Program · United States · U.S. Marine Corps
CH-53K King Stallion
Heavy-lift helicopter designed to transport troops, equipment, and supplies.
The profile’s obligated figure counts resolved program awards from reported acquisition codes and reviewed links, with shared awards excluded; the tracker counts catalog fiscal years of resolved reviewed award links, so the figures can differ. The budget tracker separates requested, enacted, announced ceiling and obligated amounts for FY2025–FY2027: CH-53K King Stallion figures cover R-1 program elements 0605212M; P-1 lines 1506 CH-53K (Heavy Lift). Current-year advance procurement is not included. Where the exhibit prints a net after Less: Advance Procurement, the aircraft line is that printed net. Obligations are only the USAspending awards carrying reviewed DoW acquisition program code 390 (CH-53K). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.
About
The CH-53K King Stallion is the Marine Corps' new-build heavy-lift helicopter developed to replace the CH-53E. It transports Marines, heavy equipment and supplies from ship to shore and during subsequent land operations. Its design increases lift capability for hot, high-altitude naval operating conditions and includes features for operations in degraded visibility, while retaining compatibility with shipboard employment.
News5
- Jun 30, 2020Government record (high significance)Department of DefenseContracts For Jun. 30, 2020
- Mar 20, 2020NewsDefense NewsHow coronavirus could impact the defense supply chain
- Mar 12, 2019News (high significance)USNI NewsFY 2020 Budget: Navy Cuts Ship, Aircraft Procurement; Vows High-End Weapons Procurement
- Mar 13, 2018Government record (high significance)DOD NewsTrump Salutes Military, Highlights Commitment to Increased Defense Spending
- Mar 10, 2017NewsUSNI NewsLawmaker Worries Marine Corps Investing Too Heavily In Aviation Over Ground Vehicles
Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Totals · 2 | ||
| Development estimateHistorical SAR estimate reported by GAO in 2021. | $8.098BThen-year $ | Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019 |
| Lifetime O&S estimateProgram estimate through FY2061; not annual cost or an award. | $81.467BThen-year $ | Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019 |
| Unit costs · 1 | ||
| Acquisition / planned operational helicopterDerived: $34.0362B acquisition / 200 operational helicopters. Includes development and military construction. Not official APUC or a production-lot price. | $170.181MThen-year $ | Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019 |
| Quantities · 2 | ||
| Delivered to U.S. MarinesManufacturer-reported cumulative deliveries, not mission-ready or present-day inventory. | 20U.S. only | Five-year contract for up to 99 CH-53Ks Lockheed Martin · Sep 26, 2025 |
| Program of recordU.S. Marine Corps objective. | 200U.S. only | Five-year contract for up to 99 CH-53Ks Lockheed Martin · Sep 26, 2025 |
| Operating costs · 1 | ||
| Reimbursement / flight hourPublished reimbursement rate for use by another DoD component. This is a billing rate, not the fully burdened cost of ownership. | $14,092 / hrNominal $; other DoD component | FY2026 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2026 |
Totals · 2
- Development estimateHistorical SAR estimate reported by GAO in 2021.Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019$8.098BThen-year $
- Lifetime O&S estimateProgram estimate through FY2061; not annual cost or an award.Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019$81.467BThen-year $
Unit costs · 1
- Acquisition / planned operational helicopterDerived: $34.0362B acquisition / 200 operational helicopters. Includes development and military construction. Not official APUC or a production-lot price.Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019$170.181MThen-year $
Quantities · 2
- Delivered to U.S. MarinesManufacturer-reported cumulative deliveries, not mission-ready or present-day inventory.Five-year contract for up to 99 CH-53Ks Lockheed Martin · Sep 26, 202520U.S. only
- Program of recordU.S. Marine Corps objective.Five-year contract for up to 99 CH-53Ks Lockheed Martin · Sep 26, 2025200U.S. only
Operating costs · 1
- Reimbursement / flight hourPublished reimbursement rate for use by another DoD component. This is a billing rate, not the fully burdened cost of ownership.FY2026 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2026$14,092 / hrNominal $; other DoD component
Earlier observations · 5
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| Totals · 3 | ||
