Sub-agency · Code 9771
Defense Microelectronics Activity
Defense Microelectronics Activity signed $14.87B in prime contracts with 14 covered companies since FY2008.
- Part ofU.S. Department of War
Prime Contracts Awarded$14.87B obligated · FY2008–FY2026
- Obligated
- $14.87B
- FY2008–FY2026
- Contract actions
- 8,829
- 1,675 awards
- Peak year
- FY2019
- $1.64B
- Top contractor
- RTX
- 49% of obligations
’08’12’16’20’24’26
Show as table
| Fiscal year | Obligated | Actions | Awards |
|---|---|---|---|
| FY2026 (to date) | $665M | 0 | — |
| FY2025 | $1.06B | 0 | — |
| FY2024 | $1.19B | 0 | — |
| FY2023 | $1.05B | 0 | — |
| FY2022 | $705M | 0 | — |
| FY2021 | $857M | 0 | — |
| FY2020 | $892M | 0 | — |
| FY2019 | $1.64B | 0 | — |
| FY2018 | $1.17B | 0 | — |
| FY2017 | $797M | 0 | — |
| FY2016 | $555M | 0 | — |
| FY2015 | $496M | 0 | — |
| FY2014 | $364M | 0 | — |
| FY2013 | $495M | 0 | — |
| FY2012 | $811M | 0 | — |
| FY2011 | $802M | 0 | — |
| FY2010 | $499M | 0 | — |
| FY2009 | $415M | 0 | — |
| FY2008 | $402M | 0 | — |
Contractors
- Rtx$7.32B 49%
- Northrop Grumman$4.86B 33%
- Lockheed Martin$1.14B 7.7%
- BAE Systems$969M 6.5%
- General Dynamics$410M 2.8%
- Boeing$158M 1.1%
- Leidos$5.8M 0.0%
- Hii$2.7M 0.0%
- Teledyne Technologies$1.4M 0.0%
- Draper$5K 0.0%
- L3Harris Technologies$5K 0.0%
- Leonardo DRS$5K 0.0%
- V2X$5K 0.0%
- Booz Allen Hamilton−$6K -0.0%
Covered companies, including subsidiaries.
What it buys (PSC)
- R&D- Defense System: Electronics/Communication Equipment (Advanced Development)$5.51B 37%
- National Defense R&D Services; Department of Defense - Military; Experimental Development$3.70B 25%
- Modification of Equipment- Electrical and Electronic Equipment Components$2.05B 14%
- R&D- Defense System: Electronics/Communication Equipment (Engineering Development)$1.47B 9.9%
- Support- Professional: Engineering/Technical$333M 2.2%
- National Defense R&D Services; Department of Defense - Military; Applied Research$231M 1.6%
- National Defense R&D Services; Defense-Related Activities; Experimental Development$204M 1.4%
- National Defense R&D Services; Department of Defense - Military; R&D Administrative Expenses$181M 1.2%
- National Defense R&D SVCS; Department of Defense - Military; R&D Facilities & Maj Equip$148M 1.0%
- R&D- Defense System: Electronics/Communication Equipment (Applied Research/Exploratory Development)$112M 0.8%
- Maint/Repair/Rebuild of Equipment- Instruments and Laboratory Equipment$97.8M 0.7%
- R&D- Defense System: Electronics/Communication Equipment (Basic Research)$87.3M 0.6%
- Modification of Equipment- Aircraft Components and Accessories$84.2M 0.6%
- National Defense R&D Services; Defense-Related Activities; Applied Research$83.8M 0.6%
- National Defense R&D Services; Defense-Related Activities; Basic Research$74.7M 0.5%
Largest awards10
- Engineering ServicesNorthrop Grumman Systems Corporation (Northrop Grumman) · Agency not linked · USAspending ↗$384MDec 18, 2018
- Contractual Engineering Task (Cet) 21-108 for Engineering Services to Study, Design, Prototype, Integrate, Fabricate and Test Extremely High Frequency (Ehf) Terminals.RTX · Agency not linked · USAspending ↗$297MApr 28, 2021
- The Advanced Technology Support Program (Atsp) Contract Acquires Progressive Microelectronic Capability Solutions for Continued Refinement, Enhancement, and Delivery of Sense and Intercept EquipmentRTX · Agency not linked · USAspending ↗$263MSep 25, 2025
- This Task Is to Analyze, Integrate, Modify, Procure, and Deliver Solutions to Improve Operational Effectiveness, Enhance Performance for Enhanced Coyote Block 2 and Coyote Block 3 Counter Unmanned Aircraft System Solutions.RTX · Agency not linked · USAspending ↗$253MApr 13, 2023
- The Advanced Technology Support Program (Atsp) Contract Acquires Progressive Microelectronic Capability Solutions for Advanced Technology Maintainability of the Microelectronics-based Counter Unmanned Aircraft SystemRTX · Agency not linked · USAspending ↗$217MAug 27, 2024
- Engineering Services: Space Solar Power Incremental Demonstration&research (Sspidr) ProjectNorthrop Grumman Systems Corporation (Northrop Grumman) · Agency not linked · USAspending ↗$213MAug 1, 2019
- This Task Is to Produce, Procure, and Modify the Enhanced Coyote Block 2 and Block 3 Interceptors to Improve Effectiveness at Forward Operating Bases.RTX · Agency not linked · USAspending ↗$207MSep 26, 2022
- Engineering Services, Cet 18-896, Forward Expeditionary Advanced Vehicle Radar Program (Feavr). the Purpose of This Task Is to Build Prototype Expeditionary Ku Band Systems for Mine Resistant Ambush Protected (Mrap) All-terrain Vehicle (M-atv) Platforms.RTX · Agency not linked · USAspending ↗$198MSep 24, 2018
- Engineering Services, Cet 19-959, Multiple Enhanced Terminal Effector Operational Rapid Response (Meteor)RTX · Agency not linked · USAspending ↗$162MMay 28, 2019
- The Advanced Technology Support Program (Atsp) Contract Acquired Progressive Microelectronic Capability Solutions to Analyze, Design, Develop, Prototype, Procure and Deploy Operational Enhancements for the Enhanced Coyote Block 2 Prototype.RTX · Agency not linked · USAspending ↗$159MSep 21, 2023
Obligations Defense Microelectronics Activity signed on federal prime contracts (award types A–D) with the covered companies, from USAspending, FY2008 through Jul 10, 2026. Awards to other contractors are not included. Obligations include de-obligations.
Contracting Offices2
| Name | Awards | Obligated |
|---|---|---|
| Defense Microelectronics Activity | 818 | $10.67B |
| Defense Microelectronics Activity | 857 | $4.21B |
Obligations to the covered companies since FY2008, largest first.
