Advanced Arresting Gear (AAG)
Carrier aircraft recovery system installed aboard Ford-class carriers.

Program · United States · U.S. Navy
Nuclear-powered aircraft carrier class
The profile’s obligated figure counts resolved program awards from reported acquisition codes and reviewed links, with shared awards excluded; the tracker counts catalog fiscal years of resolved reviewed award links, so the figures can differ. The budget tracker separates requested, enacted, announced ceiling and obligated amounts for FY2025–FY2027: Gerald R. Ford-class aircraft carrier (CVN 78) figures cover R-1 program elements 0604112N. The figures also cover SCN lines 2001 Carrier Replacement Program and 2004 CVN-81 (printed nets, Navy FY2027 SCN book). Obligations are only the USAspending awards carrying reviewed DoW acquisition program code 223 (CVN 78). Awards are not linked by a similar name. FY2027 enacted line amounts are not loaded: P.L. 119-103 states no program-line amount. Announced ceilings are not included.
The Gerald R. Ford class is the Navy's nuclear-powered aircraft-carrier design succeeding the Nimitz class. It introduces the Electromagnetic Aircraft Launch System and Advanced Arresting Gear to launch and recover a wider range of carrier aircraft. The design also changes the flight deck, weapons handling and ship systems to support carrier air-wing operations and reduce maintenance and operating demands.
| Measure | Amount | Source |
|---|---|---|
| Totals · 9 | ||
| Ship-program RDT&ECVN 78 ship subprogram estimate. Separately reported EMALS development is $1.0797B; avoid treating the ship subtotal as all carrier-related research. | $4.885BThen-year $ | CVN 78 December 2023 MSAR, ship subprogram pp. 19, 25–27 Department of Defense · figure Dec. 2023 SAR / PB2025 |
| CVN-78 · Gerald R. FordProcured FY2008; commissioned July 2017; initial operational capability December 2021. | $13.317BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget / Dec. 2025 CRS |
| CVN-79 · John F. KennedyFY2026 budget delivery forecast: March 2027. This is a forecast, not a delivery confirmation. | $13.196BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget / Dec. 2025 CRS |
| CVN-80 · EnterpriseFY2026 budget delivery forecast: July 2030; part of the CVN-80/81 block buy. | $14.248BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget / Dec. 2025 CRS |
| CVN-81 · Doris MillerFY2026 budget delivery forecast: February 2032; part of the CVN-80/81 block buy. | $15.211BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget / Dec. 2025 CRS |
| CVN-78 procurement in 2024 dollarsCBO restates the approximately $13.3B nominal ship procurement cost using naval shipbuilding inflation. Excludes class-wide R&D; not a second charge. | $19.6BConstant FY2024 $ | An Analysis of the Navy’s 2025 Shipbuilding Plan, January 2025, pp. 21–22 CBO · figure CBO 2025 analysis |
| Four-ship lifetime O&SFour ships over 50-year service lives. Disposal is separately estimated at $37.2296B. | $214.325BThen-year $ | CVN 78 December 2023 MSAR, ship subprogram pp. 19, 25–27 Department of Defense · figure Dec. 2023 SAR |
| CVN-82 · William J. ClintonTotal procurement estimate not published in this report. FY2026 request includes $612M advance procurement, which is not a ship price. | Not established | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS |
| CVN-83 · George W. BushTotal procurement estimate not published in this report. Future planned ship, not part of the commissioned fleet. | Not established | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS |
| Unit costs · 1 | ||
| CVN-81 procurement estimateDoris Miller; not yet delivered in this source. CVN-78 final procurement: $13.3165B; CVN-79: $13.196B; CVN-80: $14.2475B. | $15.211BThen-year $ | Ford-class aircraft carrier program (FY2026 budget figures) CRS · figure FY2026 budget |
| Quantities · 2 | ||
| Commissioned Ford-class shipCVN-78 commissioned; CVN-79 delivery scheduled for March 2027 in this source. Excludes Nimitz-class carriers. | 1U.S. only | Ford-class aircraft carrier program (FY2026 budget figures) CRS · figure FY2026 budget snapshot |
| Named ships in class planCVN-78 through CVN-83; planning is not an award or delivery. | 6U.S. only | Ford-class aircraft carrier program (FY2026 budget figures) CRS · figure FY2026 budget snapshot |
| Operating costs · 1 | ||
| Annual O&S per shipProgram-office estimate covering manpower, operations, maintenance, support and improvements. Four ships, 50-year service lives, 2017–2082; not a current nominal annual bill. | $299.8M / yrConstant FY2000 $ | CVN 78 December 2023 MSAR, ship subprogram pp. 19, 25–27 Department of Defense · figure May 2023 estimate / Dec. 2023 SAR |
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| CVN-81 procurement estimate1 | $14.016BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2025 budget |
| CVN-81 procurement estimate1 | $15.211BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget |
| CVN-78 procurement estimate1 | $10.489BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2008 budget |
| CVN-78 procurement estimate1 | $12.323BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2013 budget |
