
CONT_AWD_SPRRA119F0006_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $888,658.40
- DLA SPARES; VALVE SOLENOID
CONT_AWD_SPRRA119F0014_9700_SPRRA118D0100_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2019: $309,480
- APACHE SPARES
CONT_AWD_SPRRA119F0019_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
APACHE SPARES
- FY2019: $852,920.24
- FY2022: $0
- APACHE SPARES
CONT_AWD_SPRRA119F0020_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
APACHE SPARES
- FY2019: $670,902.30
- FY2020: −$374,702.10
- FY2021: $1,702.30
- APACHE SPARES
CONT_AWD_SPRRA119F0021_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
APACHE SPARES
- FY2019: $154,618.50
- APACHE HELICOPTER SPARES
CONT_AWD_SPRRA119F0022_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
APACHE HELICOPTER SPARES
- FY2019: $132,944.40
- APACHE HELICOPTER SPARES
CONT_AWD_SPRRA119F0023_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
APACHE HELICOPTER SPARES
- FY2019: $113,478
- APACHE HELICOPTER SPARE PARTS
CONT_AWD_SPRRA119F0024_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
APACHE HELICOPTER SPARE PARTS
- FY2019: $231,927.75
- APACHE HELICOPTER SPARES
CONT_AWD_SPRRA119F0025_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
APACHE HELICOPTER SPARES
- FY2019: $313,411.70
- DELIVERY ORDER
CONT_AWD_SPRRA119F0038_9700_SPRRA119D0014_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2019: $2,120,000
- FY2021: $0
- NEW SPARES
CONT_AWD_SPRRA119F0045_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $396,275.46
- FY2021: $0
- HELICOPTER ROTOR BLADES, DRIVE MECHANISMS AND COMPONENTS
CONT_AWD_SPRRA119F0060_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $671,596.50
- SPARES
CONT_AWD_SPRRA119F0081_9700_SPRRA119D0032_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $74,523
- SPARES
CONT_AWD_SPRRA119F0093_9700_SPE4A117G0016_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $1,994,636
- SPARES
CONT_AWD_SPRRA119F0094_9700_SPRRA118D0100_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2019: $206,320
- FY2020: $0
- 65 EACH OF NSN: 1650-01-159-4425, P/N: 7-211670301-3, AND NOUN: VALVE ENGINE INLET-ANTI-ICE
CONT_AWD_SPRRA119F0099_9700_SPRRA118D0050_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $139,750
- AIRCRAFT VSPARES PROCUREMENT
CONT_AWD_SPRRA119F0101_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $1,790,924
- LEVER, REMOTE CONTROL
CONT_AWD_SPRRA119F0102_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $343,854
- FY2020: $0
- NEW SPARES
CONT_AWD_SPRRA119F0104_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $1,677,432.75
- FY2021: $0
- GEARSHAFT BEVEL
CONT_AWD_SPRRA119F0122_9700_SPRRA118D0098_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $18,700
- NEW SPARES
CONT_AWD_SPRRA119F0128_9700_SPRRA118D0089_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $553,269.08
- FY2020: $0
- NEW SPARES
CONT_AWD_SPRRA119F0129_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $583,092
- SPARE PARTS STRAP ASSEMBLY, MAIN
CONT_AWD_SPRRA119F0138_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $24,300,000
- FY2020: $0
- SPARES
CONT_AWD_SPRRA119F0148_9700_SPRRA119D0053_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2019: $3,494,540
- FY2020: $0
- FY2021: $0
- FY2022: −$179,672.13
- ADAPTER SET
CONT_AWD_SPRRA119F0168_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $660,459.10
- FY2021: $0
- SPARES
CONT_AWD_SPRRA119F0187_9700_SPRRA119D0056_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $20,191.40
- SPARES
CONT_AWD_SPRRA119F0198_9700_SPRRA119D0059_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $110,355.75
- FY2020: $0
- OTHER METAL VALVE AND PIPE FITTING MANUFACTURING
CONT_AWD_SPRRA119F0219_9700_SPRRA117D0219_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $40,160
- NEW SPARES
CONT_AWD_SPRRA119F0222_9700_SPRRA119D0063_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2019: $676,562.50
- NEW SPARES
CONT_AWD_SPRRA119F0230_9700_SPRRA118D0145_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $332,080
- FY2020: $0
- VALVES, POWERED
CONT_AWD_SPRRA119F0238_9700_SPE4AX14D9404_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2019: $150,816.75
- NEW SPARES
CONT_AWD_SPRRA119F0254_9700_SPRRA119D0070_9700
VIASAT INC · Program office statement
AH-64E NEW BUILD
- FY2019: $2,568,723
- PANEL ASSEMBLY
CONT_AWD_SPRRA119F0260_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $482,967.99
- DLA SPARES; SHAFT ASSY, TAIL ROT
CONT_AWD_SPRRA119F0270_9700_SPRRA119D0014_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2019: $2,120,000
- FY2021: $0
- SPARE PARTS
CONT_AWD_SPRRA119F0357_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $43,014,075
- FY2020: $0
- FY2021: $0
- CHINOOK SPARES
CONT_AWD_SPRRA119F0360_9700_SPRPA118D007U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $392,310
- SPARES
CONT_AWD_SPRRA119F0362_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $20,921,818.75
- FY2020: $0
- NEW SPARES
CONT_AWD_SPRRA119F0372_9700_SPRRA119D0112_9700
GRIMES AEROSPACE COMPANY · Program office statement
AH-64E NEW BUILD
- FY2019: $1,025,111
- SPARES AH-64
CONT_AWD_SPRRA119F0385_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Award title or description names the program
SPARES AH-64
- FY2019: $591,010.80
- FY2020: −$27,110.70
- SPARES
CONT_AWD_SPRRA119F0389_9700_SPE4AX12D9400_9700
GENERAL ELECTRIC COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $21,160,762.50
- DLA SPARES; GUN MANDREL ASSEMBLY
CONT_AWD_SPRRA119P0001_9700_-NONE-_-NONE-
DRS TRAINING & CONTROL SYSTEMS, LLC · Program office statement
AH-64E REMANUFACTURE
- FY2019: $101,442.15
- FY2020: $0
- COMPUTER, DIGITAL DA, NSN: 5895-01-677-5223 P/N: 3000649000
CONT_AWD_SPRRA120C0003_9700_-NONE-_-NONE-
L3 TECHNOLOGIES, INC. · Program office statement
AH-64E REMANUFACTURE
- FY2020: $1,811,748.90
- STRUT ASSY,ROTOR SU
CONT_AWD_SPRRA120F0008_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $164,940.46
- FY2021: $0
- NEW SPARES
CONT_AWD_SPRRA120F0031_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $1,997,608
- FY2021: $0
- SWASHPLATE, CONTROLL
CONT_AWD_SPRRA120F0042_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $638,092.40
- HELICOPTER ROTOR BLADES, DRIVE MECHANISMS AND COMPONENTS
CONT_AWD_SPRRA120F0046_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $2,605,788.35
- FY2021: $0
- SPAR BOX ASSEMBLY
CONT_AWD_SPRRA120F0049_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $2,242,691.40
- FY2021: $0
- BLADE,ROTARY WING NSN: 1615-01-653-8691 MFR PART NUMBER: 7-5R0430100-105
CONT_AWD_SPRRA120F0062_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $41,696,012
- FY2024: −$298,909.32
- SPARES
CONT_AWD_SPRRA120F0067_9700_SPRRA119D0004_9700
SIMMONDS PRECISION PRODUCTS INC · Program office statement
AH-64E NEW BUILD
- FY2020: $2,592,900
- FY2023: −$1,253,235
- SPARES
CONT_AWD_SPRRA120F0091_9700_SPE4AX14D9404_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2020: $1,735,179.42
- SWASHPLATE, CONTROLL
CONT_AWD_SPRRA120F0093_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $3,849,264
- FY2021: $0
- SPARES
CONT_AWD_SPRRA120F0156_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $226,534.82
- NEW SPARES
CONT_AWD_SPRRA120F0159_9700_SPRRA120D0029_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2020: $151,523.06
- FY2022: $401,370.07
- FY2025: $0
- SPARES
CONT_AWD_SPRRA120F0169_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $284,498
- STRAP ASSEMBLY,MAIN NSN: 1615-01-677-2585 MFR PART NUMBER: 7-511411146-5
CONT_AWD_SPRRA120F0185_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $18,100,252.17
- FY2021: $0
- FY2022: $1,737,223.59
- CLUTCH ASSEMBLY,CEN
CONT_AWD_SPRRA120F0188_9700_SPRRA117D0202_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $124,573.20
- FY2021: $0
- CLUTCH ASSEMBLY NSN: 3010-01-515-8483 MFR CAGE: 99193 MFR PART NUMBER: 3617950-1
CONT_AWD_SPRRA120F0197_9700_SPRRA120D0038_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2020: $7,785,285.99
- FY2021: −$100,680.30
- FY2022: $0
- FY2023: $190,462.08
- FY2024: $0
- COUPLING, DRIVE SHAFT
CONT_AWD_SPRRA120F0245_9700_SPRRA118D0048_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $1,541,549
- FY2021: $0
- CHINOOK SPARES
CONT_AWD_SPRRA120F0250_9700_SPRPA118D007U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $390,810
- FY2021: $0
- FY2023: $0
- FY2024: $0
- VALVE, SOLENOID NSN: 4810-01-471-2935 MFR PART NUMBER: 319980-14-1
CONT_AWD_SPRRA120F0253_9700_SPRRA120D0062_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2020: $363,750
- DELIVERY ORDER SPRRA1-20-F-0272 IS FOR 1050 EACH OF A NOUN:STRAP ASSEMBLY, MAIN NSN: 1615-01-677-2585, P/N:7-511411146-5, UNIT PRICE $18,082.17 TOTAL DOLLAR VALUE IS $18,986,278.50.
