Technology · Nuclear energy and propulsion
Microreactors
Microreactors are compact nuclear reactors designed for factory fabrication and transport to a deployment site.
Buying Context
Programs linked through published system relationships or reviewed citations. A program link does not allocate its budget to this capability or identify a builder’s contract wins.
Assessment
Case for · why it matters
CRS reports DOD is funding a prototype mobile high-temperature gas-cooled microreactor to provide power for military bases and other defense needs.
Case against · the skeptic’s view
CRS notes many advanced reactor technologies are still at the conceptual or design stage, so their potential advantages have not been established commercially.
Who Builds It18
Fielded0
- —
Limited fielding0
- —
Prototype3
Development13
Research0
- —
Concept0
- —
Not rated: 2 builders have no maturity rating.
- Aalo AtomicsDeveloper · USCritical Test Reactor (Aalo-X campus, INL) reached zero-power criticality on 2026-07-04.Prototype
- Antares NuclearDeveloper · USMark-0 reached zero-power criticality at INL on 2026-06-04 (first under the DOE Reactor Pilot Program); Army Janus awardee (Fort Bragg).Prototype
- Valar AtomicsDeveloper · USWard 250 (100 kWt HTGR test reactor) reached zero-power criticality at the Utah San Rafael Energy Lab on 2026-06-18.Prototype
- Bluecore EnergyDeveloper · USDevelopment
- BWXT Advanced TechnologiesDeveloper · USBuilds the Project Pele prototype (core assembly ongoing in 2026) and BANR for Army Janus (Fort Campbell).Development
- BWX TechnologiesDeveloper · USThrough BWXT Advanced Technologies: Project Pele prototype and BANR (Army Janus, Fort Campbell).Development
- General Atomics Electromagnetic SystemsDeveloper · USGeneral Atomics Tactical Energy System (GA-TES); Army Janus awardee (Fort Hood).Development
- Hadron EnergyDeveloper · USDevelopment
- Last EnergyDeveloper · USPWR-5 pilot under construction at Texas A&M-RELLIS (DOE PDSA approved May 2026); not yet critical.Development
- NANO Nuclear EnergyDeveloper · USKRONOS MMR (3.5-15 MWe, NRC construction-permit pre-application) and ZEUS (first core hardware assembled for non-nuclear testing in 2025).Development
- OkloDeveloper · USAir Force Notice of Intent to Award (June 2025) for a licensed microreactor at Eielson AFB; Aurora-INL reactor under construction under DOE authorization.Development
- RadiantDeveloper · USKaleidos shipped to INL's DOME in August 2026 for a fueled test campaign; no criticality reported as of 2026-10-07. Army Janus awardee (Fort Benning).Development
- Westinghouse Electric CompanyDeveloper · USeVinci heat-pipe microreactor (5 MWe); selected for the Army Janus Program through Westinghouse Government Services (Fort Drum).Development
- Westinghouse Government ServicesDeveloper · USArmy Janus awardee (Fort Drum) for the Westinghouse eVinci microreactor.Development
- X-energyDeveloper · USXENITH, first developed for DoW Project Pele; ANPI agreement with DIU and the Department of the Air Force (2025).Development
Showing 1–15 of 18 organizations
Placed by each organization's own maturity for this technology; TRL is self-reported or estimated, see confidence.
Systems15
| Aurora powerhouse↗ | Oklo | Other | Development | — |
| BWXT Advanced Nuclear Reactor (BANR)↗ | BWXT Advanced Technologies | Other | Development | — |
| eVinci microreactor↗ | Westinghouse Government Services | Other | Development | — |
| General Atomics Tactical Energy System (GA-TES)↗ | General Atomics Electromagnetic Systems | Other | Development | — |
| KRONOS MMR↗ | NANO Nuclear Energy | Other | Development | — |
| XENITH↗ | X-energy | Other | Development | — |
| ZEUS↗ | NANO Nuclear Energy | Other | Development | — |
| Kaleidos↗ | Radiant | Other | Prototype | — |
| Ward 250↗ | Valar Atomics | Other | Prototype | — |
Showing 1–9 of 15 systems