| CVN-78 procurement estimate1 | $12.907BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2018 budget |
| CVN-78 procurement estimate1 | $13.317BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2025 budget |
| CVN-78 procurement estimate1 | $13.317BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget |
| CVN-79 procurement estimate1 | $9.192BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2008 budget |
| CVN-79 procurement estimate1 | $11.411BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2013 budget |
| CVN-79 procurement estimate1 | $11.377BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2018 budget |
| CVN-79 procurement estimate1 | $12.936BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2025 budget |
| CVN-79 procurement estimate1 | $13.196BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget |
| CVN-80 procurement estimate1 | $10.717BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2008 budget |
| CVN-80 procurement estimate1 | $13.874BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2013 budget |
| CVN-80 procurement estimate1 | $12.998BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2018 budget |
| CVN-80 procurement estimate1 | $13.72BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2025 budget |
| CVN-80 procurement estimate1 | $14.248BThen-year $ | Ford-class program, December 4, 2025, Tables 1–2 and oversight discussion CRS · figure FY2026 budget |
| CVN-78 inflation-adjusted procurementCBO rebasing with naval shipbuilding inflation; excludes class-wide R&D. Do not treat rebasing as additional spending. | $19.6BConstant FY2024 $ | An Analysis of the Navy’s 2025 Shipbuilding Plan, January 2025, pp. 21–22 CBO · figure January 2025 CBO |
1Same-hull budget estimate; amounts include changes in scope and inflation. See CRS Table 2.
The comparison figure uses CVN-81, the highest published procurement estimate among CVN-78 through CVN-81 in this budget. It is not a class average. Ship procurement, class development and embarked aircraft are separate scopes. A carrier’s ship cost is not the cost of its air wing or an entire carrier strike group.
CRS documents lead-ship cost growth and follow-on construction delays. The oversight record identifies new-system integration, weapons-elevator work, material availability and shipyard workforce constraints. Compare the same hull across budget years; cost-to-complete requests fund revisions to an existing ship estimate and should not automatically be added a second time.
CBO converts the lead ship’s approximately $13.3B nominal procurement cost into $19.6B in 2024 dollars using naval shipbuilding inflation. CBO says this excludes about $6B of class-wide R&D. The detailed SAR distinguishes ship-program RDT&E from the separately reported EMALS subprogram; these scopes should remain visible.
The SAR’s annual $299.8M Ford estimate and $355.2M Nimitz comparator use constant FY2000 dollars. They are planning estimates, not current annual outlays. Reduced crewing and lifecycle savings are design objectives; verify them against actual sustainment evidence before describing them as realized savings.
The U.S. Navy buys the carriers from Huntington Ingalls Industries’ Newport News Shipbuilding. The CVN-80/81 two-ship award covers a defined construction scope, not all government procurement costs. Budget requests, procurement estimates, contract awards and obligated spending answer different questions.
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Stated amount | Qty | Source |
|---|---|---|---|---|
| U.S. Navy → HII Newport News ShipbuildingCVN-80 and CVN-81, contract N00024-16-C-2116. Separate $263,096,868 R&D and $31,097,671 support modifications also announced. Total government procurement includes more than this shipbuilder award. | Design and construction modification | $14.918B | 2 | Contracts for January 31, 2019 U.S. Department of Defense · figure Jan 31, 2019 |
Open research: Operating costs retain the historical estimate and dollar basis; actual recent annual expenditure is not verified. No international purchase record is included.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
| Fiscal year | Obligated | Actions |
|---|---|---|
| FY2008 | $2.55B obligated | 109 |
| FY2009 | $2.49B obligated | 263 |
| FY2010 | $767M obligated | 409 |
| FY2011 | $818M obligated | 521 |
| FY2012 | $1.01B obligated | 609 |
| FY2013 | $640M obligated | 478 |
| FY2014 | $1.29B obligated | 298 |
| FY2015 | $1.40B obligated | 421 |
| FY2016 | $1.17B obligated | 353 |
| FY2017 | $1.23B obligated | 288 |
| FY2018 | $1.49B obligated | 388 |
| FY2019 | $1.88B obligated | 374 |
| FY2020 | $2.08B obligated | 249 |
| FY2021 | $1.49B obligated | 297 |
| FY2022 | $1.45B obligated | 320 |
| FY2023 | $2.52B obligated | 311 |
| FY2024 | $1.75B obligated | 283 |
| FY2025 | $2.15B obligated | 279 |
| FY2026 | $2.61B obligated | 177 |
Reported acquisition program code 223; program scope may be incomplete or miscoded · 154 awards. Obligations are signed USAspending prime-contract actions on the awards counted here, negative and zero actions included, credited to each award's company. Obligations are money committed, not company revenue or total program spending. How DefDex totals programs.