CONT_AWD_SPRRA120F0272_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $18,986,278.50
- FY2021: $0
- FY2023: $3,056,560.50
- DELIVERY ORDER AGAINST CONTRACT SPRRA1-19-D-0070 NSN RECEIVER TRANSMITTER
CONT_AWD_SPRRA120F0292_9700_SPRRA119D0070_9700
VIASAT INC · Program office statement
AH-64E REMANUFACTURE
- FY2020: $6,571,435.50
- NSN: RADIO FREGUENCY, NSN: 5895-01-677-8457, PART#: 3000652000 AND NSN: ANTENNA ASSENBLY, NSN: 5985-01-689-1216, PART#: 6008121609
CONT_AWD_SPRRA120F0294_9700_SPRRA120D0085_9700
L3 TECHNOLOGIES, INC. · Program office statement
AH-64E REMANUFACTURE
- FY2020: $2,767,036.30
- NEW SPARES CONTRACT
CONT_AWD_SPRRA120F0295_9700_SPRRA119D0077_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2020: $893,436.15
- NEW SPARES
CONT_AWD_SPRRA121C0002_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $30,322,386
- FY2024: $0
- SPARES
CONT_AWD_SPRRA121C0005_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $16,050,000
- FY2023: $0
- FY2025: $0
- SPARES
CONT_AWD_SPRRA121C0012_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $8,140,100
- FY2024: $0
- SPARES
CONT_AWD_SPRRA121F0008_9700_SPRRA121D0006_9700
L3 TECHNOLOGIES, INC. · Program office statement
AH-64E NEW BUILD
- FY2021: $13,402,424.61
- FY2022: $0
- DELIVERY ORDER SPRRA1-21-F-0022 IS FOR QTY:10 NSN:4330-01-681-2281, P/N:7-562104012-607 AT UNIT PRICE OF $36,513.22. TOTAL VALUE OF $365,132.20
CONT_AWD_SPRRA121F0022_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2021: $365,132.20
- FY2022: $0
- SPRPA118D002U/SPRRA121F0029 KTR: THE BOEING COMPANY 48T42 NOUN: SUPPORT ASSEMBLY,AC NSN:1615-01-0527-3781 PN:7-311525062-19 QTY:100 UNIT:$9,406.65 TOTAL:$940,665.00
CONT_AWD_SPRRA121F0029_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $940,665
- FY2023: $294,793.72
- STRAP ASSEMBLY,MAIN NSN: 1615-01-677-2585 CAGE: 8V613 PART NUMBER: 7-511411146-5 QTY:1001
CONT_AWD_SPRRA121F0070_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $18,211,002.81
- FY2023: $2,575,663.09
- BLADE,ROTARY RUDDER
CONT_AWD_SPRRA121F0095_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $710,115.96
- FY2024: $0
- NEW SPARES
CONT_AWD_SPRRA121F0104_9700_SPRRA121D0030_9700
GRIMES AEROSPACE COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $618,808.61
- SPRPA118D002U/SPRRA122F0010 KTR: THE BOEING COMPANY 48T42 NOUN: SERVICING CART NSN:4330-01-681-2281 P/N:7-562104012-607 QTY:4 UNIT$:$36,513.22 TOTAL$:$146,052.88
CONT_AWD_SPRRA122F0010_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2022: $146,052.88
- NEW SPARES
CONT_AWD_SPRRA122F0011_9700_SPRRA119D0014_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2022: $283,708.75
- NEW SPARES
CONT_AWD_SPRRA122F0015_9700_SPRRA119D0053_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2022: $2,800,000
- NEW SPARES
CONT_AWD_SPRRA122F0025_9700_SPRRA119D0070_9700
VIASAT INC · Program office statement
AH-64E NEW BUILD
- FY2022: $6,724,550
- 46100720252
CONT_AWD_SPRRA122F0102_9700_SPE4AX21D0014_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2022: $388,420.44
- NSN: 4330-01-681-2281 COMMODITY NAME: SERVICING CART PSC: 4330 CLIN CONTRACT TYPE: FIRM FIXED PRICE MFR CAGE: 8V613 MFR PART NUMBER: 7-562104012-607
CONT_AWD_SPRRA122F0117_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2022: $222,393.60
- 5-YEAR IDR P/N: 7-311B12022-5 NSN: 6130-01-454-8300 NOUN: POWER SUPPLY QTY: 100 UNIT PRICE: $10,707.12
CONT_AWD_SPRRA122F0128_9700_SPRRA119D0112_9700
GRIMES AEROSPACE COMPANY · Program office statement
AH-64E NEW BUILD
- FY2022: $1,070,712
- BLADE, ROTARY RUDDER NSN: 1615-01-312-2387 MFR PART NUMBER: 7-311422050-7
CONT_AWD_SPRRA122F0137_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $6,089,487.50
- FY2025: $0
- NEW SPARES
CONT_AWD_SPRRA122F0140_9700_SPRRA122D0019_9700
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2022: $353,375.82
- SPARES
CONT_AWD_SPRRA122F0154_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2022: $1,651,911
- KIT, GENERATOR P/N: 7-562126001-605 NSN: 5120-01-618-0228
CONT_AWD_SPRRA122F0194_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $101,841.76
- BELL CRANK NSN: 1680-01-224-2262 MFR PART NUMBER: 7-311511117-13
CONT_AWD_SPRRA122F0198_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $3,465,576
- CONNECTING LINK, RIG P/N: 1168851-101 NSN: 3040-01-154-7056
CONT_AWD_SPRRA122F0199_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $1,038,236
- FY2023: $0
- FY2025: $0
- BEARING UNIT, BALL
CONT_AWD_SPRRA122F0200_9700_SPRRA119D0077_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2022: $1,432,746.90
- FY2023: $0
- NEW SPARES
CONT_AWD_SPRRA122F0203_9700_SPRRA121D0030_9700
GRIMES AEROSPACE COMPANY · Program office statement
AH-64E NEW BUILD
- FY2022: $1,827,399
- SHAFT ASSY, TAIL ROTOR
CONT_AWD_SPRRA122F0204_9700_SPRRA119D0014_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2022: $2,269,670
- FY2023: $0
- SHIPPING AND STORAG
CONT_AWD_SPRRA122F0231_9700_SPE4A119G0020_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2022: $517,472.80
- LEVER REMOTE CONTROL
CONT_AWD_SPRRA123F0009_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $211,287
- ROTARY RUDDER
CONT_AWD_SPRRA123F0010_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $12,178,975
- FY2026: $0
- SUPPORT ASSEMBLY, AC
CONT_AWD_SPRRA123F0011_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $968,078
- FY2024: $0
- SWASHPLATE, CONTROL
CONT_AWD_SPRRA123F0012_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $1,746,000
- ACTUATOR, ELECTRO-ME
CONT_AWD_SPRRA123F0016_9700_SPRRA119D0004_9700
SIMMONDS PRECISION PRODUCTS INC · Program office statement
AH-64E REMANUFACTURE
- FY2023: $6,420,400
- NEW SPARES
CONT_AWD_SPRRA123F0051_9700_SPRRA120D0029_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2023: $309,895.20
- SHOCK STRUT ASSEMBLY
CONT_AWD_SPRRA123F0102_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $3,826,248
- ENGINEERING SERVICES
CONT_AWD_SPRRA123F0128_9700_SPE4AX21D0014_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2023: $419,658.72
- SHAFT ASSY,TAIL ROT NSN: 1615-01-388-1326 MFR CAGE: 99551 MFR PART NUMBER: 19E203-2BCL107
CONT_AWD_SPRRA123F0141_9700_SPRRA119D0014_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2023: $3,076,480.40
- NEW SPARES
CONT_AWD_SPRRA123F0161_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $66,104,739.10
- FY2025: $0
- FY2026: $0
- BELL CRANK
CONT_AWD_SPRRA123F0162_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $10,760,613.48
- SWASHPLATE,CONTROLL
CONT_AWD_SPRRA123F0163_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $10,017,644
- SPARES
CONT_AWD_SPRRA123F0176_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $52,254,265.60
- NEW SPARES
CONT_AWD_SPRRA123F0182_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $376,398.80
- SPARES
CONT_AWD_SPRRA123F0232_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $8,091,062.53
- FY2025: $0
- FY2026: $0
- PITCH LINK ASSEMBLY, MAIN ROTOR AH-64 APACHE
CONT_AWD_SPRRA123F0233_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Award title or description names the program
PITCH LINK ASSEMBLY, MAIN ROTOR AH-64 APACHE
- FY2023: $2,947,706.08
- FY2024: $0
- FY2026: $0
- NEW SPARES
CONT_AWD_SPRRA123F0235_9700_SPRRA123D0024_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2023: $7,467,867
- FY2024: $0
- PIN ASSY - 49705 EA
CONT_AWD_SPRRA123F0245_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $84,734,139.61
- SHIPPING AND STORAG
CONT_AWD_SPRRA123F0248_9700_SPE4A119G0020_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $1,960,087.80
- BASE MAST SUPPORT
CONT_AWD_SPRRA123F0249_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $10,339,753.06
- FY2024: $0
- SHOE ASSY,MAIN ROTO
CONT_AWD_SPRRA123F0255_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2023: $732,987.86
- SPARES
CONT_AWD_SPRRA123F0257_9700_SPE4AX22D0008_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2023: $36,711,108
- FY2024: $0
- SPARES
CONT_AWD_SPRRA123F0258_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $1,762,869.60
- FY2024: $0
- SPARES
CONT_AWD_SPRRA123F0260_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $2,014,380
- SPARES
CONT_AWD_SPRRA123F0261_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $61,994,028
- FY2024: −$848,640
- FY2025: −$464,100
- FY2026: $0
- SPARES
CONT_AWD_SPRRA123F0265_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $263,479.16
- LINK ASSEMBLY, BELLCRANK, SWASHPLATE, TAIL ROTOR CONTROLS
CONT_AWD_SPRRA123F0267_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $768,377.70
- FY2024: $0
- SPARES
CONT_AWD_SPRRA124C0003_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $4,351,837.60
- FY2025: $0
