Contracting office · Code W58RGZ
W6QK ACC-RSA
W6QK ACC-RSA signed $179.71B in prime contracts since FY2008.
Prime Contracts Awarded$179.71B obligated · FY2008–FY2026
- Obligated
- $179.71B
- FY2008–FY2026
- Contract actions
- 93,356
- 21,299 awards
- Peak year
- FY2012
- $13.73B
- Top contractor
- Boeing
- 27% of obligations
’08’12’16’20’24’26
Show as table
| Fiscal year | Obligated | Actions | Awards |
|---|---|---|---|
| FY2026 (to date) | $9.39B | 0 | — |
| FY2025 | $9.68B | 0 | — |
| FY2024 | $7.20B | 0 | — |
| FY2023 | $10.02B | 0 | — |
| FY2022 | $4.82B | 0 | — |
| FY2021 | $6.41B | 0 | — |
| FY2020 | $8.49B | 0 | — |
| FY2019 | $7.66B | 0 | — |
| FY2018 | $7.96B | 0 | — |
| FY2017 | $10.31B | 0 | — |
| FY2016 | $10.13B | 0 | — |
| FY2015 | $8.62B | 0 | — |
| FY2014 | $9.44B | 0 | — |
| FY2013 | $11.94B | 0 | — |
| FY2012 | $13.73B | 0 | — |
| FY2011 | $11.62B | 0 | — |
| FY2010 | $10.23B | 0 | — |
| FY2009 | $9.85B | 0 | — |
| FY2008 | $12.23B | 0 | — |
Contractors
- Boeing$48.06B 27%
- Lockheed Martin$41.48B 23%
- General Atomics$11.78B 6.6%
- Textron$10.70B 6.0%
- GE Aerospace$9.65B 5.4%
- Northrop Grumman$5.39B 3.0%
- RTX$3.00B 1.7%
- Amentum$2.89B 1.6%
- Honeywell International$2.55B 1.4%
- BAE Systems$1.92B 1.1%
- All other$5.42B 3.0%
Companies, with their subsidiaries counted under the parent.
Defense programs
- Tactical UAV$7.32B 4.1%
- CH-47F$7.29B 4.1%
- AH-64E Remanufacture$6.94B 3.9%
- CH-47D$5.97B 3.3%
- MQ-1C Gray Eagle$5.58B 3.1%
- Apache (AH-64A)$4.28B 2.4%
- Flraa$4.04B 2.2%
- CH-47F Block II$3.64B 2.0%
- Black Hawk (UH-60A/L)$2.86B 1.6%
- AH-64E NEW Build$2.31B 1.3%
- All other$4.17B 2.3%
Only awards coded to a DoW acquisition program.
What it buys (PSC)
- Aircraft, Rotary Wing$60.26B 34%
- Unmanned Aircraft$14.36B 8.0%
- Hardware, Weapon System$14.00B 7.8%
- Maint/Repair/Rebuild of Equipment- Aircraft and Airframe Structural Components$7.64B 4.3%
- Gas Turbines and Jet Engines, Aircraft, Prime Moving; and Components$7.15B 4.0%
- Support- Management: Logistics Support$6.81B 3.8%
- National Defense R&D Services; Defense-Related Activities; Experimental Development$4.04B 2.2%
- Airframe Structural Components$3.98B 2.2%
- Electronic Countermeasures, Counter-Countermeasures and Quick Reaction Capability Equipment$2.66B 1.5%
- Miscellaneous Aircraft Accessories and Components$2.60B 1.4%
- Support- Professional: Engineering/Technical$1.87B 1.0%
- Miscellaneous Engine Accessories, Aircraft$1.72B 1.0%
- Helicopter Rotor Blades, Drive Mechanisms and Components$1.63B 0.9%
- Aircraft, Fixed Wing$1.15B 0.6%
- National Defense R&D Services; Department of Defense - Military; R&D Administrative Expenses$1.10B 0.6%
Largest awards10
- Multi Service, 5 Yr, Multi-yr Contract for H-60 Helicopters. FY2012 FY2016 Production Contract for Army/navy/fms UH/HH/MH-60 Helicopters to Include Procurement of Up to 916 Each Aircraft and Related Support, Services, Systems/project Management, Publications, and Technical Data. FMS Countries Include Saudi Arabian National Guard (Sang), Taiwan, Thailand and Royal Australian Navy (Ran). · Sikorsky (Lockheed Martin) · U.S. Army · USAspending ↗$11.60B
- Procurement of 54 Each Army UH-60M Black Hawk Helicopters; 18 Each Navy MH-60S Sea Hawk Helicopters; 25 Each Navy NH-60R Sea Hawk Helicopters; 9 Each UH-60M Black Hawk Helicopter for Bahrain Defense Force; Tooling; Program Systems Management; Technical Publications. · Sikorsky (Lockheed Martin) · U.S. Army · USAspending ↗$9.97B
- The Future Vertical Lift (Fvl) Flraa Capability Set Three Is A Pre-major Defense Acquisition Program (Acat 1C) Commissioned to Develop and Field the Next Generation of Affordable Vertical Lift Tactical Assault / Utility Aircraft for the Army. · Textron · U.S. Army · Future Long Range Assault Aircraft · USAspending ↗$4.04B
Obligations W6QK ACC-RSA signed on federal prime contracts (award types A–D) from USAspending, FY2008 through Jul 10, 2026. Obligations include de-obligations.
