Program · United States · U.S. Space Force
Space Based Infrared System (SBIRS)
Space Based Infrared System (SBIRS) · Fielded · U.S. Space Force
About
The Space Based Infrared System provides missile warning, missile-defense support, battlespace awareness and technical intelligence. It combines dedicated geosynchronous satellites, sensors hosted in highly elliptical orbit, legacy Defense Support Program satellites and worldwide ground systems. Space Force operators use the integrated constellation and ground processing to maintain warning coverage as the mission transitions from older DSP capabilities.
News4
- May 25, 2017Government record (high significance)U.S. Air ForceAF rolls out fiscal 2018 space budget
- Mar 21, 2012Government record (high significance)U.S. GAOU.S. GAO - Space Acquisitions: DOD Faces Challenges in Fully Realizing Benefits of Satellite Acquisition Improvements
- Oct 31, 2003Government record (high significance)U.S. GAOU.S. GAO - Defense Acquisitions: Despite Restructuring, SBIRS High Program Remains at Risk of Cost and Schedule Overruns
- Oct 31, 2003Government recordU.S. General Accounting OfficeGAO-04-48, Defense Acquisitions: Despite Restructuring, SBIRS High Program Remains at Risk of Cost and Schedule Overruns
Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Totals · 1 | ||
| R&D program totalA lifetime program R&D total was not established. Development contracts and shared program budgets are not substituted for that total. | Not established | — |
| Unit costs · 1 | ||
| GEO-5/6 production award / satellite · derivedDerived from $1.86B divided by two GEO satellites. Historical production-award average; not full acquisition cost, lifetime R&D, launches, or the price of a HEO hosted sensor. | $930MNominal 2014 $ · award scope | SBIRS GEO-5 and GEO-6 production award, June 2014 U.S. Air Force / Space Systems Command · figure June 2014 award |
| Quantities · 3 | ||
| GEO satellites delivered · historical snapshotSix GEO satellites delivered; not a current availability assessment. HEO hosted sensors are separate and excluded. | 6U.S. only; stated source scope | SBIRS GEO-6 transfers to Space Operations Command, April 2023 Space Systems Command · figure April 2023 transfer announcement |
| Satellites + hosted sensors · combined scopeGAO combines SBIRS satellites and sensors on host satellites. These ten objects are not ten standalone GEO spacecraft. | 10U.S. only; stated source scope | Missile warning satellites: delivery risks and cost transparency, January 2026 Government Accountability Office · figure January 2026 GAO architecture table |
| U.S. procurement quantityNo comparable U.S. procurement quantity was established in this review. | Not established | — |
| Operating costs · 1 | ||
| Annual operations & supportA complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures. | Not established | — |
Totals · 1
- R&D program totalA lifetime program R&D total was not established. Development contracts and shared program budgets are not substituted for that total.Source not recordedNot established
Unit costs · 1
- GEO-5/6 production award / satellite · derivedDerived from $1.86B divided by two GEO satellites. Historical production-award average; not full acquisition cost, lifetime R&D, launches, or the price of a HEO hosted sensor.SBIRS GEO-5 and GEO-6 production award, June 2014 U.S. Air Force / Space Systems Command · figure June 2014 award$930MNominal 2014 $ · award scope
Quantities · 3
- GEO satellites delivered · historical snapshotSix GEO satellites delivered; not a current availability assessment. HEO hosted sensors are separate and excluded.SBIRS GEO-6 transfers to Space Operations Command, April 2023 Space Systems Command · figure April 2023 transfer announcement6U.S. only; stated source scope
- Satellites + hosted sensors · combined scopeGAO combines SBIRS satellites and sensors on host satellites. These ten objects are not ten standalone GEO spacecraft.Missile warning satellites: delivery risks and cost transparency, January 2026 Government Accountability Office · figure January 2026 GAO architecture table10U.S. only; stated source scope
- U.S. procurement quantityNo comparable U.S. procurement quantity was established in this review.Source not recordedNot established
Operating costs · 1
- Annual operations & supportA complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.Source not recordedNot established
Earlier observations · 1
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| GEO-5/6 production award / satellite · derivedDerived from $1.86B divided by two GEO satellites. Historical production-award average; not full acquisition cost, lifetime R&D, launches, or the price of a HEO hosted sensor. | $930MNominal 2014 $ · award scope | SBIRS GEO-5 and GEO-6 production award, June 2014 U.S. Air Force / Space Systems Command · figure June 2014 award |
- GEO-5/6 production award / satellite · derivedDerived from $1.86B divided by two GEO satellites. Historical production-award average; not full acquisition cost, lifetime R&D, launches, or the price of a HEO hosted sensor.SBIRS GEO-5 and GEO-6 production award, June 2014 U.S. Air Force / Space Systems Command · figure June 2014 award$930MNominal 2014 $ · award scope
Count satellites and hosted payloads separately
GEO satellites, HEO hosted sensors and ground systems form the SBIRS program. The six-GEO delivery snapshot and GAO’s ten-object architecture scope measure different things; neither establishes current on-orbit readiness.