| Development estimateInitial operational quantity 156; later increased to 200. | $4.366BThen-year $ | Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2005 |
| Development estimateProduction baseline. | $6.958BThen-year $ | Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2017 |
| Development estimateChanges reflect requirements, quantities, delays and nominal dollars. | $8.098BThen-year $ | Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019 |
| Operating costs · 2 | ||
| Reimbursement / flight hour1 | $23,516 / hrNominal $; other DoD component | FY2025 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2025 |
| Reimbursement / flight hour1 | $14,092 / hrNominal $; other DoD component | FY2026 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2026 |
Totals · 3
- Development estimateInitial operational quantity 156; later increased to 200.Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2005$4.366BThen-year $
- Development estimateProduction baseline.Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2017$6.958BThen-year $
- Development estimateChanges reflect requirements, quantities, delays and nominal dollars.Heavy Lift Helicopter Program (Table 6, Dec. 2019 estimates) GAO · figure Dec 2019$8.098BThen-year $
Operating costs · 2
- Reimbursement / flight hour1FY2025 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2025$23,516 / hrNominal $; other DoD component
- Reimbursement / flight hour1FY2026 aircraft hourly reimbursement rates, Other DoD Component column DoD Comptroller · figure FY2026$14,092 / hrNominal $; other DoD component
1Published reimbursement rate for use by another DoD component. This is a billing rate, not the fully burdened cost of ownership.
Contracts & purchasing · 2
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Stated amount | Qty | Source |
|---|---|---|---|---|
| U.S. Navy / Marine Corps → SikorskyUp to 99 helicopters; Lots 9–13, deliveries planned 2029–2034. Ceiling is not money already spent; international orders may use the contract. | Maximum multiyear contract | $10.855B announced ceiling (not spending) | 99 | Five-year contract for up to 99 CH-53Ks Lockheed Martin · Sep 26, 2025 |
| Israel via U.S. Navy FMS → SikorskyAnnouncement covers first four of a 12-aircraft agreement; do not treat all 12 as delivered. | Production award / signed LOA | Amount not stated | 12 | Contract to build CH-53Ks for Israel Lockheed Martin · Feb 15, 2022 |
International buyers · 1
| Country | Qty | Status | Source |
|---|---|---|---|
| IsraelFirst four in the announced production action. Updated delivery status not verified. | 12 | Signed LOA | Contract to build CH-53Ks for Israel Lockheed Martin · Feb 15, 2022 |
Open research: Updated acquisition and R&D estimates beyond the 2019 SAR remain to be reconciled.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
Contracts$12.79B obligated on code-mapped awards
- Code-mapped awards are every contract award in the USAspending baseline (DoD, DHS, DOE and NASA, FY2008–FY2027) whose latest reported acquisition program code is this program's, whichever company received it; vehicles (IDVs) are excluded.
By fiscal year14
| Fiscal year | Obligated | Actions |
|---|---|---|
| FY2011 | $431K obligated | 2 |
| FY2012 | $0 obligated | 3 |
| FY2015 | $3.4M obligated | 28 |
| FY2016 | $6.6M obligated | 17 |
| FY2017 | $72.8M obligated | 28 |
| FY2018 | $336M obligated | 22 |
| FY2019 | $286M obligated | 128 |
| FY2020 | $284M obligated | 177 |
| FY2021 | $1.45B obligated | 198 |
| FY2022 | $1.87B obligated | 169 |
| FY2023 | $2.33B obligated | 207 |
| FY2024 | $2.17B obligated | 195 |
| FY2025 | $2.11B obligated | 152 |
| FY2026 | $1.88B obligated | 101 |
Contractors26
- Lockheed Martin$11.15B obligated 87%
- GE Aerospace$1.50B obligated 12%
- Robertson Fuel Systems$52.3M obligated 0.4%
- RTX$30.6M obligated 0.2%
- Telephonics Corporation$7.5M obligated 0.1%
- Coherent Technical Services, Inc.$6.1M obligated 0.0%
- Triman Industries$5.4M obligated 0.0%
- Allclear Aerospace & Defense, Inc.$3.8M obligated 0.0%
- TransDigm Group$2.1M obligated 0.0%
- Mercury Systems$2.1M obligated 0.0%
- AMETEK$1.8M obligated 0.0%
- Hydro-Aire Aerospace Corp.$1.2M obligated 0.0%
- Other companies (14)$4.8M obligated 0.0%
- Recipients without a DefDex profile (81 awards)$22.7M obligated 0.2%
Reported acquisition program code 390; program scope may be incomplete or miscoded · 299 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.
Participants3
Prime
3- GE AerospaceConfirmed

- Lockheed MartinConfirmed

- SikorskyConfirmed

Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.
Budget Lines
- 0605212M
- APN P-1 line 6
- APN P-1 line 7
Budget line items recorded for this program.