Contracting office · Code SPRDL1
DLA Land Warren
DLA Land Warren signed $9.66B in prime contracts since FY2008.
Prime Contracts Awarded$9.66B obligated · FY2009–FY2026
- Obligated
- $9.66B
- FY2009–FY2026
- Contract actions
- 24,667
- 12,691 awards
- Peak year
- FY2018
- $1.06B
- Top contractor
- General Dynamics
- 8.6% of obligations
’09’13’17’21’26
Show as table
| Fiscal year | Obligated | Actions | Awards |
|---|---|---|---|
| FY2026 (to date) | $542M | 0 | — |
| FY2025 | $547M | 0 | — |
| FY2024 | $527M | 0 | — |
| FY2023 | $657M | 0 | — |
| FY2022 | $438M | 0 | — |
| FY2021 | $168M | 0 | — |
| FY2020 | $1.01B | 0 | — |
| FY2019 | $1.05B | 0 | — |
| FY2018 | $1.06B | 0 | — |
| FY2017 | $894M | 0 | — |
| FY2016 | $508M | 0 | — |
| FY2015 | $271M | 0 | — |
| FY2014 | $216M | 0 | — |
| FY2013 | $140M | 0 | — |
| FY2012 | $362M | 0 | — |
| FY2011 | $359M | 0 | — |
| FY2010 | $442M | 0 | — |
| FY2009 | $475M | 0 | — |
Contractors
- General Dynamics$836M 8.6%
- Oshkosh Corporation$722M 7.5%
- RTX$363M 3.8%
- Honeywell International$195M 2.0%
- Leonardo DRS$186M 1.9%
- BAE Systems$179M 1.8%
- L3Harris Technologies$101M 1.0%
- Leidos$64.5M 0.7%
- Moog$36.0M 0.4%
- Curtiss-Wright$35.3M 0.4%
- All other$106M 1.1%
Companies, with their subsidiaries counted under the parent.
Defense programs
- M1/M1A1 Abrams Tank$14.9M 0.2%
- ABV$9.9M 0.1%
- FMTV$3.9M 0.0%
- Apache (AH-64A)$2.7M 0.0%
- Bradley FVS$2.7M 0.0%
- Sluas Phase 1$1.4M 0.0%
- HMMLTV$466K 0.0%
- AMPV$353K 0.0%
- JLTV$113K 0.0%
- Stryker$48K 0.0%
Only awards coded to a DoW acquisition program.
What it buys (PSC)
- Vehicular Brake, Steering, Axle, Wheel, and Track Components$394M 4.1%
- Diesel Engines and Components$318M 3.3%
- Electrical and Electronic Assemblies, Boards, Cards, and Associated Hardware$290M 3.0%
- Vehicular Power Transmission Components$171M 1.8%
- Fire Control Computing Sights and Devices$167M 1.7%
- Guns, Through 30MM$164M 1.7%
- Miscellaneous Communication Equipment$153M 1.6%
- Night Vision Equipment, Emitted and Reflected Radiation$134M 1.4%
- Optical Sighting and Ranging Equipment$107M 1.1%
- Electrical Control Equipment$105M 1.1%
- Engine Electrical System Components, Nonaircraft$102M 1.1%
- Miscellaneous Vehicular Components$63.2M 0.7%
- Miscellaneous Fire Control Equipment$56.4M 0.6%
- Navigational Instruments$53.1M 0.5%
- Fire Fighting Equipment$49.2M 0.5%
Largest awards10
Obligations DLA Land Warren signed on federal prime contracts (award types A–D) from USAspending, FY2008 through Jul 7, 2026. Obligations include de-obligations.
