Program · United States · U.S. Army
MQ-1C Gray Eagle
MQ-1C Gray Eagle · Fielded · U.S. Army
Cost to the Government
| Measure | Amount | Source |
|---|---|---|
| Program totals · 1 | ||
| PE0305219A annual Gray Eagle RDT&EAnnual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request. | $2.59M / yrNominal $; source budget basis | FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2027 · PB2027; actual / enacted / requested by year |
| Unit costs · 1 | ||
| Historical procurement budget / aircraftFY2023 $483M / 12. Program budget average, including associated scope; not a current Gray Eagle 25M flyaway quote. | $40.25MNominal $; budget-year program scope | FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2023 · PB2025 |
| Quantities · 2 | ||
| U.S. inventoryA current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count. | Not established | — |
| U.S. procurement quantityNo comparable U.S. procurement quantity was established in this review. | Not established | — |
| Operating costs · 1 | ||
| Annual operations & supportA complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures. | Not established | — |
Program totals · 1
- PE0305219A annual Gray Eagle RDT&EAnnual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2027 · PB2027; actual / enacted / requested by year$2.59M / yrNominal $; source budget basis
Unit costs · 1
- Historical procurement budget / aircraftFY2023 $483M / 12. Program budget average, including associated scope; not a current Gray Eagle 25M flyaway quote.FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2023 · PB2025$40.25MNominal $; budget-year program scope
Quantities · 2
- U.S. inventoryA current U.S. inventory was not established. Annual procurement, cumulative deliveries and production capacity are not a stockpile count.Source not recordedNot established
- U.S. procurement quantityNo comparable U.S. procurement quantity was established in this review.Source not recordedNot established
Operating costs · 1
- Annual operations & supportA complete, system-specific annual operating and support cost was not established. Procurement, replacement rounds and contract support are different measures.Source not recordedNot established
Earlier observations · 6
Superseded estimates and prices, each in its original scope and dollar basis.
| Measure | Amount | Source |
|---|---|---|
| PE0305219A annual Gray Eagle RDT&E1 | $6.681M / yrNominal $; source budget basis | FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2025 · PB2027; actual / enacted / requested by year |
| PE0305219A annual Gray Eagle RDT&E1 | $3.444M / yrNominal $; source budget basis | FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2026 · PB2027; actual / enacted / requested by year |
| PE0305219A annual Gray Eagle RDT&E1 | $2.59M / yrNominal $; source budget basis | FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2027 · PB2027; actual / enacted / requested by year |
| Annual aircraft procurement / modification funding2 | $483MNominal $; source budget basis | FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2023 · PB2025 historical budget snapshot |
| Annual aircraft procurement / modification funding2 | $15MNominal $; source budget basis | FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2024 · PB2025 historical budget snapshot |
| Annual aircraft procurement / modification funding2 | $23.9MNominal $; source budget basis | FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2025 · PB2025 historical budget snapshot |
- PE0305219A annual Gray Eagle RDT&E1FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2025 · PB2027; actual / enacted / requested by year$6.681M / yrNominal $; source budget basis
- PE0305219A annual Gray Eagle RDT&E1FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2026 · PB2027; actual / enacted / requested by year$3.444M / yrNominal $; source budget basis
- PE0305219A annual Gray Eagle RDT&E1FY2027 R-1: Research, Development, Test & Evaluation Department of Defense Comptroller · Apr 2026 · figure FY2027 · PB2027; actual / enacted / requested by year$2.59M / yrNominal $; source budget basis
- Annual aircraft procurement / modification funding2FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2023 · PB2025 historical budget snapshot$483MNominal $; source budget basis
- Annual aircraft procurement / modification funding2FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2024 · PB2025 historical budget snapshot$15MNominal $; source budget basis
- Annual aircraft procurement / modification funding2FY2025 Program Acquisition Costs by Weapon System DoD Comptroller · Mar 2024 · figure FY2025 · PB2025 historical budget snapshot$23.9MNominal $; source budget basis
1Annual research appropriation/reference, not lifetime development cost. FY2025 figures in PB2025 are requests; PB2027 shows FY2025 actuals, FY2026 enacted/spend plan, FY2027 request.
2Annual program funding in the cited budget vintage; not a unit price, contract award, or actual delivery count.
Recent funding sustains an existing fleet
PB2025 identifies engines and navigation upgrades. It does not request new air vehicles in the displayed FY2025 column; this does not imply zero fleet inventory.