- SPARES
CONT_AWD_SPRRA124C0006_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2024: $1,843,656.02
- FY2025: $0
- FY2026: $0
- SPARES
CONT_AWD_SPRRA124F0004_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $23,253,975
- SPARES
CONT_AWD_SPRRA124F0013_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $200,703
- FY2025: $0
- SPARES
CONT_AWD_SPRRA124F0063_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $9,712,397.72
- FY2026: −$155,927.30
- SPARES
CONT_AWD_SPRRA124F0081_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $22,065,605.64
- FY2026: $0
- PIN ASSY, LINK, ROTOR
CONT_AWD_SPRRA124F0083_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $84,817,212.40
- KIT,GENERATOR
CONT_AWD_SPRRA124F0085_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2024: $89,111.54
- FY2026: $45,867.43
- SPARES DELIVERY ORDER FOR AVIONICS EQUIPMENT
CONT_AWD_SPRRA124F0088_9700_SPRRA119D0077_9700
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2026: $0
- SPARES
CONT_AWD_SPRRA124F0134_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $57,861,092.80
- FY2026: −$294,735.27
- SPARES
CONT_AWD_SPRRA124F0164_9700_SPRRA121D0006_9700
L3 TECHNOLOGIES, INC. · Program office statement
AH-64E NEW BUILD
- FY2024: $58,481.37
- FY2025: $0
- SPARES
CONT_AWD_SPRRA124F0169_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $3,918,068.83
- FY2025: $0
- FY2026: −$2,088,072.61
- SPARES
CONT_AWD_SPRRA124F0187_9700_SPE4AX15D9423_9700
SIKORSKY AIRCRAFT CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2024: $13,912,566
- SPARES
CONT_AWD_SPRRA124F0188_9700_SPE4AX15D9423_9700
SIKORSKY AIRCRAFT CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2024: $32,086,338.75
- FY2025: $0
- SPARES
CONT_AWD_SPRRA124F0189_9700_SPE4AX15D9423_9700
SIKORSKY AIRCRAFT CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2024: $11,429,159.40
- FY2025: $56,104,415.99
- SPARES
CONT_AWD_SPRRA125F0001_9700_SPRRA121D0029_9700
GENERAL ELECTRIC COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2025: $183,764.70
- SPARES
CONT_AWD_SPRRA125F0002_9700_SPRRA121D0029_9700
GENERAL ELECTRIC COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2025: $94,102.40
- SPARES
CONT_AWD_SPRRA125F0048_9700_SPRPA124D003E_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2025: $394,080.90
- FY2026: $151,109.10
- SPARES
CONT_AWD_SPRRA125F0060_9700_SPRPA124D003E_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2025: $6,956,675.70
- FY2026: $0
- SPARES
CONT_AWD_SPRRA125F0085_9700_SPRPA124D002E_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2025: $3,771,560.54
- SPARES
CONT_AWD_SPRRA126F0004_9700_SPRPA124D002E_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2026: $22,801,907
- SPARES
CONT_AWD_SPRRA126F0010_9700_SPRPA124D002E_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2026: $296,919.12
- CABLE ASSEMBLY, SPEC
CONT_AWD_SPRRA215P0023_9700_-NONE-_-NONE-
RAYTHEON COMPANY · Program office statement
AH-64E NEW BUILD
- FY2015: $23,501
- POST PRODUCTION SUPPORT SERVICES FOR ROYAL NETHERLANDS AIR FORCE FOR THE AH-64 APACHE HELICOPTER.
CONT_AWD_W52P1J18C0017_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Award title or description names the program
POST PRODUCTION SUPPORT SERVICES FOR ROYAL NETHERLANDS AIR FORCE FOR THE AH-64 APACHE HELICOPTER.
- FY2018: $8,016,976
- FY2019: $21,404
- FY2020: $0
- FY2021: $0
- DELIVERY ORDER TO SUPPORT RADAR ELECTRONIC UNITS PRODUCTION FOR USG REQUIREMENTS
CONT_AWD_W52P1J19F0044_9700_W52P1J16D0055_9700
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2019: $52,642,959
- FY2020: $0
- FY2022: −$192,760
- GREECE DEPOT LAY-IN STORAGE
CONT_AWD_W52P1J19P0020_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2019: $12,400
- AWARD OF PURCHASE ORDER FOR SINGAPORE SPARE PARTS PUCHASE
CONT_AWD_W52P1J19P0043_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2019: $84,235
- 1. THIS NONCOMPETITIVE ACTION IS BEING EXECUTED IAW FAR 15, CONTRACT BY NEGOTIATION UNDER CONTRACT SPE4A1-19-G-0013. 2. THIS DELIVERY ORDER IS AWARDED TO BOEING, INC. (CAGE CODE OPXV4) FOR THE FOLLOWING ITEM: NSN MFG P/N NOUN QTY U/I 3010016707149 7-617221367-001 COUPLING,SHAFT,FLEX 39 EACH 3. THE CONTRACTOR IS AUTHORIZED TO SHIP EARLY AT NO ADDITIONAL COST TO THE GOVERNMENT. 4. ALL SHIPMENTS WILL BE FOB ORIGIN WITH THE FOLLOWING SHIP TO ADDRESS: (W562RM) SU W0MC ARMY GENERAL SUPPLY DLA DISTRIBUTION RED RIVER HIGHWAY 82 WEST TEXARKANA,TX,75507-5000 5. ALL TERMS AND CONDITIONS OF BOA SPE4A1-19-G0013 APPLY. ANY CONFLICTING TERMS AND CONDITIONS CONTAINED IN THIS ORDER ARE SUPERSEDED BY THE TERMS AND CONDITIONS OF THE BOA. 6. BOEING PROPOSAL IS DOCUMENTED UNDER PROP-019-022519.
CONT_AWD_W56HZV19F0479_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $19,768.71
- LIFE CYCLE CONTRACTOR SUPPORT FOR FIRE CONTROL RADAR, APACHE LONGBOW HELICOPTER
CONT_AWD_W58RGZ07C0050_9700_-NONE-_-NONE-
LONGBOW LLC · Award title or description names the program
LIFE CYCLE CONTRACTOR SUPPORT FOR FIRE CONTROL RADAR, APACHE LONGBOW HELICOPTER
- FY2008: $17,718,539.72
- FY2009: $17,130,561.04
- FY2010: $5,731,340
- FY2011: $0
- FY2013: −$935,854.21
- FY2015: −$7,498.05
- LONG LEAD CONTRACT FOR 30 AH-64D AIRCRAFT FOR THE GOVERNMENT OF TAIWAN
CONT_AWD_W58RGZ09C0147_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
LONG LEAD CONTRACT FOR 30 AH-64D AIRCRAFT FOR THE GOVERNMENT OF TAIWAN
- FY2009: $86,516,480
- FY2010: $0
- FY2011: $142,590,672
- FY2012: $238,587,236
- FY2013: $254,452,072
- FY2014: $12,111,438
- FY2015: $3,450,896
- FY2016: $12,728,606
- FY2017: $1,737,083.93
- FY2018: $0
- FY2019: −$73,355
- FY2020: $188,672
- FY2023: −$640,635.38
- FY2024: −$39,131
- ESTABLISHMENT OF UNDEFINITIZED CONTRACT ACTION (UCA) TO FUND CY10 BASIC REQUIREMENT
CONT_AWD_W58RGZ10C0126_9700_-NONE-_-NONE-
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2010: $3,980,308.80
- FY2011: $36,548,274.20
- FY2012: $13,736,141
- FY2013: $0
- FY2016: −$34,346.25
- FY2023: $0
- FUNDING OF ADVANCE PROCUREMENT FOR LOT 3
CONT_AWD_W58RGZ12C0049_9700_-NONE-_-NONE-
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2012: $39,000,000
- FY2013: $7,800,000
- FY2014: $26,077,136.01
- FY2015: $0
- FY2016: $1,851,100
- FY2017: $0
- ADVANCE PROCUREMENT FOR LOTS 3 AND 4 OF APACHE BLOCK III FULL RATE PRODUCTION
CONT_AWD_W58RGZ12C0055_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
ADVANCE PROCUREMENT FOR LOTS 3 AND 4 OF APACHE BLOCK III FULL RATE PRODUCTION
- FY2012: $154,280,000
- FY2013: $127,800,173.27
- FY2014: $893,566,507.93
- FY2015: $44,936,936
- FY2016: $77,265,240.12
- FY2017: $43,866,506.48
- FY2018: $11,289,388
- FY2019: −$6,898,894.61
- FY2020: −$14,535,533.64
- FY2021: −$8,475,811.47
- FY2022: $0
- FY2023: −$419,494.50
- FY2024: $0
- FY2025: −$23,677,008.32
- IGF::OT::IGF AWARD OF UNDEFINITIZED CONTRACT ACTION FOR LIFE CYCLE CONTRACTOR SUPPORT (LCCS) FOR CALENDAR YEAR 2013 BASE EFFORT
CONT_AWD_W58RGZ13C0028_9700_-NONE-_-NONE-
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2013: $37,813,385
- FY2014: $16,793,981
- FY2015: $20,303,338
- FY2016: $19,576,190
- FY2017: −$127,281
- 36 MTADS/PNVS AND SUPPORT FOR REPUBLIC OF KOREA
CONT_AWD_W58RGZ13C0104_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2013: $223,310,000.08
- FY2014: $0
- FY2015: $0
- FY2016: $0
- FY2017: $0
- FY2019: $0
- FY2025: $0
- QTY 6 EA FCR AND SUPPORT FOR REPUBLIC OF KOREA
CONT_AWD_W58RGZ13C0105_9700_-NONE-_-NONE-
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2013: $51,055,000
- FY2014: $0
- FY2015: $0
- FY2016: $66,800
- FY2017: $0
- FY2019: $0
- THIRTY-SIX (36)NEW BLOCK III APACHE HELICOPTER AH-64E MODEL FOR THE REPUBLIC OF KOREA (ROK)TO INCLUDE INTEGRATED LOGISTICS SUPPORT (ILS) AND SPARES, AND ONE (1) LONGBOW CREW TRAINER (LCT), SPARES AND SUPPORT
CONT_AWD_W58RGZ13C0106_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
THIRTY-SIX (36)NEW BLOCK III APACHE HELICOPTER AH-64E MODEL FOR THE REPUBLIC OF KOREA (ROK)TO INCLUDE INTEGRATED LOGISTICS SUPPORT (ILS) AND SPARES, AND ONE (1) LONGBOW CREW TRAINER (LCT), SPARES AND SUPPORT
- FY2013: $904,418,647.43
- FY2014: $0
- FY2016: $882,839.57
- FY2017: −$862,301
- FY2020: −$6,315
- FY2022: −$163,286.48
- NEW CONTRACT TO SUPPORT
CONT_AWD_W58RGZ13C0112_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2013: $1,903,468
- FY2014: $65,254
- FY2015: $918,898
- FY2016: $807,283
- FY2017: $833,227
- FY2018: $316,613.50
- FY2019: −$12,500
- FY2020: $0
- FY2021: $0
- CONTRACT W58RGZ-13-C-0006 IS AWARDED TO LONGBOW LIMITED LIABILITY (LBL) COMPANY FOR THE UNITED ARAB EMIRATES (UAE) APACHE LONGBOW FIRE CONTROL RADAR (FCR) INTEGRATED LOGISTICS SUPPORT (ILS) AND CONTRACTOR MAINTENANCE (CM).