Newport News Shipbuilding is building the Gerald R. Ford class of aircraft carriers.
Source: hii.com
BWXT's Nuclear Operations Group manufactured the nuclear reactor components for USS Gerald R. Ford.
Source: www.bwxt.com
In 2022 Fairbanks Morse Defense won a contract of about $2 million from Newport News Shipbuilding for spare parts through Hunt Valve for CVN 78 to CVN 81.
Source: www.marinelink.com
A June 2017 General Atomics award made it the source for EMALS and Advanced Arresting Gear for the first three Ford-class carriers, CVN 78 to CVN 80.
Source: www.ga.com
In October 2008 Raytheon received a $23.5 million Navy contract to adapt Dual Band Radar equipment, hardware and software designs for CVN 78 installation and integration.
Source: www.globalsecurity.org
Roles as recorded: a prime holds the contract, teammates and subcontractors build under it, competing bidders bid against it, operators field the result.
| Site | Role | Location | Work | Source | Confidence |
|---|---|---|---|---|---|
| Newport News shipyardNewport News Shipbuilding | Final assembly | Shipyard · Newport News, Virginia | The shipyard where HII is building the Gerald R. Ford class, the first new aircraft carrier design in decades. | hii.com hii.com | — |
| Raytheon Andover vertically integrated radar development and production facilityRTX | Component production | Factory · Andover, Massachusetts | Under a $17 million Navy order reported in 2020 for Dual Band Radar spares for USS Gerald R. Ford, 70 percent of the work was to be done in Andover, Massachusetts. | www.spacewar.com www.spacewar.com | — |
| Newport News shipyardNewport News Shipbuilding | Depot sustainment | Shipyard · Newport News, Virginia | In July 2018 USS Gerald R. Ford returned to Newport News Shipbuilding for its scheduled post-shakedown and selected restricted availability. | hii.com hii.com | — |
| Norfolk Naval ShipyardNorfolk Naval Shipyard | Depot sustainment | Shipyard · Portsmouth, Virginia | Public shipyard handling Ford's planned incremental availability after its 2026 deployment. | news.usni.org news.usni.org | — |
| Raytheon Tewksbury facility (Dual Band Radar)RTX | Development | Factory · Tewksbury, Massachusetts | A $19.1 million Navy order in November 2024 funds Raytheon design-agent engineering support for the Dual Band Radar fitted to Ford-class carriers, with work including Tewksbury, Massachusetts. | militaryaerospace.com militaryaerospace.com | — |
| GA-EMS ship-set control labGeneral Atomics Electromagnetic Systems | Other | Lab · San Diego, California | In 2017 General Atomics offered hands-on EMALS and AAG crew training at its San Diego ship-set control lab as part of the first Ford spares order. | www.naval-technology.com www.naval-technology.com | — |
Plants, shipyards, final-assembly lines, test sites and depots that build or sustain the program, and the work done at each.
| Country | Service | Relationship | Quantity | Note | Source | Confidence |
|---|---|---|---|---|---|---|
| United States | United States Navy | Operator | No count statedas of 2026 | The U.S. Navy operates USS Gerald R. Ford (CVN 78), the lead ship of the class. | armyrecognition.com armyrecognition.com | — |
Countries and services that operate or have bought the product. A quantity is the count a source states, labelled delivered, in service, ordered, planned or authorized with the year it is stated for; an ordered, planned or authorized count is not a delivery.
Carrier aircraft recovery system installed aboard Ford-class carriers.
General Atomics Electromagnetic Systems
Electromagnetic aircraft catapult system installed on Ford-class carriers.
Systems fielded, competing or used under this program.
Budget line items recorded for this program.