Support estimates include more than fuel and flying hours
GAO identifies 31% lifetime O&S growth in the FY2023 review, including longer service, crew and maintainer costs and previously omitted engineering services. No complete annual cost per aircraft is inferred.
Contracts & purchasing · 1
Ceilings, options and purchase agreements are not spending and are never added together. Obligations are under Contracts.
| Buyer → seller | Status | Value | Qty | Source |
|---|---|---|---|---|
| U.S. Army → Raytheon / RTXCSP v3 payload procurement supporting Gray Eagle; not an airframe order or finalized recurring sensor price. | Undefinitized sensor contract | $118M | — | Gray Eagle CSP v3 sensor procurement, March 2024 U.S. Army · figure Mar 18, 2024 |
International buyers · 1
| Country | Qty | Status | Source |
|---|---|---|---|
| United StatesBudget request, not evidence of deliveries or a current fleet inventory. | Not verified | U.S. procurement customer | Gray Eagle CSP v3 sensor procurement, March 2024 U.S. Army · figure Dated source snapshot |
Open research: Buyer records are selected examples, not a complete global order book. Current U.S. inventory requires additional public evidence; procurement quantities are not inventory. Complete system-specific annual operating and support costs were not established.
What the government budgets and pays for this program, from budget justification books, appropriations, acquisition reports and contract announcements. Each figure states its dollar basis. What contractors were obligated is under Contracts.
Contracts$5.62B obligated since FY2008
Contractors3
- General Atomics$5.58B 99%
- BAE Systems$38.0M 0.7%
- Honeywell International$136K 0.0%
Awards50
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES 24-28U.S. Army · Delivery Order · Sep 22, 2025$7.0Mobligated · up to $7.0M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY 24-28.U.S. Army · Delivery Order · May 6, 2025$13.8Mobligated · up to $13.8M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY24-28 FOLLOW-ON CONTRACT.U.S. Army · Delivery Order · Apr 10, 2025$7.8Mobligated · up to $7.8M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY24-28 FOLLOW ON CONTRACT FOR GRAY EAGLE UNCREWED AIRCRAFT SYSTEMS.U.S. Army · Delivery Order · Feb 26, 2025$28.6Mobligated · up to $28.6M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY24-28 FOLLOW ON CONTRACT FOR GRAY EAGLE UNCREWED AIRCRAFT SYSTEMS.U.S. Army · Delivery Order · Jan 22, 2025$4.4Mobligated · up to $4.4M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY24-28 FOLLOW ON CONTRACT FOR GRAY EAGLE UNCREWED AIRCRAFT SYSTEMS.U.S. Army · Delivery Order · Dec 10, 2024$8.9Mobligated · up to $8.9M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) 2 STARSHIELD SERVICES GROUND AND FLIGHT VERIFICATION (PHASE 3).U.S. Army · Delivery Order · Jul 15, 2024$50.3Mobligated · up to $53.2M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY 24-28 FOLLOW-ON CONTRACT FOR GRAY EAGLE UNCREWED AIRCRAFT SYSTEM.U.S. Army · Delivery Order · Jun 11, 2024$8.7Mobligated · up to $8.7M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY 24-28 FOLLOW-ON CONTRACT FOR GRAY EAGLE UNCREWED AIRCRAFT SYSTEM.U.S. Army · Delivery Order · May 30, 2024$6.0Mobligated · up to $6.0M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICESU.S. Army · Delivery Order · May 17, 2024$57.5Mobligated · up to $57.5M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE PERFORMANCE BASED LOGISTICS 2024-2029U.S. Army · Definitive Contract · Apr 18, 2024$788Mobligated · up to $2.60B ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY24-28 FOLLOW ON CONTRACT FOR GRAY EAGLE UNCREWED AIRCRAFT SYSTEM.U.S. Army · Delivery Order · Mar 28, 2024$5.6Mobligated · up to $5.6M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICE FY19-23 APACHE CLASS C FLIGHT TEST.U.S. Army · Delivery Order · Mar 28, 2023$14.5Mobligated · up to $14.5M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19 - 23 FOR GRAY EAGLE AIRCRAFT SYSTEMS JOINT TECHNOLOGY CENTER SYSTEM INTEGRATION LAB (JSIL) AND THE GRAY EAGLE MODELING, NAVIGATION, AND INTEGRATION (GEMNI) SUPPORT FY23U.S. Army · Delivery Order · Feb 28, 2023$31.3Mobligated · up to $31.3M ceiling