CONT_AWD_W58RGZ14C0006_9700_-NONE-_-NONE-
LONGBOW LLC · Award title or description names the program
CONTRACT W58RGZ-13-C-0006 IS AWARDED TO LONGBOW LIMITED LIABILITY (LBL) COMPANY FOR THE UNITED ARAB EMIRATES (UAE) APACHE LONGBOW FIRE CONTROL RADAR (FCR) INTEGRATED LOGISTICS SUPPORT (ILS) AND CONTRACTOR MAINTENANCE (CM).
- FY2014: $2,418,211
- FY2015: $0
- FY2016: $2,112,964
- FY2017: $2,203,945
- FY2018: $2,665,763
- FY2019: $1,004,418
- FY2020: $0
- FY2021: −$239,000
- FY2023: −$379,033
- ADVANCED PROCUREMENT FUNDING FOR LONG LEAD ITEMS
CONT_AWD_W58RGZ14C0018_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2014: $103,800,000
- FY2015: $464,795,873
- FY2016: $945,277,550
- FY2017: $13,728,714.77
- FY2018: $2,290,938.23
- FY2019: −$150,000
- FY2020: $0
- FY2021: $0
- FY2022: −$18,683,486.06
- FY2023: −$19,488,526.47
- FY2024: $0
- UCA LETTER CONTRACT FOR DRS TCS, LLC CBHK FMS BUYS
CONT_AWD_W58RGZ14C0083_9700_-NONE-_-NONE-
DRS TRAINING & CONTROL SYSTEMS, LLC · Program office statement
AH-64E REMANUFACTURE
- FY2014: $1,964,690
- FY2015: $3,822,503.72
- FY2016: $3,109,955.41
- FY2017: $0
- FY2018: $0
- FY2019: $2,577,575.16
- FY2020: $0
- FY2021: $0
- FY2022: $0
- IGF::OT::IGF APACHE D UNIQUE, D COMMON PARTS WITH ADDITIONAL REQUIREMENT FOR E UNIQUE AND E COMMON PARTS TO SUPPORT THE AH-64D/E WEAPON
CONT_AWD_W58RGZ15C0017_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
IGF::OT::IGF APACHE D UNIQUE, D COMMON PARTS WITH ADDITIONAL REQUIREMENT FOR E UNIQUE AND E COMMON PARTS TO SUPPORT THE AH-64D/E WEAPON
- FY2015: $100,301,110.90
- FY2016: $51,524,003.78
- FY2017: $80,337,768.78
- FY2018: $88,702,033.04
- FY2019: $43,641,580.02
- FY2020: $0
- FY2021: −$3,198,624.13
- FY2022: −$11,415,972.64
- FY2024: $0
- IGF::OT::IGF BASE EFFORT CONTRACT AWARD FOR SINGAPORE FIRE CONTROL RADAR (FCR) POST PRODUCTION SYSTEM SUPPORT (PPSS), CONTRACTOR MAINTENANCE (CM) AND DEPOT REPAIRS
CONT_AWD_W58RGZ15C0019_9700_-NONE-_-NONE-
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2015: $2,681,525
- FY2016: $441,867
- FY2017: $43,990
- FY2019: $0
- FY2020: $0
- IGF::OT::IGF HELLENIC ARMY OF GREECE AH-64 APACHE TARGET ACQUISITION DESIGNATION SIGHT/MODERNIZED-TARGET ACQUISITION DESIGNATION SIGHT (TADS/M-TADS) POST PRODUCTION SERVICES AND SUPPORT (PPSS) PROGRAM
CONT_AWD_W58RGZ15C0022_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Award title or description names the program
IGF::OT::IGF HELLENIC ARMY OF GREECE AH-64 APACHE TARGET ACQUISITION DESIGNATION SIGHT/MODERNIZED-TARGET ACQUISITION DESIGNATION SIGHT (TADS/M-TADS) POST PRODUCTION SERVICES AND SUPPORT (PPSS) PROGRAM
- FY2015: $3,642,932
- FY2016: $0
- FY2017: $1,602,917
- FY2018: $65,850
- FY2019: −$75,579
- FY2020: $0
- FY2024: $0
- EIGHT AH-64E APACHE HELICOPTERS FOR REPUBLIC OF INDONESIA
CONT_AWD_W58RGZ15C0025_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
EIGHT AH-64E APACHE HELICOPTERS FOR REPUBLIC OF INDONESIA
- FY2015: $62,541,073
- FY2016: $161,120,173
- FY2017: $3,689,508
- FY2018: $3,506,072
- FY2019: $0
- FY2020: $0
- FY2023: $0
- PROCUREMENT OF NON-RECURRING DEVELOPMENT OF TECHNICAL INSERTIONS TO COMPLETE DEVELOPMENT OF THE BASE LINE AH-64E, AND FOR THE INTEGRATION OF MODIFICATIONS.
CONT_AWD_W58RGZ15C0043_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
PROCUREMENT OF NON-RECURRING DEVELOPMENT OF TECHNICAL INSERTIONS TO COMPLETE DEVELOPMENT OF THE BASE LINE AH-64E, AND FOR THE INTEGRATION OF MODIFICATIONS.
- FY2015: $51,460,139
- FY2016: $172,084,420.99
- FY2017: $69,966,873.15
- FY2018: $53,418,871.16
- FY2019: $6,616,680.70
- FY2020: $4,009,131
- FY2021: −$475,416.86
- FY2022: −$5,716,700
- FY2023: $0
- FY2024: −$38,078.08
- FY2025: −$1,950,154
- FUNDING OF ADVANCE PROCUREMENT FOR 67 RADAR ELECTRONIC UNITS (REUS) AND SPARES FOR LOTS 5-6B FULL RATE PRODUCTION (FRP).
CONT_AWD_W58RGZ15C0078_9700_-NONE-_-NONE-
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2015: $61,846,330
- FY2016: $49,828,748.01
- FY2017: $9,571,497.57
- FY2018: $423,496
- FY2019: $76,890
- FY2020: $0
- FY2021: $0
- AWARD FOR 288 EACH, HIGH PERFORMANCE SHOCK STRUTS (HPSS)
CONT_AWD_W58RGZ16C0004_9700_-NONE-_-NONE-
GOODRICH CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2016: $4,768,886
- FY2017: $9,510,700.80
- FY2020: $0
- IGF::OT::IGF CONTRACT AWARD FOR FOREIGN MILITARY SALES (FMS) FIRE CONTROL RADAR (FCR) POST PRODUCTION SYSTEM SUPPORT (PPSS) SERVICES FOR THE KINGDOM OF SAUDI ARABIA ROYAL LAND FORCES AVIATION COMMAND (RSLFAC) APACHE AH-64D/E PROGRAM.
CONT_AWD_W58RGZ16C0006_9700_-NONE-_-NONE-
LONGBOW LLC · Award title or description names the program
IGF::OT::IGF CONTRACT AWARD FOR FOREIGN MILITARY SALES (FMS) FIRE CONTROL RADAR (FCR) POST PRODUCTION SYSTEM SUPPORT (PPSS) SERVICES FOR THE KINGDOM OF SAUDI ARABIA ROYAL LAND FORCES AVIATION COMMAND (RSLFAC) APACHE AH-64D/E PROGRAM.
