Program · United States · U.S. Air Force

F-15E Strike Eagle

Two-seat fighter for air-to-air and air-to-ground missions.

Updated
Awarded
—
Across linked awards

Timeline8

  1. MilestoneConfirmed

    F-15E selected in dual-role fighter competition

    The Air Force selected the F-15 approach over the F-16XL, leading to production orders for the F-15E. This selection does not establish the earlier demonstrator unveiling.

  2. First flightConfirmed

    Production F-15E first flight

    Boeing dates the Strike Eagle production variant first flight; not the earlier converted demonstrator.

  3. First deliveryConfirmed

    First production F-15E delivered to Luke AFB

  4. Initial operating capabilityConfirmed

    Operational capability at Seymour Johnson AFB

  5. Combat useConfirmed

    F-15E enters combat in Desert Storm

    F-15Es took part in the opening attacks on Iraqi Scud missile sites. This dates the Strike Eagle variant, not earlier F-15 air-superiority variants.

  6. UpgradeConfirmed

    First 389th Fighter Squadron F-15E receives APG-82 radar upgrade

    The Radar Modernization Program replaced the mechanically scanned APG-70 with the APG-82(V)1 active electronically scanned array. The source dates the squadron’s first upgraded aircraft to June.

  7. UpgradeConfirmed

    First operational EPAWSS-equipped F-15Es arrive at RAF Lakenheath

    The two upgraded aircraft were assigned to the 492nd and 494th Fighter Squadrons. EPAWSS modernizes the Strike Eagle’s electronic warfare protection.

  8. MilestoneConfirmed

    GAO assessment: F-15E EPAWSS installation constraints

    GAO’s June 2025 assessment reports that the first two EPAWSS-equipped F-15Es had been fielded to test and training centers. Installation during scheduled depot maintenance began in 2024. Workforce and legacy-aircraft issues constrained installation schedules. The EPAWSS estimate includes 99 F-15E production units, 96 F-15EX production units and five development units; it is an upgrade-program quantity, not an aircraft fleet total.

Program and variant milestones. Dates show only the precision the sources give.

Cost to the GovernmentFY2027 request $751M

Program totals · 1

  • R&D program totalA separately identified lifetime development total has not been verified. This is not a zero-cost estimate.
    Source not recorded
    Not established

Unit costs · 2

  • Unit cost (per unit)USAF F-15E fact sheet 'Unit cost' in FY1998 constant dollars (commonly cited as flyaway; basis not stated on the fact sheet). Observation date set to the FY1998 price basis; fact sheet itself is undated.
    F-15E Strike Eagle (fact sheet) U.S. Air Force · figure 1998
    $31.1MBY1998 $
  • Published acquisition / aircraftHistorical fact-sheet figure; not a current replacement quote.
    F-15E fact sheet U.S. Air Force · figure Apr 2019
    $31.1MConstant FY1998 $

Quantities · 2

  • Published U.S. fleet snapshotSource inventory snapshot; subsequent retirements, transfers and losses are not inferred.
    F-15E fact sheet U.S. Air Force · figure Apr 2019
    219U.S. only
  • Program quantityA comparable total acquisition quantity has not been verified.
    Source not recorded
    Not established

Operating costs · 2

Earlier observations · 4

Superseded estimates and prices, each in its original scope and dollar basis.

Unit costs · 1

  • Published acquisition / aircraftHistorical fact-sheet figure; not a current replacement quote.
    F-15E fact sheet U.S. Air Force · figure Apr 2019
    $31.1MConstant FY1998 $

Operating costs · 3

1Historical average for the source study population; not a marginal mission cost.

Budget by fiscal year
Fiscal yearAppropriationRequestEnactedQtyBudget lineSource
FY2027RDT&E$323M———Program Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2027Procurement$428M———Program Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2027Total$751M———Program Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2026RDT&E$233M$230M——Program Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2026Procurement$469M$407M——Program Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2026Total$702M$637M——Program Acquisition Cost by Weapon System: Fiscal Year 2027 Budget Request Office of the Under Secretary of War (Comptroller) · Apr 21, 2026
FY2025RDT&E—$159M——Program Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)
FY2025Procurement—$307M——Program Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)
FY2025Total—$465M——Program Acquisition Cost by Weapon System: Fiscal Year 2026 Budget Request Office of the Under Secretary of War (Comptroller)

Reading the cost figures

The fact-sheet acquisition figure uses the dollar basis shown above. GAO’s annual operating and support cost includes a broader ownership scope than the Comptroller reimbursement rate. These figures should not be combined into a single inflation-free trend.

F-15E fact sheet U.S. Air Force · +2 more

Open research: Figures retain the date and scope of the original source. A historical count, cumulative delivery or procurement plan is not today’s mission-capable inventory. A separately identified lifetime development total has not been verified. This is not a zero-cost estimate.

What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.

Supply Chain1

Major components and the companies that make them.