Skip to content
DefDex
GMLRS rocket pods staged on the ground before a fire mission during Exercise Koolendong, Australia

Program · United States · U.S. Army

Guided Multiple Launch Rocket System (GMLRS)

Precision-guided artillery rocket family for MLRS and HIMARS launchers.

Updated
ProductionU.S. ArmyGMLRSGuided MLRSER GMLRSExtended Range GMLRS

The profile’s obligated figure counts resolved program awards from reported acquisition codes and reviewed links, with shared awards excluded; the tracker counts catalog fiscal years of resolved reviewed award links, so the figures can differ. The budget tracker separates requested, enacted, announced ceiling and obligated amounts for FY2025–FY2027: Guided Multiple Launch Rocket System (GMLRS) figures cover R-1 program elements 0205778A; P-1 lines 1109 Guided MLRS Rocket (GMLRS), 2032 Guided MLRS Rocket (GMLRS). Current-year advance procurement is not included. Where the exhibit prints a net after Less: Advance Procurement, the rocket line is that printed net. Obligations are only the USAspending awards carrying reviewed DoW acquisition program code 260 (GMLRS/GMLRS AW). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.

About

The Guided Multiple Launch Rocket System is the Army's precision-guided rocket family for HIMARS and M270 launchers. Managed by the Strategic and Operational Rockets and Missiles project office and manufactured by Lockheed Martin, it supports precision fires against distant targets. The Extended Range GMLRS effort increases intended reach to as much as 150 kilometers; the Army celebrated production of the 50,000th GMLRS rocket in November 2020.

News5

Timeline1

  1. UpgradeConfirmed

    First GMLRS Unitary rounds delivered

    First 72 Unitary-variant rounds. Year precision retained because manufacturer releases differ between May and June 2005. This is not first delivery of the full GMLRS family.

    SourcesLockheed Martin

Program and variant milestones. Dates show only the precision the sources give.

Cost to the Government

Totals · 3

Unit costs · 2

Quantities · 2

  • ER Unitary requested roundsC64416 subset, not the GMLRS family total. P-5a anticipates first delivery in February 2028.
    228U.S. only; stated source scope
  • U.S. inventoryA current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.
    Source not recorded
    Not established

Operating costs · 1

  • Annual operations & supportA complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.
    Source not recorded
    Not established
Earlier observations · 4

Superseded estimates and prices, each in its original scope and dollar basis.

Totals · 3

Unit costs · 1

1Missiles & Munitions · GMLRS. Annual research, development, test and evaluation funding in the March 2024 budget presentation; FY2024 and FY2025 are request figures. Not a lifetime R&D total or actual expenditure.

Budget by fiscal year
Fiscal yearScopeAppropriationRequestEnactedQtyBudget lineSource
FY2027System: Guided Multiple Launch Rocket System (GMLRS) · United StatesRDT&E$73.6M———RequestProgram Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2027System: Guided Multiple Launch Rocket System (GMLRS) · United StatesProcurement$1.13B———RequestProgram Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2027System: Guided Multiple Launch Rocket System (GMLRS) · United StatesTotal$1.20B———RequestProgram Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2026System: Guided Multiple Launch Rocket System (GMLRS) · United StatesRDT&E$33.3M$33.3M——RequestProgram Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)EnactedProgram Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2026System: Guided Multiple Launch Rocket System (GMLRS) · United StatesProcurement$1.23B$1.23B5,496—RequestProgram Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)EnactedProgram Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2026System: Guided Multiple Launch Rocket System (GMLRS) · United StatesTotal$1.26B$1.26B5,496—RequestProgram Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)EnactedProgram Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2025System: Guided Multiple Launch Rocket System (GMLRS) · United StatesRDT&E—$20.6M——EnactedProgram Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)
FY2025System: Guided Multiple Launch Rocket System (GMLRS) · United StatesProcurement—$1.20B——EnactedProgram Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)
FY2025System: Guided Multiple Launch Rocket System (GMLRS) · United StatesTotal—$1.22B——EnactedProgram Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)

Rounds, pods and launchers are different units

The verified price refers to one extended-range unitary round. The broader GMLRS budget contains other variants; the HIMARS launcher has its own acquisition and support costs.

Contracts & purchasing · 1

Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.

Contracts and purchasing
Buyer → sellerStatusStated amountQtySource
U.S. Army → Lockheed MartinW31P4Q-23-D-0003 P00013 increases the contract amount to $13,265,440,935 through FY2027. The modification and resulting total are not additive, and do not establish spending or a round count.Contract modification$4.235B—GMLRS production contract modification P00013, August 14, 2025 U.S. Army · SAM.gov · figure Aug 14, 2025

Open research: Current U.S. inventory and complete annual operating-and-support costs require additional public evidence. Buyer records are selected examples, not a complete global order book. The displayed R&D reference is annual funding or a specified multi-year request window, not a verified lifetime total. Additional primary-source international purchase and delivery records remain to be reviewed.