Contracts & purchasing · 1
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Stated amount | Qty | Source |
|---|---|---|---|---|
| U.S. Air Force → Lockheed MartinTwo satellites under the reported production scope; no claim that this covers all prior development or launches. | GEO-5 and GEO-6 production award | $1.86B | 2 | SBIRS GEO-5 and GEO-6 production award, June 2014 U.S. Air Force / Space Systems Command · figure Jun 2014 |
International buyers · 1
| Country | Qty | Status | Source |
|---|---|---|---|
| United StatesAir Force acquisition subsequently operated by the Space Force; not foreign purchases. | 2 | Historical GEO-5/6 production order | SBIRS GEO-5 and GEO-6 production award, June 2014 U.S. Air Force / Space Systems Command · figure 2014 |
Open research: Current satellite availability, complete annual operations and lifetime SBIRS R&D are not established by these reviewed sources. The GEO-5/6 award average excludes costs outside that production contract.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
Contracts$11.43B obligated on code-mapped awards
- Code-mapped awards are every contract award in the USAspending baseline (DoD, DHS, DOE and NASA, FY2008–FY2027) whose latest reported acquisition program code is this program's, whichever company received it; vehicles (IDVs) are excluded.
By fiscal year19
| Fiscal year | Obligated | Actions |
|---|---|---|
| FY2008 | $269M obligated | 326 |
| FY2009 | $1.56B obligated | 368 |
| FY2010 | $707M obligated | 413 |
| FY2011 | $497M obligated | 500 |
| FY2012 | $425M obligated | 774 |
| FY2013 | $818M obligated | 947 |
| FY2014 | $1.11B obligated | 795 |
| FY2015 | $703M obligated | 853 |
| FY2016 | $814M obligated | 835 |
| FY2017 | $432M obligated | 970 |
| FY2018 | $510M obligated | 939 |
| FY2019 | $767M obligated | 336 |
| FY2020 | $431M obligated | 251 |
| FY2021 | $319M obligated | 195 |
| FY2022 | $401M obligated | 167 |
| FY2023 | $354M obligated | 108 |
| FY2024 | $417M obligated | 326 |
| FY2025 | $437M obligated | 748 |
| FY2026 | $466M obligated | 382 |
Contractors138
- Lockheed Martin$9.72B obligated 85%
- Northrop Grumman$241M obligated 2.1%
- General Dynamics$69.8M obligated 0.6%
- Areté Associates$51.9M obligated 0.5%
- SAIC$43.5M obligated 0.4%
- Physical Sciences Inc.$27.2M obligated 0.2%
- Innovative Defense Technologies$21.2M obligated 0.2%
- LUNA Innovations Incorporated$21.0M obligated 0.2%
- Karman Space & Defense$20.3M obligated 0.2%
- Texas Research Institute , Austin, Inc.$20.2M obligated 0.2%
- Triton Systems$19.7M obligated 0.2%
- Charles River Analytics Inc.$17.3M obligated 0.2%
- Other companies (126)$314M obligated 2.7%
- Recipients without a DefDex profile (1,156 awards)$840M obligated 7.4%
Reported acquisition program code 210; program scope may be incomplete or miscoded · 1,940 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.
Participants2
Prime
2- Lockheed MartinConfirmed

- Northrop Grumman Systems CorporationConfirmed

Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.