- General Atomics Aeronautical SystemsFY23 WARRIOR GRAY EAGLE BLOCK 0 CONTRACT LOGISTICS SUPPORTU.S. Army · Definitive Contract · Dec 28, 2022$97.1Mobligated · up to $145M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECH SERVICESU.S. Army · Delivery Order · Dec 27, 2022$7.6Mobligated · up to $7.6M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19 - 23 FOR GRAY EAGLE AIRCRAFT SYSTEM PROGRAM MANAGEMENT FY23 OMA.U.S. Army · Delivery Order · Dec 16, 2022$8.9Mobligated · up to $8.9M ceiling
- General Atomics Aeronautical SystemsFY19-23 GRAY EAGLE TECHNICAL SERVICES CONTRACT.U.S. Army · Delivery Order · May 13, 2022$11.3Mobligated · up to $11.3M ceiling
- General Atomics Aeronautical SystemsJOINT TECHNOLOGY CENTER SYSTEM INTEGRATION LAB (JSIL)/GRAY EAGLE MODELING, NAVIGATION AND INTEGRATION (GEMNI) SUPPORT FY22.U.S. Army · Delivery Order · Feb 17, 2022$32.9Mobligated · up to $32.9M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19 - 23 FOR GRAY EAGLE AIRCRAFT SYSTEM PROGRAM MANAGEMENT FY22-OMA.U.S. Army · Delivery Order · Feb 17, 2022$5.4Mobligated · up to $5.4M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE TECHNICAL SERVICES (GETS) FY22 GOVERNMENT FURNISHED EQUIPMENT (GFE) MAINTENANCE AND REPAIRU.S. Army · Delivery Order · Nov 30, 2021$6.2Mobligated · up to $6.2M ceiling
- General Atomics Aeronautical SystemsMQ-1C GRAY EAGLE EXTENDED RANGE FULL RATE PRODUCTION VIU.S. Army · Definitive Contract · Nov 18, 2021$130Mobligated · up to $130M ceiling
- General Atomics Aeronautical SystemsJOINT TECHNOLOGY CENTER SYSTEM INTEGRATION LAB (JSIL)/GRAY EAGLE MODELING, NAVIGATION AND INTEGRATION (GEMNI) SUPPORT FY21 GRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Feb 16, 2021$44.9Mobligated · up to $44.9M ceiling
- General Atomics Aeronautical SystemsPROGRAM MANAGEMENT FY21 - AIRCRAFT PROCUREMENT, ARMY (APA GRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Feb 16, 2021$6.2Mobligated · up to $6.2M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE FY19-23 TECHNICAL SERVICES - GOVERNMENT FURNISHED EQUIPMENT REPAIRS/REQUIRED UPGRADES FY21 TECHNICAL SERVICES MEMORANDUM (TSM) 3.AS.1.0.U.S. Army · Delivery Order · Jan 20, 2021$5.9Mobligated · up to $5.9M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19 - 23 FOR GRAY EAGLE AIRCRAFT SYSTEMU.S. Army · Delivery Order · Dec 22, 2020$114Mobligated · up to $114M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Jul 29, 2020$6.5Mobligated · up to $6.5M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Jul 15, 2020$6.6Mobligated · up to $6.6M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · May 27, 2020$29.9Mobligated · up to $29.9M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Mar 25, 2020$5.6Mobligated · up to $5.6M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Jan 29, 2020$6.2Mobligated · up to $6.2M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19- FY23 FOR GRAY EAGLE AIRCRAFT SYSTEMU.S. Army · Delivery Order · Oct 30, 2019$7.4Mobligated · up to $7.4M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Oct 22, 2019$8.6Mobligated · up to $8.6M ceiling