- FY2016: $4,834,503
- FY2017: $0
- FY2018: $2,378,315
- FY2019: $1,885,402.20
- FY2022: −$1,399,307
- FY2023: −$426,975
- FY2026: $0.37
- QATAR PRODUCTION FOR 24 AH-64E APACHE HELICOPTERS WITH THALES RADIO
CONT_AWD_W58RGZ16C0040_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
QATAR PRODUCTION FOR 24 AH-64E APACHE HELICOPTERS WITH THALES RADIO
- FY2016: $134,707,945
- FY2017: $10,694,480
- FY2018: $318,637,986
- FY2019: $6,929,925.33
- FY2020: $16,532,135.77
- FY2021: $12,992,256.74
- FY2022: −$1,047,000
- FY2023: $6,313,873.25
- FY2024: $0
- THE PROPOSE OF THIS CONTRACT IS TO AWARD A FIRM FIXED PRICE PURCHASE ORDER FOR BLOCK II REPLENISHMENT SPARES PARTS FOR ROYAL NETHERLANDS AIR FORCE (RNLAF) IN THE AMOUNT OF $145,286.00.
CONT_AWD_W58RGZ16P0055_9700_-NONE-_-NONE-
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $145,286
- FY2017: $0
- FY2018: $0
- IGF::OT::IGF
CONT_AWD_W58RGZ17P0021_9700_-NONE-_-NONE-
VIASAT INC · Program office statement
AH-64E REMANUFACTURE
- FY2017: $24,949
- FY2018: $13,484
- FY2019: $23,802.88
- FY2021: −$3,500
- FY2022: −$10,224
- SPARES BUY FOR URGENTLY NEEDED PARTS FOR AG-H-64.
CONT_AWD_W58RGZ18F0111_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $55,441.18
- OVERHAUL FOR AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATION KIT
CONT_AWD_W58RGZ18F0129_9700_W58RGZ16D0038_9700
DRS TRAINING & CONTROL SYSTEMS, LLC · Award title or description names the program
OVERHAUL FOR AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATION KIT
- FY2018: $1,603,550
- FY2019: $0
- FY2021: $0
- APACHE PERFORMANCE BASED LOGISTICS(PBL) IV SERVICES OF AIRFRAME COMPONENTS FOR THE UNITED STATES GOVERNMENT'S AH-64 APACHE FLEET
CONT_AWD_W58RGZ19C0024_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
APACHE PERFORMANCE BASED LOGISTICS(PBL) IV SERVICES OF AIRFRAME COMPONENTS FOR THE UNITED STATES GOVERNMENT'S AH-64 APACHE FLEET
- FY2019: $68,049,032
- FY2020: $188,970,003
- FY2021: $136,779,212.72
- FY2022: $130,267,663.50
- FY2023: $106,755,213
- FY2024: $883,284.12
- FY2025: $0
- FY2026: $0
- L-3 COMMUNICATIONS WESCAM MX-15D SENSORS
CONT_AWD_W58RGZ19C0037_9700_-NONE-_-NONE-
WESCAM USA, INC. · Program office statement
AH-64E REMANUFACTURE
- FY2020: $0
- DESIGN PHASE OF THE APACHE IMPROVED TURBINE ENGINE INTEGRATION EFFORT - ITE PHASE 1
CONT_AWD_W58RGZ19C0054_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
DESIGN PHASE OF THE APACHE IMPROVED TURBINE ENGINE INTEGRATION EFFORT - ITE PHASE 1
- FY2019: $10,000,000
- FY2020: $18,446,680
- FY2021: $9,351,797
- FY2022: $63,000
- FY2023: $1,504,078
- FY2025: $2,714,965
- LONGBOW CREW TRAINER (LCT) VIRTUAL AND HARDWARE ENHANCEMENTS FOR THE AH-64, APACHE ATTACK HELICOPTER
CONT_AWD_W58RGZ19F0045_9700_W58RGZ15G0006_9700
THE BOEING COMPANY · Award title or description names the program
LONGBOW CREW TRAINER (LCT) VIRTUAL AND HARDWARE ENHANCEMENTS FOR THE AH-64, APACHE ATTACK HELICOPTER
- FY2019: $18,943,540
- FY2020: $1,153,320
- FY2021: $10,579,798
- FY2022: $0
- FY2023: $17,823,342
- FY2024: $0
- FY2025: $0
- SYSTEM: AH-64 APACHE NOMENCLATURE: FRAME, AIRCRAFT NSN: 1560-01-592-7496 PN: 7-311111060-51 QUANTITY: 11 EACH
CONT_AWD_W58RGZ19F0285_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
SYSTEM: AH-64 APACHE NOMENCLATURE: FRAME, AIRCRAFT NSN: 1560-01-592-7496 PN: 7-311111060-51 QUANTITY: 11 EACH
- FY2019: $479,611.11
- DELIVERY ORDER FOR REPAIR OF NOUN: PROCESSOR, DATA SIGNAL FOR AH-64 HELICOPTER
CONT_AWD_W58RGZ19F0357_9700_W58RGZ19D0052_9700
HONEYWELL INTERNATIONAL INC. · Award title or description names the program
DELIVERY ORDER FOR REPAIR OF NOUN: PROCESSOR, DATA SIGNAL FOR AH-64 HELICOPTER
- FY2019: $1,098,750
- FY2020: $2,522.79
- FY2023: −$14,650
- INERTIAL BORESIGHT 6650-01-656-2050
CONT_AWD_W58RGZ19F0533_9700_W58RGZ18D0047_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $165,742.32
- FY2020: −$26,773.24
- 3 EA BARRIER ASSY, P/N: 7-611113764-101, UNIT PRICE: $3,823.61 FOR AH-64 APACHE
CONT_AWD_W58RGZ19F0627_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Award title or description names the program
3 EA BARRIER ASSY, P/N: 7-611113764-101, UNIT PRICE: $3,823.61 FOR AH-64 APACHE
- FY2019: $11,470.83
- SHELF ASSY FWD AVIONICS&PAN, AIRCRAFT
CONT_AWD_W58RGZ19F0646_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $43,923.17
- SHELF ASSY, FWD AVIO NSN: 9999-00-001-0019 MFR CAGE: 8V613 MFR PART NUMBER: 7-611115120-127
CONT_AWD_W58RGZ19F0681_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $42,900.32
- AH-64 APACHE COSSI CLUTCH OVERHAUL
CONT_AWD_W58RGZ19F0692_9700_W58RGZ19D0050_9700
HONEYWELL INTERNATIONAL INC. · Award title or description names the program
AH-64 APACHE COSSI CLUTCH OVERHAUL
- FY2019: $2,852,044.28
- FY2020: −$15,773.48
- PART NUMBER: 7-611115102-101 NOMENCLATURE: WALKWAY, AB3 FAB - LH
CONT_AWD_W58RGZ19F0727_9700_W58RGZ14G0005_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2019: $34,086.28
- CONTRACT: UNITED KINGDOM POST PRODUCTION SUPPORT SERVICES AND WAREHOUSE MANAGEMENT SERVICES FOR THE 50 AH-64E APACHE HELICOPTERS AND 3 LONGBOW CREW TRAINERS.
CONT_AWD_W58RGZ20C0014_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
CONTRACT: UNITED KINGDOM POST PRODUCTION SUPPORT SERVICES AND WAREHOUSE MANAGEMENT SERVICES FOR THE 50 AH-64E APACHE HELICOPTERS AND 3 LONGBOW CREW TRAINERS.
- FY2020: $7,038,305
- FY2021: $19,662,081.56
- FY2022: $19,943,413.09
- FY2023: $8,556,178.88
- FY2024: $0
- FY2025: −$18,257,505.53
- AWARD FFP CONTRACT W58RGZ-20-C-0023 TO LM RMS FOR PPSS OF THE RFI FOR THE TA. THIS CONTRACT REPRESENTS A FOLLOW-ON EFFORT TO CONTRACT W58GRZ-10-C-0003.
CONT_AWD_W58RGZ20C0023_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2020: $1,295,402.01
- FY2021: −$119,386.24
- FY2025: $0
- FY2026: $0
- AWARD FFP CONTRACT W58RGZ-20-C-0027 TO LM RMS FOR PPSS OF THE RFI FOR THE TA. THIS CONTRACT REPRESENTS A FOLLOW-ON EFFORT TO CONTRACT W58GRZ-13-C-0112.