What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.

Contracts$15.76B obligated on code-mapped awards

  • Code-mapped awards are every contract award in the USAspending baseline (DoD, DHS, DOE and NASA, FY2008–FY2027) whose latest reported acquisition program code is this program's, whichever company received it; vehicles (IDVs) are excluded.

By fiscal year19

Obligations by federal fiscal year
Fiscal yearObligatedActions
FY2008$363M obligated75
FY2009$652M obligated142
FY2010$4.1M obligated175
FY2011−$7.1M obligated81
FY2012$354M obligated44
FY2013$192M obligated53
FY2014−$6.8M obligated55
FY2015$92.0M obligated67
FY2016$228M obligated122
FY2017$495M obligated128
FY2018$1.34B obligated189
FY2019$1.84B obligated196
FY2020$1.85B obligated222
FY2021$1.58B obligated216
FY2022$1.08B obligated255
FY2023$3.21B obligated247
FY2024$1.62B obligated233
FY2025$583M obligated216
FY2026$297M obligated145

Contractors20

  1. Lockheed Martin$15.66B obligated 99%
  2. Northrop Grumman$17.8M obligated 0.1%
  3. Cherokee Nation Red Wing, L.L.C.$16.5M obligated 0.1%
  4. L3Harris Technologies$15.5M obligated 0.1%
  5. Boeing$7.1M obligated 0.0%
  6. Orbital ATK$4.4M obligated 0.0%
  7. Leonardo DRS$2.9M obligated 0.0%
  8. The Marvin Group$2.4M obligated 0.0%
  9. General Dynamics$2.4M obligated 0.0%
  10. RTX$1.4M obligated 0.0%
  11. Textron$599K obligated 0.0%
  12. Tec-Masters, Inc.$493K obligated 0.0%
  13. Other companies (8)$796K obligated 0.0%
  14. Recipients without a DefDex profile (35 awards)$30.8M obligated 0.2%

Reported acquisition program code 260; program scope may be incomplete or miscoded · 140 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.

Participants3

Prime

1

Supplier

2

Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.

Where It Is Built3

  • General Dynamics Ordnance and Tactical Systems
    Factory · Camden, Arkansas
    As of September 2026 General Dynamics Ordnance and Tactical Systems was close to finishing a new solid rocket motor production campus in Camden, Arkansas to support production of motors for Lockheed Martin's GMLRS.
    www.executivebiz.com www.executivebiz.com
    Component production
  • L3Harris Technologies
    Factory · Camden, Arkansas
    L3Harris opened a new solid rocket motor plant in Camden, Arkansas on Oct. 20 that brings motor production for GMLRS under one roof and is built to double its output.
    defence-blog.com defence-blog.com
    Component production
  • Lockheed Martin
    Factory · Camden, Arkansas
    In 2016 the first Guided Multiple Launch Rocket System Alternative Warhead rocket rolled off the production line at Lockheed Martin's Camden, Arkansas manufacturing facility.
    www.prnewswire.com www.prnewswire.com
    Other

Plants, shipyards, final-assembly lines, test sites and depots that build or sustain the program, and the work done at each.

Who Operates It4

  • United States
    Army
    Lockheed Martin reported delivering its 75,000th GMLRS to the U.S. Army; the saved claim does not provide a dated operational inventory.
    www.lockheedmartin.com www.lockheedmartin.com
    Customer
  • Australia
    Australian Army
    54 units planned · as of 2025
    In March 2025 the State Department approved a possible sale to Australia of 54 GMLRS Alternative Warhead rounds.
    www.dsca.mil www.dsca.mil
    Planned operator
  • Estonia
    36 units planned
    Estonia requested to purchase up to six M142 HIMARS launchers and up to 36 M30A2 GMLRS Alternative Warhead missile pods in a possible US sale.
    turdef.com turdef.com
    Planned operator
  • Sweden
    35 units planned · as of 2026
    A 2026 arms sales notification lists a possible sale to Sweden of 35 M31A2 GMLRS unitary pods with insensitive munitions propulsion system.
    www.federalregister.gov www.federalregister.gov
    Planned operator

Countries and services that operate or have bought the product. A quantity is the count a source states, labelled delivered, in service, ordered, planned or authorized with the year it is stated for; an ordered, planned or authorized count is not a delivery.

Systems1

Systems fielded, competing or used under this program.

Budget Lines

  • 0205778A
  • MIPA P-1 line 14
  • MIPA P-1 line 15
  • PMC P-1 line 14

Budget line items recorded for this program.