- General Atomics Aeronautical SystemsREQUIREMENT IS FOR THE PROCUREMENT OF FULL RATE PRODUCTION 5.U.S. Army · Definitive Contract · Jul 15, 2019$398Mobligated · up to $398M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Jul 3, 2019$54.1Mobligated · up to $54.1M ceiling
- General Atomics Aeronautical SystemsBASIC CONTRACT W58RGZ-19-C-0030 IS TO PROVIDE CONTRACT LOGISTICAL SERVICES (CLS) FOR THE WARRIOR A AND BLOCK 0 SYSTEMS REQUIREMENT WITHIN THE UNMANNED AIRCRAFT SYSTEM.U.S. Army · Definitive Contract · Jun 28, 2019$257Mobligated · up to $473M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · Jun 5, 2019$7.5Mobligated · up to $7.5M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · May 22, 2019$62.4Mobligated · up to $62.4M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · May 17, 2019$12.5Mobligated · up to $12.5M ceiling
- General Atomics Aeronautical SystemsGRAY EAGLE ENGINEERING SERVICESU.S. Army · Delivery Order · May 17, 2019$5.0Mobligated · up to $5.0M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FOR GRAY EAGLEU.S. Army · Delivery Order · May 6, 2019$7.9Mobligated · up to $7.9M ceiling
- General Atomics Aeronautical SystemsREQUIREMENT IS FOR THE PROCUREMENT OF PERFORMANCE BASED LOGISTICS SUPPORT SERVICES FOR THE MQ-1C GRAY EAGLE UNMANNED AIRCRAFT SYSTEM.U.S. Army · Definitive Contract · Apr 19, 2019$1.90Bobligated · up to $3.76B ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19-23 FOR GRAY EAGLE AIRCRAFT SYSTEMU.S. Army · Delivery Order · Apr 19, 2019$15.2Mobligated · up to $15.2M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19-23 FOR THE GRAY EAGLE AIRCRAFT SYSTEMU.S. Army · Delivery Order · Mar 8, 2019$36.7Mobligated · up to $36.7M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19 - 23 FOR GRAY EAGLE AIRCRAFT SYSTEMU.S. Army · Delivery Order · Mar 8, 2019$5.5Mobligated · up to $5.5M ceiling
- BAE Systems Information and Electronic Systems Integration Inc.TASK ORDER 0002 AWARD UNDER INDEFINITE DELIVERY INDEFINITE CONTRACT W56KGY-16-D-0013 FOR TACTICAL SIGNAL INTELLIGENCE PAYLOAD INTERIM CONTRACTOR LOGISTICS SUPPORT. THIS PARTICULAR EFFORT FUNDS SUSTAINMENT AND OPERATIONS.U.S. Army · Delivery Order · Jan 25, 2019$38.0Mobligated · up to $50.8M ceiling
- General Atomics Aeronautical SystemsENGINEERING SERVICES FY19 - 23 FOR GRAY EAGLE AIRCRAFT SYSTEMU.S. Army · Delivery Order · Sep 28, 2018$9.1Mobligated · up to $9.1M ceiling
- General Atomics Aeronautical Systems3 LOTS OF MQ-1C GRAY EAGLE EXTENDED RANGE AIRCRAFT UNIQUE INITIAL SPARES AND 3 LOTS OF GROUND SUPPORT EQUIPMENT (GSE)U.S. Army · Definitive Contract · Sep 13, 2018$52.1Mobligated · up to $52.1M ceiling
- General Atomics Aeronautical SystemsBASIC CONTRACT W58RGZ-17-C-0035 IS TO PROVIDE CONTRACT LOGISTICAL SERVICES (CLS) FOR THE WARRIOR A AND BLOCK 0 SYSTEMS REQUIREMENT WITHIN THE UNMANNED AIRCRAFT SYSTEM AND PROVIDE SUSTAINMENT SUPPORT AND MAINTENANCE SUPPORT OF SUPPLIES AND EQUIPMENT AT TWO SITES IN CONTIGUOUS UNITED STATES AND SUPPORT OF MULTIPLE OUTSIDE CONTIGUOUS UNITED STATES SITES INCLUDE SUSTAINING SUPPORT FOR DEPOT OPERATIONS, SUPPORT EQUIPMENT TO ASSIST ON SITE FIELD SERVICE REPRESENTATIVES AND ORIGINAL EQUIPMENT MANUFACTURER MAINTENANCE TO THE WARRIOR CONTRACT FOR THE SHADOW TACTICAL UNMANNED AIRCRAFT SYSTEM.U.S. Army · Definitive Contract · Dec 15, 2016$195Mobligated · up to $226M ceiling
- General Atomics Aeronautical SystemsIGF::CT::IGF FY17 GRAY EAGLE PERFORMANCE BASED LOGISTICS (PBL) EFFORT.U.S. Army · Definitive Contract · Oct 21, 2016$937Mobligated · up to $1.13B ceiling
Obligations are signed USAspending prime-contract actions coded to this program, FY2008 to date, credited to the company that received each action. Obligations are money committed, not company revenue.