CONT_AWD_W58RGZ20C0027_9700_-NONE-_-NONE-
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2020: $1,491,777.72
- FY2021: $73,521.09
- FY2022: −$11,498
- FY2023: $0
- FY2024: −$62,387.54
- 120 EA CLUTCH ASSEMBLY,FRI NSN: 3010-01-515-8483, $23,635.59 EA FOR AH64 APACHE
CONT_AWD_W58RGZ20F0171_9700_W58RGZ19D0050_9700
HONEYWELL INTERNATIONAL INC. · Award title or description names the program
120 EA CLUTCH ASSEMBLY,FRI NSN: 3010-01-515-8483, $23,635.59 EA FOR AH64 APACHE
- FY2020: $2,836,270.80
- FY2024: $0
- MAINTENANCE AND REPAIR OF THE BEARING BALL, UNIT FOR THE AH-64 APACHE HELICOPTER
CONT_AWD_W58RGZ20F0238_9700_W58RGZ20D0009_9700
GOODRICH CORPORATION · Award title or description names the program
MAINTENANCE AND REPAIR OF THE BEARING BALL, UNIT FOR THE AH-64 APACHE HELICOPTER
- FY2020: $525,612
- IBAS NSN: 6650-01-656-2050 MFR CAGE: 8V613 MFR PART NUMBER: 7-562363100-613
CONT_AWD_W58RGZ20F0244_9700_W58RGZ18D0047_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $242,698.36
- FY2021: −$142,587.50
- RADAR ELECTRONICS UNIT (20 EACH) WITH HARDWARE REPAIR SUPPORT
CONT_AWD_W58RGZ20F0332_9700_W52P1J16D0055_9700
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2020: $16,452,361.20
- FY2022: $0
- FY2023: −$26,513.33
- OVERHAUL/REPAIR OF AH-64 APACHE HELICOPTER MAIN ROTOR SWASH PLATE
CONT_AWD_W58RGZ20F0342_9700_W58RGZ20D0052_9700
THE BOEING COMPANY · Award title or description names the program
OVERHAUL/REPAIR OF AH-64 APACHE HELICOPTER MAIN ROTOR SWASH PLATE
- FY2020: $2,045,323.22
- FY2021: −$9,918.12
- FY2022: $0
- MAINTENANCE AND OVERHAUL OF THE COMPOSITE MAIN ROTOR BLADE
CONT_AWD_W58RGZ20F0343_9700_W58RGZ20D0053_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $915,781.46
- FY2023: $13,395.52
- FY2024: $0
- FY2025: $33,114.79
- FY2026: $3,243.14
- FUSELAGE SECTION NSN: 1560-01-663-0137
CONT_AWD_W58RGZ20F0365_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $1,465,510.62
- MAINTENANCE AND OVERHAUL OF THE GENERATOR ALTERNATING
CONT_AWD_W58RGZ20F0396_9700_W58RGZ20D0017_9700
GE AVIATION SYSTEMS LLC · Program office statement
AH-64E REMANUFACTURE
- FY2020: $567,675
- FY2021: −$23,473
- FY2022: $2,055
- FY2025: −$21,025
- OVERHAUL/REPAIR OF AH-64 APACHE HELICOPTER TAIL ROTOR SWASHPLATE
CONT_AWD_W58RGZ20F0409_9700_W58RGZ20D0065_9700
THE BOEING COMPANY · Award title or description names the program
OVERHAUL/REPAIR OF AH-64 APACHE HELICOPTER TAIL ROTOR SWASHPLATE
- FY2020: $1,835,271.24
- FY2021: −$845.51
- FY2024: $0
- OVERHAUL DIGITAL CAPTIVE BORESIGHT HARMONIZATION KIT
CONT_AWD_W58RGZ20F0453_9700_W58RGZ16D0038_9700
DRS TRAINING & CONTROL SYSTEMS, LLC · Program office statement
AH-64E REMANUFACTURE
- FY2020: $1,635,450
- FY2021: $0
- FY2022: $0
- THE PURPOSE OF DELIVERY ORDER IS FOR ORDER AGAAINST CONTRACT W58RGZ-20-D-0052 FOR THE SWASHPLATE CONTROL.
CONT_AWD_W58RGZ20F0459_9700_W58RGZ20D0052_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2020: $68,825.20
- REU PRODUCTION LOTS 7-11 OP 5 USA/FMS
CONT_AWD_W58RGZ20F0464_9700_W52P1J16D0055_9700
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2020: $164,606,753.56
- FY2021: $32,451,322.45
- FY2022: $56,430
- FY2023: $76,917,576.85
- FY2024: $5,776,770.44
- FY2025: $18,722,352.69
- FY2026: $0
- THE PURPOSE IS DELIVERY ORDER AGAINST BASE CONTRACT W58RGZ-2-D-0075.
CONT_AWD_W58RGZ20F0477_9700_W58RGZ20D0075_9700
GOODRICH CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2020: $445,414.90
- FY2022: $0
- MAINTENANCE AND OVERHAUL OF THE TAIL ROTOR SWASHPLATE.
CONT_AWD_W58RGZ20F0478_9700_W58RGZ20D0065_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $90,918.90
- NOUN: CONVERSION SWASHPLATE CONTROL INPUT NSN: 1615-01-508-4118 OUTPUT NSN: 1615-01-599-5169 INPUT PART NUMBER: 7-511527038-103 OUTPUT PART NUMBER: 7-511527038-105 QUANTITY: 50 EACH UNIT PRICE: $27,714.77 TOTAL DOLLAR VALUE: $1,385,738.50.
CONT_AWD_W58RGZ20F0540_9700_W58RGZ20D0065_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2020: $1,385,738.50
- FY2021: $0
- FY2022: $23,009.60
- FY2023: $0
- V14 SOFTWARE UPLOADING INTO AH-64D AC AT 8 DIFFERENT LOCATIONS, ALONG WITH ANY POTENTIAL CIU UPGRADES.
CONT_AWD_W58RGZ20F0546_9700_W58RGZ15G0001_9700
THE BOEING COMPANY · Award title or description names the program
V14 SOFTWARE UPLOADING INTO AH-64D AC AT 8 DIFFERENT LOCATIONS, ALONG WITH ANY POTENTIAL CIU UPGRADES.
- FY2020: $346,713
- FY2021: $199,199
- FY2023: −$248,480
- FY2025: −$86,173.66
- FY2026: $13,126.66
- NEW CONTRACT FOR HIGH PERFORMANCE SHOCK STRUTS FOR THE APACHE AH-64 HELICOPTER
CONT_AWD_W58RGZ21C0008_9700_-NONE-_-NONE-
GOODRICH CORPORATION · Award title or description names the program
NEW CONTRACT FOR HIGH PERFORMANCE SHOCK STRUTS FOR THE APACHE AH-64 HELICOPTER
- FY2021: $9,879,936
- FY2022: $5,029,824
- FY2023: $5,186,496
- SWASHPLATE CONTROL
CONT_AWD_W58RGZ21F0175_9700_W58RGZ20D0052_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2021: $1,183,750.92
- FY2023: −$58,530.18
- CONTRACT: APACHE USG IDIQ TO: FDHU
CONT_AWD_W58RGZ21F0424_9700_W58RGZ21D0077_9700
THE BOEING COMPANY · Award title or description names the program
CONTRACT: APACHE USG IDIQ TO: FDHU
- FY2021: $355,539
- FY2022: $0
- FY2023: $0
- FY2025: $0
- CH ASSEMBLY,FRI NSN: 3010-01-515-8483
CONT_AWD_W58RGZ21F0466_9700_W58RGZ19D0050_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2021: $1,460,647.20
- FY2022: $0
- INERTIAL BORESIGHT NSN: 6650-01-656-2050
CONT_AWD_W58RGZ21F0476_9700_W58RGZ18D0047_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2021: $131,425.80
- FY2022: $0
- FY2023: $40,843.73
- FY2025: $0
- INTEGRATION OF IMPROVED TURBINE ENGINE - APACHE PHASE II
CONT_AWD_W58RGZ22C0016_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
INTEGRATION OF IMPROVED TURBINE ENGINE - APACHE PHASE II
- FY2022: $19,260,000
- FY2023: $28,752,000
- FY2024: $2,500,000
- CLUCH ASSEMBLY, FRI NSN: 3010-01-515-8483
CONT_AWD_W58RGZ22F0092_9700_W58RGZ19D0050_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2022: $1,504,485
- AWARD OF THE VERSION 6X CONFIGURATION TASK ORDER.
CONT_AWD_W58RGZ22F0140_9700_W58RGZ21D0077_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $181,600,514
- FY2023: $11,921,280.47
- FY2024: $26,459,034.39
- FY2025: $7,899,121.84
- FY2026: $9,054,641.52
- APACHE ATTACK HELICOPTER MANNED-UNMANNED TEAMING - EXPANDED INTERACTIVE ELECTRONIC TECHNICAL MANUAL UPDATES
CONT_AWD_W58RGZ22F0161_9700_W58RGZ21D0077_9700
THE BOEING COMPANY · Award title or description names the program
APACHE ATTACK HELICOPTER MANNED-UNMANNED TEAMING - EXPANDED INTERACTIVE ELECTRONIC TECHNICAL MANUAL UPDATES
- FY2022: $710,500
- FY2023: $782,215
- FY2024: $350,082
- FY2025: −$345,377
- FY2026: −$74,067.96
- AH-64 APACHE CONTRACTOR FIELD SERVICE REPRESENTATIVE SUPPORT.
CONT_AWD_W58RGZ22F0314_9700_W58RGZ21D0006_9700
BOEING AEROSPACE OPERATIONS, INC. · Award title or description names the program
AH-64 APACHE CONTRACTOR FIELD SERVICE REPRESENTATIVE SUPPORT.
- FY2022: $466,242.93
- FY2023: $0
- FY2024: −$3,787.02
- FY2026: −$57,012.57
- NOUN: SWASHPLATE CONTROL NSN: 1615-01-599-5169 P/N: 7-511527038-105
CONT_AWD_W58RGZ22F0343_9700_W58RGZ20D0065_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $593,281.80
- FY2024: $15,753.66
- FY2025: $5,884.65
- FY2026: $0
- MAINTENANCE AND OVERHAUL/REPAIR OF RECEIVER-TRANSMITTER RADIO, NSN: 5820-01-616-4187 AND AMPLIFIER, RADIO FREQUENCY, NSN: 5996-01-616-4318.
CONT_AWD_W58RGZ22F0349_9700_W58RGZ22D0020_9700
L3 TECHNOLOGIES, INC. · Program office statement
AH-64E REMANUFACTURE
- FY2022: $1,535,798
- FY2023: $1,143,866
- FY2024: −$44,016
- FY2025: $11,385
- PANEL,POWER BUS,CIR NSN: 6110-01-616-2052
CONT_AWD_W58RGZ22F0434_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $23,386.08
- SHELF ASSY, FWD-LH. PN: 7-611115120-127
CONT_AWD_W58RGZ22F0455_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2022: $46,915.80
- AH-64 SHELF ASSY,FWD,LH
CONT_AWD_W58RGZ22P0005_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
AH-64 SHELF ASSY,FWD,LH
- FY2022: $62,048
- AIRCRAFT FRAME, P/N 7-311113599-9, NSN 1560-01-586-9470
CONT_AWD_W58RGZ23F0066_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $31,332.43
- DELIVERY ORDER FOR OVERHAUL OF PROCESSOR, SIGNAL DA NSN: 1270-01-544-6370 PRON: AX3M6126AX
CONT_AWD_W58RGZ23F0078_9700_W58RGZ19D0052_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E REMANUFACTURE
- FY2023: $1,696,700
- FY2024: $0
- MAINTENANCE AND OVERHAUL OF THE COMPOSITE MAIN ROTOR BLADE.
CONT_AWD_W58RGZ23F0104_9700_W58RGZ20D0053_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $2,389,568.40
- FY2024: $0
- FY2025: $0
- FY2026: −$2,047,954.48
- AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATION KIT
CONT_AWD_W58RGZ23F0189_9700_W58RGZ23D0019_9700
DRS TRAINING & CONTROL SYSTEMS, LLC · Award title or description names the program
AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATION KIT
- FY2023: $2,600,000
- FY2024: $234,350
- FY2025: $9,557
- AH-64 APACHE INERTIAL BORESIGHT NSN: 6650-01-656-2050
CONT_AWD_W58RGZ23F0239_9700_W58RGZ18D0047_9700
THE BOEING COMPANY · Award title or description names the program
AH-64 APACHE INERTIAL BORESIGHT NSN: 6650-01-656-2050
- FY2023: $270,098.78
- FY2024: −$16,427.40
- FY2025: $8,058.34
- UCA TASK ORDER FOR OIL COOLED GENERATORS
CONT_AWD_W58RGZ23F0347_9700_W58RGZ21D0077_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $8,226,000
- FY2025: $21,806,390.51
- FY2026: $32,048,225
- MAINTENANCE AND OVERHAUL FOR APACHE AH-64 SWASHPLATE CONTROL NSN: 1615-01-599-5172
CONT_AWD_W58RGZ23F0367_9700_W58RGZ20D0052_9700
THE BOEING COMPANY · Award title or description names the program
MAINTENANCE AND OVERHAUL FOR APACHE AH-64 SWASHPLATE CONTROL NSN: 1615-01-599-5172
- FY2023: $2,455,277.25
- FY2025: $21,134.16
- TAIL ROTOR SWASHPLATE CONTROL
CONT_AWD_W58RGZ23F0402_9700_W58RGZ20D0065_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2023: $605,152.80
- FY2025: $7,146.18
- FY2026: $11,910.30
- MODERNIZED-RADAR FREQUENCY INTERFEROMETER (M-RFI) PRODUCTION, SUSTAINMENT HARDWARE, AND TECHNICAL, LOGISTICAL, TEST, AND ENGINEERING SUPPORT
CONT_AWD_W58RGZ23F0435_9700_W52P1J18D0061_9700
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2023: $60,539,401.13
- FY2024: $484,424.10
- FY2025: $577,515.22
- MODERNIZED-RADAR FREQUENCY INTERFEROMETER (M-RFI) PRODUCTION, SUSTAINMENT HARDWARE, AND TECHNICAL, LOGISTICAL, TEST, AND ENGINEERING SUPPORT
CONT_AWD_W58RGZ23F0496_9700_W52P1J18D0061_9700
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2023: $5,413,531.06
- FY2025: $0
- CONTRACT: APACHE USG IDIQ TO: V4 CIRCM TRANSPORTABILITY
CONT_AWD_W58RGZ23F0505_9700_W58RGZ21D0077_9700
THE BOEING COMPANY · Award title or description names the program
CONTRACT: APACHE USG IDIQ TO: V4 CIRCM TRANSPORTABILITY
- FY2023: $364,748
- FY2024: $1,445,500
- FY2025: $282,809
- MAINTENANCE AND OVERHAUL OF SWASHPLATE CONTROL FOR AH-64 NSN: 1615-01-599-5169 P/N: 7-511527038-105
CONT_AWD_W58RGZ23F0511_9700_W58RGZ20D0065_9700
THE BOEING COMPANY · Award title or description names the program
MAINTENANCE AND OVERHAUL OF SWASHPLATE CONTROL FOR AH-64 NSN: 1615-01-599-5169 P/N: 7-511527038-105
- FY2023: $453,864.60
- FY2024: $0
- FY2026: $13,101.33
- MAINTENANCE AND OVERHAUL/REPAIR OF RECEIVER-TRANSMITTER RADIO, NSN: 5820-01-616-4187
CONT_AWD_W58RGZ23F0548_9700_W58RGZ22D0020_9700
L3 TECHNOLOGIES, INC. · Program office statement
AH-64E REMANUFACTURE
- FY2024: $17,370
- FY2025: $0
- APACHE PERFORMANCE BASED LOGISTICS (PBL) V SERVICES OF AIRFRAME COMPONENTS FOR THE UNITED STATES GOVERNMENT'S AH-64 APACHE FLEET.
CONT_AWD_W58RGZ24C0028_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
APACHE PERFORMANCE BASED LOGISTICS (PBL) V SERVICES OF AIRFRAME COMPONENTS FOR THE UNITED STATES GOVERNMENT'S AH-64 APACHE FLEET.
- FY2024: $179,626,073.50
- FY2025: $214,121,929.74
- FY2026: $112,386,735.71
- 1-YEAR NTE BASE AWARD OF A UCA TO PROVIDE MAINTENANCE AUGMENTATION TEAM (MAT) SERVICES FOR THE QATAR ARMED FORCES (QAF) CONSISTING OF 24 AH-64E APACHE AIRCRAFT. THIS IS A FOLLOW-ON EFFORT TO CONTRACT W58RGZ-19-C-0008.
CONT_AWD_W58RGZ24C0036_9700_-NONE-_-NONE-
THE BOEING COMPANY · Award title or description names the program
1-YEAR NTE BASE AWARD OF A UCA TO PROVIDE MAINTENANCE AUGMENTATION TEAM (MAT) SERVICES FOR THE QATAR ARMED FORCES (QAF) CONSISTING OF 24 AH-64E APACHE AIRCRAFT. THIS IS A FOLLOW-ON EFFORT TO CONTRACT W58RGZ-19-C-0008.
- FY2024: $6,990,000
- FY2025: $15,480,181.08
- FY2026: $135,583
- MAINTENANCE AND OVERHAUL OF THE AH-64 COSSI CLUTCH ASSEMBLY NSN: 3010-01-515-8483
CONT_AWD_W58RGZ24C0046_9700_-NONE-_-NONE-
HONEYWELL INTERNATIONAL INC. · Award title or description names the program
MAINTENANCE AND OVERHAUL OF THE AH-64 COSSI CLUTCH ASSEMBLY NSN: 3010-01-515-8483
- FY2024: $4,299,318
- FY2025: $0
- FY2026: $0
- AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATON KIT
CONT_AWD_W58RGZ24F0236_9700_W58RGZ23D0019_9700
DRS TRAINING & CONTROL SYSTEMS, LLC · Award title or description names the program
AH-64 DIGITAL CAPTIVE BORESIGHT HARMONIZATON KIT
- FY2024: $2,055,100
- FY2025: $26,122
- FY2026: $0
- MAINTENANCE AND OVERHAUL/REPAIR OF RECEIVER-TRANSMITTER RADIO, NSN: 5820-01-616-4187
CONT_AWD_W58RGZ24F0244_9700_W58RGZ22D0020_9700
L3 TECHNOLOGIES, INC. · Program office statement
AH-64E REMANUFACTURE
- FY2024: $904,460
- PART NUMBER: 7-311112003-47 BOW BEAM ASSY FWD
CONT_AWD_W58RGZ24F0430_9700_SPE4A119G0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2024: $18,690.48
- FIRE CONTROL RADAR (FCR) PRODUCTION
CONT_AWD_W58RGZ25C0001_9700_-NONE-_-NONE-
LONGBOW LLC · Program office statement
AH-64E REMANUFACTURE
- FY2025: $198,476,068.86
- FY2026: $0
- MAINTENANCE AND OVERHAUL FOR THE APACHE HELICOPTER SWASHPLATE CONTROL, NATIONAL STOCK NUMBER: 1615-01-599-5172
CONT_AWD_W58RGZ25F0175_9700_W58RGZ20D0052_9700
THE BOEING COMPANY · Award title or description names the program
MAINTENANCE AND OVERHAUL FOR THE APACHE HELICOPTER SWASHPLATE CONTROL, NATIONAL STOCK NUMBER: 1615-01-599-5172
- FY2025: $1,842,953.50
- MAINTENANCE AND OVERHAUL OF SWASHPLATE CONTROL FOR APACHE HELICOPTER
CONT_AWD_W58RGZ25F0181_9700_W58RGZ20D0065_9700
THE BOEING COMPANY · Award title or description names the program
MAINTENANCE AND OVERHAUL OF SWASHPLATE CONTROL FOR APACHE HELICOPTER
- FY2025: $615,187.60
- TASK ORDER FOR AH-64E REMAPPING OF 3 AIRCRAFTS.
CONT_AWD_W58RGZ25F0307_9700_W58RGZ21D0077_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER FOR AH-64E REMAPPING OF 3 AIRCRAFTS.
- FY2025: $196,000
- FY2026: $0
- AH-64 DIGITAL CAPTIVEE BORESIGHT HARMONIZATION KIT
CONT_AWD_W58RGZ25F0426_9700_W58RGZ23D0019_9700
DRS TRAINING & CONTROL SYSTEMS, LLC · Award title or description names the program
AH-64 DIGITAL CAPTIVEE BORESIGHT HARMONIZATION KIT
- FY2025: $1,905,390
- FY2026: $0
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF THE UNITED ARAB EMIRATES (UAE).
CONT_AWD_W58RGZ26F0114_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF THE UNITED ARAB EMIRATES (UAE).
- FY2026: $13,349,309
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF TAIWAN.
CONT_AWD_W58RGZ26F0115_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF TAIWAN.
- FY2026: $9,227,485
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF THE ROYAL MOROCCAN AIR FORCE (RMAF).
CONT_AWD_W58RGZ26F0116_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF THE ROYAL MOROCCAN AIR FORCE (RMAF).
- FY2026: $5,521,909
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF KOREA
CONT_AWD_W58RGZ26F0117_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF KOREA
- FY2026: $9,130,739
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF EGYPTIAN AIR FORCE (EAF).
CONT_AWD_W58RGZ26F0118_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF EGYPTIAN AIR FORCE (EAF).
- FY2026: $3,145,246
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF KUWAIT.
CONT_AWD_W58RGZ26F0119_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF KUWAIT.
- FY2026: $3,872,658
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRFRAME PPSS IN SUPPORT OF INDONESIA.
CONT_AWD_W58RGZ26F0120_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRFRAME PPSS IN SUPPORT OF INDONESIA.
- FY2026: $4,040,134.04
- TASK ORDER UNDER INDEFINITE DELIVERY INDEFINITE QUANTITY FOR FOREIGN MILITARY SALES POST-PRODUCTION SUPPORT SERVICES
CONT_AWD_W58RGZ26F0121_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2026: $11,487,320
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF SAUDI MNG.
CONT_AWD_W58RGZ26F0122_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF SAUDI MNG.
- FY2026: $13,763,166
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF AUSTRALIA
CONT_AWD_W58RGZ26F0123_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF AUSTRALIA
- FY2026: $5,573,593
- TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF NETHERLANDS.
CONT_AWD_W58RGZ26F0124_9700_W58RGZ26D0013_9700
THE BOEING COMPANY · Award title or description names the program
TASK ORDER UNDER IDIQ II W58RGZ-26-D-0013 FOR APACHE AIRCRAFT PPSS IN SUPPORT OF NETHERLANDS.
- FY2026: $1,513,737
- APACHE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) FOR ENGINEERING AND TECHNICAL SUPPORT OPEN SYSTEM INTEGRATION (OSI) AND AIRWORTHINESS RELEASE (AWR)
CONT_AWD_W58RGZ26F0179_9700_W58RGZ21D0077_9700
THE BOEING COMPANY · Award title or description names the program
APACHE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) FOR ENGINEERING AND TECHNICAL SUPPORT OPEN SYSTEM INTEGRATION (OSI) AND AIRWORTHINESS RELEASE (AWR)
- FY2026: $397,880
- SPARES SOLD TO FMS NE
CONT_AWD_ZB01_9700_SPE4A115G0005_9700
LOCKHEED MARTIN CORPORATION · Program office statement
AH-64E NEW BUILD
- FY2016: $10,249
- FY2017: $0
- SPARES
CONT_AWD_ZB01_9700_SPE4A117G0007_9700
HONEYWELL INTERNATIONAL INC. · Program office statement
AH-64E NEW BUILD
- FY2017: $80,904.95
- STRAP ASSY, MAIN
CONT_AWD_ZB01_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $37,455,778
- FY2019: −$34,896,400
- FY2020: $0
- COOLER, FLUID, TRANSMISSION
CONT_AWD_ZB02_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $390,473.65
- STRUT ASSY
CONT_AWD_ZB03_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2015: $797,440
- FY2016: $0
- FY2017: $0
- FY2018: $0
- SPARE PARTS LEVER, REMOTE CONTRO
CONT_AWD_ZB03_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $687,708
- NSN: 1615-01-163-9507 PART NUMBER: 7-311160085-2
CONT_AWD_ZB04_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2015: $662,000
- SUPPORT ASSEMBLY
CONT_AWD_ZB04_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $3,155,613
- FY2019: $0
- FY2021: $0
- SPAR BOX ASSEMBLY
CONT_AWD_ZB05_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $4,245,551.10
- SPARES
CONT_AWD_ZB06_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $278,070
- BLADE,ROTARY RUDDER
CONT_AWD_ZB07_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $21,966,000
- FY2019: $0
- SPAR BOX ASSEMBLY NSN 1560-01-465-6856 P/N 7-311122601-601
CONT_AWD_ZB08_9700_SPRPA118D002U_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $4,852,058.40
- FY2021: $0
- FY2022: $0
- CONNECTING LINK, RIG
CONT_AWD_ZB09_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $628,055.75
- FY2018: $0
- FY2019: $0
- BELL CRANK
CONT_AWD_ZB10_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $657,919.50
- FY2017: $0
- FY2018: $0
- CLUTCH ASSEMBLY, FRI NSN: 3010-01-364-2470 P/N: 7-31130003-9
CONT_AWD_ZB11_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $477,057.26
- FY2018: −$310,633.96
- SPARES
CONT_AWD_ZB17_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2016: $13,394.10
- CONNECTING LINK, RIG
CONT_AWD_ZB19_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2016: $318,860
- SPARES
CONT_AWD_ZB21_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $103,744.60
- SPARES
CONT_AWD_ZB22_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $1,084,400
- FY2018: −$975,960
- SPARES
CONT_AWD_ZB24_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $14,890
- CLUTCH ASSEMBLY,FRI
CONT_AWD_ZB26_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $1,197,503
- FY2018: $310,633
- SPARES
CONT_AWD_ZB29_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $52,418.34
- SPARES
CONT_AWD_ZB30_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $435,844
- FY2019: $0
- FITTING STRUCTURAL
CONT_AWD_ZB32_9700_SPRPA111G001Y_9700
SIKORSKY AIRCRAFT CORPORATION · Program office statement
AH-64E REMANUFACTURE
- FY2015: $25,980
- SPARES
CONT_AWD_ZB37_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $155,402.50
- FY2018: −$155,402.50
- SPARES
CONT_AWD_ZB38_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $321,713
- SPARES BRACKET ASSEMBLY
CONT_AWD_ZB40_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $876,193.78
- FY2019: $0
- CONNECTING LINK, RIG
CONT_AWD_ZB41_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $223,244
- FY2019: $0
- STRUT, ROTOR
CONT_AWD_ZB42_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $156,920.25
- FY2019: $0
- STRUT, ROTOR
CONT_AWD_ZB43_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $438,062
- FY2019: $0
- KIT, GENERATOR
CONT_AWD_ZB44_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $273,800.10
- FY2018: $0
- CARRIER ASSEMBLY,TR
CONT_AWD_ZB47_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $216,183.50
- FY2018: −$216,183.50
- SPARES
CONT_AWD_ZB48_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $2,990,536
- FY2020: $0
- FY2021: $0
- SPAR BOX ASSEMBLY
CONT_AWD_ZB49_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $3,475,010
- BRACKET ASSY,ACTUAT
CONT_AWD_ZB50_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $923,458.70
- FY2018: −$125,308.70
- SERVICE KIT, ENVIRON
CONT_AWD_ZB52_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $188,693.60
- CONNECTING LINK, RIG
CONT_AWD_ZB55_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $572,186.25
- SPARES
CONT_AWD_ZB58_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2017: $72,395.05
- STRUT, ROTOR
CONT_AWD_ZB60_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2017: $502,494
- SPARES
CONT_AWD_ZB62_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $56,073.05
- FY2019: $0
- PITCH LINK ASSEMBLY APACHE SPARES
CONT_AWD_ZB66_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Award title or description names the program
PITCH LINK ASSEMBLY APACHE SPARES
- FY2018: $8,473,500
- FY2021: $0
- FY2022: $0
- FY2023: $0
- ARM ASSEMBLY, TAIL GEAR
CONT_AWD_ZB67_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $510,709.50
- FY2021: $0
- ACCESSORY KIT, ENVIRONMENTAL
CONT_AWD_ZB68_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $215,743.76
- STRUT ASSEMBLY, ROTOR S
CONT_AWD_ZB69_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E REMANUFACTURE
- FY2018: $21,430
- SPARES
CONT_AWD_ZB78_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $226,949.80
- FY2019: $0
- BLADES
CONT_AWD_ZB81_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $39,169,336
- FY2019: −$685,062
- SPARES
CONT_AWD_ZB86_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $305,215.68
- SPARES
CONT_AWD_ZB87_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $132,075.45
- SPARES
CONT_AWD_ZB93_9700_SPE4A114G0007_9700
THE BOEING COMPANY · Program office statement
AH-64E NEW BUILD
- FY2018: $306,324.95
USAspending awards reviewed as belonging to this program, matched on the exact award key, never on a similar name. Net obligations through Oct 6, 2026; later years are partial. The appropriation that paid for an award is not identified, so obligations are not compared with the enacted column.
Method
Four measures
- Requested
- What a budget request asked for. Not money Congress provided.
- Enacted
- What a law provided, or a spend plan's allocation of a law's lump sum.
- Announced ceiling
- The most a contract vehicle or agreement could be worth, as announced. Not spending.
- Obligated
- Net obligations on USAspending actions of the awards linked to the program. The funding account is not identified.
An announced ceiling is not spending
Figures come from the budget justification books, public laws and agency announcements named in the evidence table; where a source shows no amount the tracker says so rather than showing zero, and where DefDex has not yet checked a source it says that too. See the methodology for how federal obligations are counted.